LHC Civil Engineering Activities for YETS – LS2

Slides:



Advertisements
Similar presentations
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Advertisements

LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Survey Meeting John Osborne, CERN 8 February 2016
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
EN-CV activities for LHC during LS2
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
Jan 2016 Solar Lunar Data.
Framework Schedule from EYETS 2016 to LS2
YETS & LS2 Works EN-El on LHC / Power distribution
Identification of the unused cables
VENTILATION OF AD TARGET Kick off meeting
Equipment simplified model SMR UR safety
ELENA installation and commissioning status
EYETS LHC 2016/2017 Works EN/EL/CF
Report to: Overhaul Plating
CE Status: Activities executed until 03/08 and ongoing
YETS & LS2 Reminder G. Girardot 20 juin 2017.
Special LS1 day on 12 June 2012, EDMS:
Julie Coupard Schedule and Coordination
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
Accelerator and Experiment Interface Session: LS2, LS3
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
CRG activities for EYETS 2016
CV maintenance works during YETS
A very first look at siting issues
RWTCS Steering Commitee
Current Status Future Progress Monitoring
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
East Hall under construction
Status of ATF/ATF2 and machine schedule in this fall
2018 Safety Group 1 – 5 Year Program Timeline Guide
2017 Safety Group 1 – 5 Year Program Timeline Guide
Mammoth Caves National Park, Kentucky

LS1 status 28/04/2014.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2019 Safety Group 1 – 5 Year Program Timeline Guide
Experimental Areas – LS2 planning
2014 Advantage Program Timeline Guide *** Progress Visits ***
2014 Advantage Program Timeline Guide *** Progress Visits ***
Births as per Civil Registration System,
2016 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group 1 – 5 Year Program Timeline Guide

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

LHC Civil Engineering Activities for YETS – LS2 YETS - LS2 Coordination Meeting 03 Octobre 2017 LHC Civil Engineering Activities for YETS – LS2

Activities Overview - YETS Task Name Duration Requestor Area Safety ECR support needed Link Impact generated LHC - YETS (12/12/17 --> 23/03/17)   Point 1 Professional visits Dec->Mar SMB/SE RR17 - RR13 / Installation of optical target and initial survey 2 days RI171 - 2 futurs connections EN/ACE-SU 1-Yets Coring of the concrete floor for installation GGPSO 1 day C04R1 / RI17 /DCUM 161 YES HSE/RP - EN /ACE-SU No Passage C04L1 / RI13 /DCUM 26497 2-Yets LS2 Storage Platform 2 months Atlas Surface VIC LS2 move the fence 10 Days protection for water cooling towers 3 Days EN/CV 3-Yets Sector 3-4 Lateral channel cleaning + culverts 3 days Inspect for Leaks Sector 3 - 4 Installation polyéfine Band 2-4 days EN/HE 4-Yets Consignation GMR Dessableurs cleaning C25L4 Drain Inspection Point 5 RR53 - RR57 R571 - 2 futurs connections 5-Yets C04L5 / R532 /DCUM 13247 6-Yets Excavation in the concrete floor for installation of a lifting platform * 10 days UL55 - USC55 EN/CV-EN/EL- HSE/RP 7-Yets CMS Storage Area / Move the fences CMS 8-Yets In progress Point 7 Dismantling Access PZ76 BE/ICS Check sump pit and pump PM76 * Work for Yets is still to be confirmed HILUMI Project Works for other Goups Maintenance

Activities Overview – LS2 Task Name Duration Requestor Area Safety ECR support needed Link Impact generated LHC - LS2 (DEC 2018 --> DEC 2020)   base chantiers Point 1 professional visit and EDL With contractor 18 --> 20 SMB/SE RR13 --> RR17 / Installation of monitoring tools for geometry survey and regular survey 9-LS2 Connection of the UPR 17 in 2019 Sep --> Nov RI171 / C05R1 --> C07R1 VIC YES EN/CV, EL, HE - HSE/RP No Passage Connection of the UPR 13 in 2020 Mar --> June RI132 / C04L1 --> C06L1 10-LS2 No passage Gallery and duct construction in 2020 June --> Dec surface 11-LS2 Point 2 New Computing farm 6 months Alice Surface Point 3.3 Dismantling Access PZ33 10 days BE/ICS Surface PZ33 EN/CV - EN/EL No Access Sector 3-4 Lateral channel cleaning + culverts 3 days RP Inspect for Leaks 1 day Sector 3 - 4 Installation polyéfine Band 2-4 days Consignation GMR replacement old iron sheets of recovery water 15 days Dessableurs cleaning 2 days Sector 3-4 / C25L4 Drain Clearing 80 Days 18-LS2 Point 4 Dismantling Access PZ45 Surface PZ45 Technical gallery for Surface Cryogenics Point 5 Dismantling Access PZ56 Surface PZ56 RR53 --> RR57 12-LS2 Connection of the UPR 57 in 2020 Feb --> Apr R571 14-LS2 Connection of the UPR 53 in 2020 May --> July R532 13-LS2 Excavation in the concrete floor for installation of a lifting platform EN/HE UL55 - USC55 EN/CV, EL - HSE/RP 7-LS2 (Yets or LS2) Gallery and duct construction 2020 No 15-LS2 SXA 5 Building 2019 -> 2020 Atlas 16-LS2 Point 7 Dismantling Access PZ76 Surface PZ76 Check sump pit and pump PM76 EN/CV Point 8 LHCB 17-LS2 Waiting for informations HILUMI Project Works for other Goups Maintenance