LHCb electronics, 13th October 2016

Slides:



Advertisements
Similar presentations
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
Advertisements

Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Management Committee Summary Effort at CERN Operational Tasks Cost Sharing and New Expenses ZDC Collaboration Management roles Papers, Conferences and.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Versatile Link The Versatile Transceiver Towards Production Readiness Csaba Soos on behalf of Manoel Barros Marin, Stéphane Détraz, Lauri Olanterä, Christophe.
8 x Touch = Magic! Get fast results from your database and these proven touch campaigns.
Ken Wyllie, CERN LHCb electronics, 3rd September LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm, ): 8 th October 3 rd December.
Status of Readout Board Firmware Guillaume Vouters On behalf of the MiniDAQ developers 11 December 2014 LHCb Upgrade Electronics.
AMERICAN SERENADE All about Monthly Clubs 11/24/14.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
Ken Wyllie, CERN LHCb electronics, 10th April LHCb Upgrade Electronics Meetings in 2014 (Thursday, 2pm): 12 th June 14 th August 9 th October 11.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
LHCb Calorimeter Meeting – 2 nd December 2015 Calorimeter upgrade update Universitat de Barcelona, Institut de Ciències del Cosmos ICC-UB Laboratoirede.
The Versatile Link System-level Component Tests
Ken Wyllie, CERN LHCb power supplies, 19th May Does each sub-detector have enough power supplies for the upgrade???? If not, do they need: More.
Ken Wyllie, CERN Tracker ASIC, 5th July Overview of LHCb Upgrade Electronics Thanks for the invitation to Krakow!
Ken Wyllie, CERN LHCb electronics, 8th October LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm): 3 rd December
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Current STS Readout Concept 1 FEB 8 STS-XYTER Electrical Interface SLVS/LVDS pairs/FEB ROB GBTx / VL Optical Interface 4 MM fibers /ROB DPB.
HCAL upgrade FPGA FW: tasks and issues 12 May2016 Tullio Grassi, Univ. of Maryland.
CJA 444 Complete Class NEW - Does not Include Week 5 Individual Check this A+ tutorial guideline at 444-NEW/CJA-444-Complete-Class-NEW-
PSY 340 Complete Class Version 3 Check this A+ tutorial guideline at Y-340/PSY-340-Complete-Class-Guide For more classes.
of the Upgraded LHCb Readout System
NESLL Topsfield Winter Clinics
For more information please contact:
Cabling for LHCb Upgrade
Control of ASICs via GBTx
Using Unifrog to complete your UCAS application
National Art Honor Society and TR Art Club Regular meetings the 1st and 3rd Thursday of each month at 4:30 in AS105 Thursday: September 21st Workshop:
General aspects: Optical links :
Associate degree in nursing
S. Baron - BE/BI-PH-ESE GBT/VL meeting
REGISTRAR’S OFFICE Shared Service Center
HF/HE Electronics Radiation Testing
Important School Dates
Introduction LOI Hardware activities and GBT Simulations
Lions Christmas 2013 Fundraising Project.
UT Optical Connections
Adrian Bevan, Dave Brown, Marco Ciuchini, and Achille Stocchi
Psychology 1000 Research Requirement
CHEP 2004: Communicating with authors using InDiCo
SCHEDULE Nov 1st - Assembly Table Complete
Back to School Night 6th Grade Math Lab.
WELCOME to TWEPP-16.
LHCb electronics, 12th June 2014
HV distribution and discussion
Calorimeter upgrade meeting
Stylistics and discourse analysis
Work Experience at ntc The Key Details.
WP1 Vidyo Meeting 16 October 2018
College Application Process & FAFSA
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Mrs. Parris’s Class This week in: Homework this week:
Mrs. Jensen’s Weekly News Important Dates What are we learning?
TSF Upgrade Project Overview Resources Plans and Timetable
College Application Process
September NHS Meeting September 20,2016.
EPILEPSY SUPPORT GROUP
EPILEPSY SUPPORT GROUP
Celebration of Learning
American Literature Tuesday, October 21st
RADWG Meeting February 2017
Open Bowling Times 9:30 pm – 12 Midnight Moonrock
Presentation transcript:

LHCb electronics, 13th October 2016 LHCb Upgrade Electronics Meetings in 2016 (Thursday, 2pm): 1st December http://lhcb-elec.web.cern.ch/lhcb-elec/html/upgrade.htm Ken Wyllie, CERN LHCb electronics, 13th October 2016

LHCb electronics, 13th October 2016 News I 1st electronics Production Readiness Review completed: CLARO chip for RICH Next week is ICECAL chip for Calo PRR general guidelines: Last chance before sending credit-card details! Check all specs are fulfilled Check that all interfaces have been tested Check production plan (procurement, testing, manpower etc) etc etc…… Full list of criteria to guide review process Ken Wyllie, CERN LHCb electronics, 13th October 2016

LHCb electronics, 13th October 2016 News II Common components: GBTX production for LHCb is finished! All parts delivered to labs (please check) VERY IMPORTANT: Delivered in sealed bags. They must be stored in sealed bags (low humidity). Please periodically check the seal is still good. VTTX: 2’500 parts delivered to LHCb. Will now start shipping to labs. VTRX: Slower start to production, but all labs now have small quantities GBT-SCA Version 2: Parts available Jan – Mar 2017 LHCb electronics, 13th October 2016

LHCb electronics, 13th October 2016 News III TWEPP 2016: Good presence from LHCb: Five LHCb-related talks & some posters Next year: Santa Cruz, USA, 11th September Launch of new working group on FPGAs (in radiation) Contribution from RICH (Bucharest) this year. Mailing list to be formed: Contact me or Salvatore Danzeca to join list Related Seminar at CERN 28th October: Analysis & Mitigation of Radiation Effects on FPGAs https://indico.cern.ch/event/574635/ Ken Wyllie, CERN LHCb electronics, 13th October 2016