Phase Camera hardware Nothing really new, only summarising status

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

256 channel data acquisition system for VISTA focal plane to readout sixteen 2k x 2k VIRGO detectors Largest ever such system.
Max-Planck-Institut für Gravitationsphysik - Albert-Einstein-Institut DC Meeting Golm - Karsten Kötter1 Current status of DAQ System
1 Detector meeting, Cascina, Quadrant diode configuration ‘X’ or ‘+’ configuration? ISYS quadrant diodes.
European Gravitational Observatory25/01/20061 Alignment : Hardware & Software Status Henrich Heitmann, Julien Marque with the contribution of: INFN Frascati,
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
Dennis Coyne Excomm Jan 26, 2004
Lecture 2 Computer Communications and Networks Boriana Koleva Room: C54 Phone:
AS Computing F451 F451 Data Transmission. What data is transmitted? Phone SMS Radio TV Internet.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
CIS 103 — Applied Computer Technology Last Edited: September 17, 2010 by C.Herbert Wireless Home Networks.
Assignment 2 1. Wong Mun Sim, Sylvia (s970588) Group member :
VIRGO Control System Upgrade: Multi-DSP Board Alberto Gennai INFN Pisa LIGO-G Z.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
Phase camera development for gravitational wave detectors
Messages asynchronously reads or writes a block of data to another module on a network. Controller communication done using local or remote messages. local.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
L0 Workshop 17/10/2007 Wilco Vink / Martin van Beuzekom Leo Wiggers / Sander Mos 1 Commissioning/Status Pile-Up System.
MODEM B Y K H U S H. With the evolution of technology, world has contracted in to a small village. One single click on your computer can connect you to.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
Integration and commissioning of the Pile-Up VETO.
Scrum meeting. Mechanical Done. Cut material in sizes, ready for assembly the frame. Build a prototype for the rim. The belts, barings and gears.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
Development of Phase Camera for Advanced Virgo (Experimental part) Kazuhiro Agatsuma Martin van Beuzekom, Mesfin Gebyehu, Laura van der Schaaf, Jo van.
Calva update Nicolas Leroy for the CALVA group (LAL, ESPCI, LAPP, LMA) Main Laser Cavity 1Cavity 2 Aux. Laser L1 L2 M1M2M3.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
1 Phase Camera CRE S. Bigotta, L. Bonelli, A. Di Lieto, A. Toncelli, M.Tonelli INFN – Pisa University P. La Penna EGO.
TPC laser DCS status at NBI by Gaël Renault reported by B. S. Nielsen 6 Oct 2005.
15 May 2012NA61 Collaboration Meeting, Budapest1 Shine: status and plans András László, for the Shine Group.
LKr status R. Fantechi.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Claudia Cecchi University of Perugia and INFN
RICH Status from last RICH meeting
Large Area Endplate Prototype for the LC TPC
ProtoDUNE Installation Workshop - DAQ
Online Database Status
Comments on the DAQv2 advancement
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
Scintillating Fiber/Clear Fiber QA and Ribbon Production
THS5671EVM Test with TSW1400EVM
WP02 PRR: Master Oscillator and RF Reference Distribution
Overview Communication is the transfer of information from one place to another. This should be done - as efficiently as possible - with as much fidelity/reliability.
Carlos Abellan Milano, May 18th 2016
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Hall A Compton Electron detector overview
Work packages status in Torino and perspectives
EILERSEN The Weighing experts.
Unit 1.4 Wired and Wireless Networks Lesson 1
University of California Los Angeles
University of California Los Angeles
Simulink Implementation of a Cable Modem
Introduction to Computing Lecture # 1
Electronics: Demod + 4Q FE
ERL BPM System Mike Billing, Mark Palmer
UK ECAL Hardware Status
Project planning and status (February 2018)
University of California Los Angeles
Introduction to the new operation procedures
UK CMS Oversight Committee Mtg
EEG Probe Project Grant G. Connell.
Chapter 8 I/O.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Periodical meeting about the 'control system ‘
Pierluigi Paolucci & Giovanni Polese
Project planning and status (May 2018)
LIU BWS Firmware status
Presentation transcript:

Phase Camera hardware Nothing really new, only summarising status 3 electronics boxes (dig. processing) ready ADC characterisation ongoing (need few days more) Then shipping to EGO site Prototype in EE-room will be replaced (main difference is mechanics) 2 PDs ready DC gain adapted Not tested, laser setup at Nikhef not yet operational Swap currently installed PD of PC1 Electrical splitter box ready Will be shipped together with other boxes Replaces prototype in EE-room Cabling (electrical and fibres) for PC2, PC3 are at EGO site Installation to be done in collaboration with Flavio Also 2 coaxial cables between EE-rooms and other rooms needed. Martin van Beuzekom TCS-PC meeting 13 May 2016

Software Not all channels showed up data in dataDisplay We have 22 ‘channels’ with power and phase info 11 demodulated PD frequencies, and 11 electrical reference frequencies Power and phase of a channel is transmitted as one word The power of the 11 ref. frequencies always showed zero, phase was non-zero The power info in the raw data packets on the TOLM network were not zero PC digital boards send out information -> display problem For long time I thought to be due to the Dictionary But at Nikhef, it works.. And now it (suddenly?) also works in Virgo, nothing changed in our code, maybe there was an update of dataDisplay? I will check regularly whether it remains OK Martin van Beuzekom TCS-PC meeting 13 May 2016

Martin van Beuzekom TCS-PC meeting 13 May 2016

Next steps Next thing to get going for PC2/PC3 is the control of the mirrors via standard Virgo DAC channels For PC1 use we an external generator At the moment we do not yet have a DAQ-box at Nikhef Hence can’t test it Martin van Beuzekom TCS-PC meeting 13 May 2016