What are DM folks working on?

Slides:



Advertisements
Similar presentations
Astronomy of the Next Decade: From Photons to Petabytes R. Chris Smith AURA Observatory in Chile CTIO/Gemini/SOAR/LSST.
Advertisements

Network Management Access Security Capabilities draft-bonica-opsec-nmasc-00 Ron Bonica Syed Ahmed.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master The Dome Project Bill Gressler Telescope.
Dave Jent, PI Luke Fowler, Co-PI Ron Johnson, Co-PI
Jeff Kantor LSST Data Management Systems Manager LSST Corporation Institute for Astronomy University of Hawaii Honolulu, Hawaii June 19, 2008 LSST Data.
Solutions Center Jack Kufahl November 1, Purpose The Solutions Center provides consultation, user, and technical services in support of the faculty,
Building a Framework for Data Preservation of Large-Scale Astronomical Data ADASS London, UK September 23-26, 2007 Jeffrey Kantor (LSST Corporation), Ray.
LIGO- GXXXXXX-XX-X Advanced LIGO Data & Computing Material for the breakout session NSF review of the Advanced LIGO proposal Albert Lazzarini Caltech,
Safety Council Meeting Tucson Arizona 10 – 11 April Safety Council Meeting Tucson Arizona 10 – 11 April 2014 LSST Project Status Victor L. Krabbendam.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Introduction to LSST Data Management Jeffrey Kantor Data Management Project Manager.
1 Large Synoptic Survey Telescope Update for Astronomy & Astrophysics Advisory Committee February 2012 Nigel Sharp.
Environmental Satellite Product and Distribution System (ESPDS) GOES-R Access Subsystem (GAS) John Linn ESPDS System Engineering 7 October 2009.
Key Performance Metrics and End-to-End Testing
Control Software Integration German Schumacher T&S Software Lead.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
1 EGEE-Gr3RdParties-Athens, University of Athens University of Athens Communication Networks Laboratory (CNL) Network Operations and Management.
HOPI Update Rick Summerhill Director Network Research, Architecture, and Technologies Jerry Sobieski MAX GigaPoP and TSC Program Manager Mark Johnson MCNC.
NOAO Brown Bag Tucson, AZ March 11, 2008 Jeff Kantor LSST Corporation Requirements Flowdown with LSST SysML and UML Models.
Telescope Integration and Tests Tuesday Afternoon.
1 Jacek Becla, XLDB-Europe, CERN, May 2013 LSST Database Jacek Becla.
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
DC2 Post-Mortem/DC3 Scoping February 5 - 6, 2008 DC3 Goals and Objectives Jeff Kantor DM System Manager Tim Axelrod DM System Scientist.
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
Doing EPO Now. Constraints on use of MREFC (construction) funds During construction we can build infrastructure to enable EPO during operations, but not.
LSST VAO Meeting March 24, 2011 Tucson, AZ. Headquarters Site Headquarters Facility Observatory Management Science Operations Education and Public Outreach.
1 NGVLA WORKSHOP – DECEMBER 8, 2015 – NRAO SOCORRO, NM Name of Meeting Location Date - Change in Slide Master Computing for ngVLA: Lessons from LSST Jeffrey.
The Large Synoptic Survey Telescope Project Bob Mann LSST:UK Project Leader Wide-Field Astronomy Unit, Edinburgh.
R2 Themes and Historical Context for Observatory Management & Data Product Generation.
Commonwealth of Massachusetts Executive Office of Health and Human Services EOHHS Infrastructure Consolidation and Rationalization October 2008.
Documenting Camera Base Facility Needs P Hascall.
Dodd/Cutri Feb 20, 2008 LSST DMS Applications Organizational Structure Applications Project Manager: S. Dodd Project Scientist*: R. Cutri Deputy Project.
1 OSG All Hands SLAC April 7-9, 2014 LSST Data and Computing - Status and Plans Dominique Boutigny CNRS/IN2P3 and SLAC OSG All Hands meeting April 7-9,
Visualizations for the Public from the LSST Integrated Model Suzanne Jacoby, Bill Schoening, John Andrew, Chris Smith … August 18,
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
Commissioning Planning
Super Computing 2016 Salt Lake City, Utah Nov 15, 2016
AmLight-ExP: Collaboration at 100G
National Research Platform Meeting August 6-7, 2017
Verification Matrix Process
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Timeline and November Review Outcomes
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Education and Public Outreach goals and priorities
FiberCo/WaveCo Update
The Utah Education Network Classroom Technology: What IT Needs to Know
02C.08 International Communications and Base Site
From LSE-30: Observatory System Spec.
Observing Modes: Nominal and Degraded
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning: FY18 Planning
Summit-Base Tiger Team and IT Services Committee Results
Integration & Commissioning
Design and Demo of AtlanticWave/SDX
LSST Quality Assurance Mario Juric, University of Washington LSST Data Management Subsystem Scientist Joint Technical Meeting 2017 March 6-8th, 2017.
Safety Management - NOAO-AURA-LSST Base Facility Addition
Chuck F Claver LSST System Scientist & Commissioning Lead
LDF “Highlights,” May-October 2017 (1)
NCSA Plan for DPP: Construction and Operations of the LSST Data Facility Don Petravick, Paul Domagala, Margaret Johnson Joint Technical Meeting March.
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
CHILEAN NETWORKS La Serena to Santiago Fiber. Contract 1. $5,760,000 IRU Base to AURA Gatehouse Fiber. Contract 1a. IRU AURA Gatehouse.
Management Breakout: MREFC Budget Summary Victor L
User instrument policy
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
MATERIAL PRESENTED PROPRIETARY
Integration and Test Organization Chart
Presentation transcript:

What are DM folks working on? International Communications and Base Site Team LSST AHM (Aug, 2017)

02C.08 International Communications and Base Site: The Team Jeff Kantor Ron Lambert Luis Corral Guido Maulen TCAM Network Architect Network Engineer IT/Network Tech + NCSA support (Matt Kollross under WBS 02C.07) + 1 new hire in September 2017 (Sys Eng/Admin) Plus many contract resources REUNA (Sandra Jacque, Paola Arrellano & team) Telefonica (Sandra Antonieta Abarca Poblete, Julio Gonzalez Alarcon, Juan Francisco Rojas Grimberg, & team) FIU/Amlight (Chip Cox, Julio Ibarra, Heidi Morgan, J. Bezerra, & team)

02C.08 International Communications and Base Site HQ Site HQ Facility Observatory Management Science Operations Education and Public Outreach Archive Site Archive Center Alert Production Data Release Production Calibration Products Production EPO Infrastructure Long-term Storage (copy 2) Data Access Center Data Access and User Services French Site Satellite Processing Center Data Release Production Summit Site Summit Facility Telescope and Camera Data Acquisition Crosstalk Correction Base Site Base Center Long-term storage (copy 1) Data Access Center Data Access and User Services

02C.08 International Communications and Base Site Includes these networks: Summit – Base (Telefonica/Cobra install fiber, Raylex install DWDM equipment, AURA/REUNA operate) Base LAN (AURA procure/install/operate) Base – Santiago (Telefonica/Cobra install fiber, Raylex install DWDM equipment, REUNA operate) Santiago– Chicago (FIU/AmLight provision, manage operations, ESNet participation) Does not include: Summit Network (T&S 04C.12.5 WBS with same TCAM and Technical Lead as 02C.08) Chicago to Archive (DM 02.07.04 WBS under NCSA) Chicago to Lyon (IN2P3 responsibility) Base Site Includes installation and operating costs during MREFC, supporting Commissioning at Base Site Base Center Chilean DAC (design and procurement in WBS 02C.07 under NCSA)

02C.08 International Communications and Base Site Integrated LSST Network Engineering Team (LSST:NET) NET provides engineering, test, management coordination, virtual Network Operations Center (NOC) across all networks and WBS LSST Network Operations and Management Plan (document-11918) LSST Long-Haul Networks End-to-End Test Plan (document-14789) Summit – Base ITC Design Tiger Team (SBTT) SBTT provides engineering, test, management coordination across all subsystems and WBS with ITC resources at Summit – Base Complex (Had session on Monday afternoon) Summit Base ITC Design Document (LSE-309)