Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
MICE Beam Monitors - STATUS MICO Meeting January 9, 2008 Alan Bross.
MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
6/8/2006 Particle Physics Division Technical Centers 1 Vacuum Deposition Thin Film Coatings Facility at Lab 7 Eileen Hahn.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE CM 16 October 8, 2006.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
General News M.Lenti. Outlook Reminder of the RICH schedule PMs and sockets: what we have Mirrors What would change for PM holding disks if vacuum inside.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
Lithium Hydride Absorber Program Update Alan Bross.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Transmission test for waveguide Hideyuki Sakamoto Tracker Phone Meeting, 25 th May,2006 Contents Method Measured luminosity Results and next step.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
LCGT Meeting Laser & Mirror 12 December, Laser Ordered fiber amplifiers made by Nufern will be shipped on 16 th December. After the amplifiers arrive.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
ECAL LED monitoring system upgrade status 04/09/20131.
MICE Spectrometer Solenoids Step IV running
Prototype Assemblying, SiPM Characterization and QC
Completion of the MICE-US construction project
Plans for this week MWPC: wire stretching today
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
Aron Fish Imperial College Mice Video Conference 01/02/06
Status of Prototype Preparation and SiPM Characterization
Status of different Parts Budget Summary
Prototype activities update
Phase Camera hardware Nothing really new, only summarising status
The E835 SCI-FI Detector In Ferrara It has been built a scintillating fibers detector for the tracking system of exp. E835 (Charmonium spectroscopy) a.
Status of Readout Boards
Presentation transcript:

Scintillating Fiber/Clear Fiber QA and Ribbon Production Alan Bross MICE Tracker Meeting 大坂

Mirror QA As you know there was concern that the reflectivity measured for the MICE 350 micron diameter 3HF fibers was lower than expected. We have now done a complete set of tests, and no “smoking-gun” as been found, nor has any “tweak” to the process produced fibers with significantly higher QE

Fiber-Mirror QC Setup

R Measurement The measurement is really quite simple A sample fiber is excited with a 405 nm pulsed (100 Hz) LED about 2 cm from the mirror. The Signal is measured by PD1 The excitation LED amplitude is monitored by a second PD – PD2 A lock-in amp (locked into 100 Hz) measures PD1/PD2 Two measurements are made S1 – with mirror S2 – with mirror cut off and end of fiber painted black Then R is just S1/S2-1

Fiber Mirroring – Production Status Fibers cut in half   26,650 of  37,500 fibers provided by Kuraray Fibers (~50cmL) polished and quality checked   29,500  - 61 polish operations   (.8% rejected fibers) Fibers stuffed into hex pipes and frozen ready to be polished  6,000  -12 polish operations 11 Sputtering groups have been coated  8,090 fibers (.75% rejected fibers) and packaged/labeled for transport along with extra packaging for reflectivity test fibers 20 Sputtering groups have been assembled into levels (17,090 fibers), of which 15 sputtering groups have been stacked and prepped  for vacuum installation  (12,090 fibers)

Waveguide Fiber QC Nothing has happened Fibers still in box This is a problem Will take some additional manpower It is a tedious measurement I’m not sure when we will be able to get to this

Ribbon Layup Two ribbon Layup stations have been prepared with new molds

Ribbon Mold Close-Up

わかりません

Ribbon Fabrication Schedule We are planning to start production fabrication August 14th We will make 5 ribbons and then stop (Assuming 2 weeks to get these first 5 done). Ship these to IC and when they give the OK, we will start up again. The goal is to make 1 ribbon/day in production Manpower Fermilab Bob Kabinski Rolando Flores Wanda Newby UCLA Xiaofeng Yang (August 23rd for a week) Others ???? We will need additional help to maintain a 1 ribbon/day production schedule

Ribbon Production Issues There is only one – identification of center fiber All other procedures will remain the same as for prototype Channel 214 Channel 1 Channel 107 Channel 108 Channel 212 Channel 106 View from end of chuck looking at the connector end of the fibre ribbon Chuck with numbering for planes ‘V’ & ‘W’ Chuck with numbering for planes ‘X’ Mylar Centre Fibre