Preparations for the SiD Workshop at Fermilab, April 9-11

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Linear Collider Detector R&D Support John Jaros SiD Workshop at SLAC August 22, 2012.
White Papers, Framework Proposals, FOA’s, and LCDRD John Jaros SiD Meeting Oregon ALCPG March 23, 2011.
The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
Snowmass, August 16, 2005 H.Weerts SiD Design Goals and Plans for Snowmass Snowmass H.Weerts Argonne Nat. Lab./ Michigan State Univ.
ILD meeting Welcome/Introduction 2015/4/23 Y. 1.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
Closing remark Weiguo Li, IHEP 9 th ACFA workshop and GDE Meeting Feb. 7, 2007 IHEP, Beijing.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
7 th February 2007ILC ACFA workshop - Beijing 1 ILC Detector R&D Tracking Review – Progress Report Chris Damerell RAL On behalf of the ILC Detector R&D.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
@ Future Plans for SiD & Opportunities for collaboration H.Weerts Argonne National Lab.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
How we’re organizing ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Advisory Meeting December 11, 2006 Tracking Review at Beijing.
ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
SiD R&D Priorities Andy White University of Texas at Arlington SiD Workshop at SLAC March 2009.
SiD Detector Baseline (A brief review) Andy White University of Texas at Arlington.
22 nd October 2007Vertex detector review - intro Chris Damerell 1 ILC Detector R&D Vertex detector review October 2007 Some introductory remarks.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
4th Concept Detector G P Yeh TILC08, Sendai, Japan Mar. 3-6, 2008.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
SiD Detector Concept R&D Perspective Andy White SiD R&D Coordinator University of Texas at Arlington.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
How to organize ourselves Rich Partridge, Marcel Demarteau for the Tracking Group SiD Tracking Meeting December 8, 2006 Tracking Review at Beijing.
Status of Preparation Roman Pöschl LAL Orsay Linear Collider Workshop LCWA09 Albuquerque NM Sept./Oct
CLIC detector & physics study -- Intro and general news -- Lucie Linssen Lucie Linssen, CLICdp 2-day meeting, October 1st Detector model CLIC &
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
SiD Workshop University of Oregon November 2010 Summary of DBD Planning Andy White.
7 October 2005SiD tracking – Chris Damerell 1 Chris Damerell Rutherford Appleton Lab  New charge, given to us by ILCSC on 27 th September (following meeting.
5 th prepatorial meeting 26/10/09. Organisation Committees Programme Committee: F. Sefkow (DESY), J. Yu (UTA), V. Vrba (FZU Prague), K. Kawagoe (Kobe.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
Marcel Stanitzki Rutherford Appleton Laboratory
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Agenda items TEB activities at KILC TDR SVN repository roll-out
Organization and Goals for the Workshop
SiD R&D Plan and Opportunities for New Collaborators
100th meeting Ties Behnke, DESY
Introductory remarks David Ward
SiD Calorimeter R&D Collaboration
LC Test Beam Activities
CALICE News The 2007 beam tests have started!
PDAP Junji Haba, KEK.
Workshop Goals for the Detector Groups
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
News item and introduction of working groups
Introduction to the Workshop
CLIC detector at SiD meeting 28/3/2010
ILD subdetectors ILD session, ALCPG07 26-Oct-07 Hitoshi Yamamoto.
The SiD Detector Outline Overview
January Collaboration Meeting
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Upcoming CALICE meetings
WP 10 Data treatment Software
Presentation transcript:

Preparations for the SiD Workshop at Fermilab, April 9-11 SiD Advisory Meeting March 12, 2007 Marcel Demarteau

Workshop Goals Workshop webpage can be found at http://ilc.fnal.gov/detector/rd/sid/sid07.htm Registration is unfortunately just be email Apologies for arcane registration procedures The primary goals of the workshop are: To review the status of SiD software tools Define the SiD R&D plans Discuss the necessary steps to work towards the SiD Conceptual Design Report All speakers should indicate possibilities for new people to take on certain responsibilities within SiD In addition, there are two major detector reviews coming up in the near future: Review of Calorimetry at LCWS07 (DESY) Review of Vertex Detector Technologies at ALCPG07 (Fermilab) SiD Advisory Meeting, Feb. 26, 2007, M. Demarteau

Workshop Schedule: Monday 1:30pm – 15:30pm: parallel sessions Vertexing and Tracking Calorimetry FCAL No parallel for software since it spans all subdetectors 16:00 – 17:30 Not allocated yet Maybe start with overview of goals, physics talk? 18:00: beer at the user’s center SiD Advisory Meeting, Feb. 26, 2007, M. Demarteau

Workshop Schedule: Tuesday Morning Plenary 0: Intro from Pier/Young-Kee/Mont on ILC Detector R&D Intro from John/Harry What are the SiD priorities for the next 6-12 months What are the main goals for SiD in terms of preparation for a CDR Plenary I: Reviews Tracking Review post-mortem (30 mins) What worked, what didn’t work ? Action plan as outcome of the review ? EM Calorimeter R&D plans and goals (30 mins) HAD Calorimeter R&D plans and goals (30 mins) Preparations for LCWS07 calorimetry Damerell review What do we present and how ? How do we treat the collaboration with CALICE? What is the timescale for SiD critical decisions on technology? How do we decide? Plenary II Status of PFA (30 mins) Non-PFA Calorimetry: Ron Cassell (30 mins) Dumping PFA: Adam Para (30 mins) SiD Advisory Meeting, Feb. 26, 2007, M. Demarteau

Workshop Schedule: Tuesday Afternoon Plenary III: Benchmarking Overview Status of benchmarking What does the benchmarking group want to see from each subsystem in terms of software development What tools are missing? Prioritized list of tool development What physics benchmarking topics are SiD’s highest priority that allows optimization of critical detector parameters at the same time Physics requirements on L,E,P measurements Plenary IV: MDI, FCAL and interplay with other subdetectors Status of FCAL, ECAL, Beamcal in SiD What are the physics requirements that drive the specifications for these detectors? Status and R&D plans for these systems Dinner at Chez Leon; fixed price of about $35 including wine and gratuity SiD Advisory Meeting, Feb. 26, 2007, M. Demarteau

Workshop Schedule: Wednesday Morning Plenary I: Software Overview Status of tracking software and plans for next 6-12 months Status of vertexing software and plans for next 6-12 months Status of calorimeter software and plans for next 6-12 months Status of FCAL, muon software Plenary II Tracking status and R&D plans electrical Tracking status R&D plans mechanical Vertex status and R&D plans Muon status and R&D plans SiD Advisory Meeting, Feb. 26, 2007, M. Demarteau

Workshop Schedule: Wednesday Afternoon Plenary III: R&D Test beam plans at Fermilab and SLAC Are resources adequate? What should SiD ask for in terms of resources for detector R&D? Overall SiD R&D plans (Andy) Prospects for Detector R&D Funding Plenary IV: The Road Forward John/Harry Close by 15:30 for Fermilab Colloquium ILC-LHC Workshop starts Thursday, April 12-14 SiD Advisory Meeting, Feb. 26, 2007, M. Demarteau