1.3 GHz Bladetuner Concerns

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Signal port flange and beam pipe Norihito Ohuchi 2009/10/27122nd S1-G Webex meeting.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
1 MicroPot Prototype Work in Progress Jaak Lippmaa Helsinki Group, Helsinki Institute of Physics, University of Helsinki CERN, February, 2006.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
3.9 GHz Cryomodule Transport December 17, 2007 Mike McGee, Chuck Grimm & Warren Schappert 3.9 GHz CM Transport Review.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
S1 Global Plug Compatibility CAD Tools & Collaboration April 23, 2008 Don Mitchell, FNAL.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
What’s Inside a TESLA Cryomodule Tom Peterson Proton Driver Meeting February 9, 2005.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Cavity and Cryomodule Plug-Compatibility To Reach Consensus Akira Yamamoto ILC-08, Chicago, Nov. 17, 2008 Nov. 17, 2008ILC-08 SCRF1.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
LCLS II Tuner Mechanics; Accessibility/Replacement E. Borissov, Yu.Pischalnikov SRF cavity Tuner Workshop, FNAL, Oct. 13.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov (FNAL) S1-Global tuners.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov for FNAL Tuner team.
Development of Cryo-Module Test System (CMTS-1) S.B. Jawale Head, Centre for Design and Manufacture BARC, Trombay, Mumbai Cryo-Module Test System.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Tuners for 1.3 GHz Elliptical Cavities Warren Schappert Fermilab TD/I&C Thursday May 29, 2013.
3.9 GHz Cryomodule Design Tom Peterson, Yun He, Matt Kramp 20 November 2015 Preliminary Design Review.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
SPL RF coupler: integration aspects
TDR guideline discussion on Cavity Integration
CERN – Zanon discussions
Status and plans for the 3.9 GHz section of XFEL
Cryomodule Overview and EDMS Usage
Meeting for S1-Global module design Cryomodule and Cryogenics
S1-G Webex meeting Global Design Effort
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Yamamoto WG3: ML-SCRF Parallel Session,
TESLA Cryomodule Design Ratinales
Summary of the checking items of the Module-C design
IHEP Cryomodule Status
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
Presentation transcript:

1.3 GHz Bladetuner Concerns Bladetuner Installation Options onto a 1.3 GHz cavity Don Mitchell / Chuck Grimm, FNAL, 18 NOV 2008

Current cavity vessel designs w/ tuners Tuner mounting option overview Agenda Current cavity vessel designs w/ tuners DESY / KEK / FNAL Tuner mounting option overview Center mounted End mounted around lugs End mounted w/ short lug spacing Design issues Discussion

DESY / KEK / FNAL Cavities

Cross-sections of DESY / KEK / FNAL FNAL (G3a)

INFN Tuner, Center Mounted

INFN Tuner, End Mounted (built around lugs) Older style tuner shown

INFN Tuner, End Mounted

DESY, FNAL center, FNAL end

Tuner Position vs. Optional Position A center mounted tuner interferes with the warmup / cooldown line. INFN has already fixed this problem at Zanon. Solution: Move BT assy and cooldown tube

New Tuner moved forward An end mounted tuner interferes with the HGRP support legs. Bladetuner rods also need to be lengthened and rotated to leave room for the needle bearing blocks. The bladetuner motor interferes with the 5K shield. Piezos are off the neutral axis and, at least one, will interfere with support legs.

Center Position vs. End Position Bellows, in shear, support cavity Cavity acts like cantilevered beam 100 X Cavity sag Uneven vessel deflection 1 X

Preliminary FEA Center mounted bellows End mounted bellows

Pros and cons of each option Discussion Pros and cons of each option Stability Functional Plug-compatible Sticking Piezos Tested and proven Future plans Build Test Evaluate Proposals Should CM2 at Fermilab be built with standard BTs mounted on center as a complete test of the design? Should we switch to an alternate design?