LCLS-II Cryoplant Controls Readiness to Procure

Slides:



Advertisements
Similar presentations
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Advertisements

Managing the Information Technology Resource Jerry N. Luftman
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Effective Methods for Software and Systems Integration
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
E.Matias Canadian Light Source. Where is Saskatoon?
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Chiller control system Lukasz Zwalinski – PH/DT.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
LCLS-II Cryoplant Overview
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Installation Package - Electrical
Cryogenic Plant Controls - Configuration
Director’s Progress Review Closeout Meeting
Camera PDR/CD1 Planning 19 September 2008
ITIL: Service Transition
Cryoplant Installation Cost and Schedule Installation PDR
Cryoplant Controls Installation
Cryogenic Plant Controls – Cost and Schedule
Cryogenic Plant Electrical and Controls
2K Cold Box FDR Introduction
2K Cold Box PDR Introduction
Cryoplant Installation Overview
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
PSS Plans for Improved Reliability and Availability
Evaluating Onsite Design Project Team
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LCLS-II 2K Cold Box Controls Design Review
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
2K CB FDR Overview:  Agenda, Charge, Review Process
LCLS Linac Technical Design Review Charge
FIRELEC Migration Solution
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
May08-06.
FIRELEC Migration Solution
Cryoplant Installation Design Summary
2K Cold Box Cost, Schedule & Staffing
2K Cold Box Cost, Schedule & FDR Summary
Documenting Your PLC System
PLC Hardware Components.
LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.
PLC Coding and Local HMI
Scope, Requirements Deliverables & Schedule
Documentation Chris Scanlon and Ritendra Bhattacharya
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
Control Hardware & Status
Testing Plan and Status
SNS Cryoplant Commissioning Past Experiences
Linac LLP Outline LINAC Long Lead Procurements
FIRELEC Migration Solution
Extraction Michael Bevins May 17, 2007
Command and Data Handling
© 2015 Cengage Learning. All Rights Reserved.
DOE Review of the LCLS Project October 2006
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
LCLS Control System Personnel Linac & BC2 Controls progress
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

LCLS-II Cryoplant Controls Readiness to Procure Dana Arenius Sept 13, 2017

Readiness (1) Response: 1a. The controls of the remaining equipment be purchased is the same components used on subsystems which have been reviewed and approved for procurement. Peer review of the on-going balance of the controls have been conducted and recommendations have been evaluated and incorporated into the design. 1b. Lessons learned through both design and operational experience have been used in the control hardware which represent a high level of performance, reliability, and cost effective approach from past projects as SNS, CEBAF, and 12 GeV upgrade. LCLSII Cryoplant Controls FDR Sept 13, 2017

Readiness (2) Resonse: 2a. The control architecture presented shows a clearly defined approach with PLC hardware approved for use by SLAC 2b. Location of control cabinets were a part of the Installation Design FDR and approved for construction 2c. Assembly and control wiring documentation was reviewed as a part of the Installation Design FDR to ensure the installation GC contractor has sufficient reference documentation for interconnection of the subsystems. This includes input and output tagging, wiring and labeling 2d. The spares I/O cards planned are consistent with the amount of usage experience in similar plants with 20% of spare card slots for expansion. LCLSII Cryoplant Controls FDR Sept 13, 2017

Readiness (3) Response: 2e. The type of PLCs, I/O modules, etc. have been discussed and agreed with SLAC. These types have been used within previously approved subsystem design control cabinet assemblies. 2f. JLab documentation clearly depicts internal cabinet layout, equipment locations, touch-safe contacts, internal LED lighting, etc. LCLSII Cryoplant Controls FDR Sept 13, 2017

Radiness (4) Response: 3a. Control cabinets are adequately located and approved for installation as part of the Installation Design FDR. 4a. All known ES&H aspects and design aspects have been addressed in the design inclusive of voltage separation, labeling, maintenance space allocation, no touch terminals, etc. 4b. Not all cabinets are approved by NRTL. Approvals are usually attributed to standard, mass produced industry products which justifies approval costs. LCLSII Cryoplant Controls FDR Sept 13, 2017

Readiness (5) Response: 5c. Emergency/Stop switches are provided on panels and cabinets of rotating machinery but not generally through the plant since the refrigerator is not a production line. 6a The design majority is based on the components of the P&IDs and documentation already released for installation and/or subsystems 6b,c,d Documentation inclusive of specificattons, interface documents and associated drawing packages have been well defined and already part of many of the reviewed and approved installation documents LCLSII Cryoplant Controls FDR Sept 13, 2017

Readiness (6) Response: 7a. The current cost estimate is reasonable to achieve the planned technical scope which is based on vendor budgetary quotations. The cost estimate is ~$1.5M. 7b. Adequate schedule time has been allotted for both fabrication and delivery of material coupled to a timely completion of the FDR. LCLSII Cryoplant Controls FDR Sept 13, 2017

May I answer any questions? LCLSII Cryoplant Controls FDR Sept 13, 2017