Review of rf structure test results

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

Single-Cell Standing Wave Structures: Design
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
CLIC drive beam accelerating (DBA) structure Rolf Wegner.
Development of an X-band Dielectric PETS C. Jing, Euclid Techlabs / ANL HG Workshop, May
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Recent 30 GHz CTF2 M. Gerbaux, S. Döbert, Jan Kovermann, R. Zennaro.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Dual Mode Cavity for Testing Effects of RF Magnetic field on Breakdown Properties A. Dian Yeremian, Valery Dolgashev, Sami Tantawi SLAC National Accelerator.
Design of Standing-Wave Accelerator Structure
Different mechanisms and scenarios for the local RF
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
Particle-in-Cell Modeling of Rf Breakdown in Accelerating Structures and Waveguides Valery Dolgashev, SLAC National Accelerator Laboratory Breakdown physics.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
Structure Nick-Names and Documentation Germana creates/created a structure traveler describing the handling (Features: each step, with date and description,
040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
June 2007, CERN. HDS 60 (cells) copper was processed from both sides Low Vg a/λ=0.16 High Vg a/λ=0.19 HDS 11 titanium Very often we do observe, that after.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
Hybrid designs - directions and potential 1 Alessandro D’Elia, R. M. Jones and V. Khan.
TWO-BEAM, MULTI-MODE, DETUNED ACCSELERATING STRUCTURE S.Kazakov 1,2, S.Kuzikov 3, V.Yakovlev 4 J.L. Hirshfield 1,5, 1 Omega-p,Inc., 199 Whitney Ave., New.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
High-gradient rf constraints W. Wuensch X-band workshop
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Detuning of T18 after high power test Jiaru Shi
1 Design and objectives of test accelerating structures Riccardo Zennaro.
Some information from Nextef For poster session in IWLC T. Higo.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Test Accelerating Structures Designs, Objectives and Critical Issues
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
Comprehensive Analysis of High Gradient RF Test Results and New RF Constraint May, 2008 Alexej Grudiev.
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Status of the CLIC main beam injectors
Optimisation of single bunch linac for FERMI upgrade
NC Accelerator Structures
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Brief Review of Microwave Dielectric Accelerators
Developments on Proposed
Summary of the test structure design
Testing Infrastructure, Program and Milestones
High Efficiency X-band Klystron Design Study
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Injector: What is needed to improve the beam quality?
Progress in the design of a damped an
5th X-Band Structure Collaboration Meeting
T18_VG2.4_Disk_#2 processing summary
Presentation transcript:

Review of rf structure test results High gradient results 30 GHz 11.4 GHz For more detailed high gradient results please see: The first ACE, June 2007 http://indico.cern.ch/conferenceDisplay.py?confId=15452 The x-band structure design and testing workshop: June 2007 http://indico.cern.ch/conferenceDisplay.py?confId=15112 The High-Gradient workshop, October 2006 http://hg2006.web.cern.ch/HG2006 Steffen Döbert, ACE, 16.01.2008

Damage in high field areas Copper Tungsten

Clamped-Iris Structure Tests in CTF II

Accelerating Structure Tests in CTF II Short, 16 ns rf pulses New Record for classical accelerating structures !

Overview of 30 GHz results Reached nominal 30 GHz CLIC values : 150 MV/m 70 ns Molybdenum shows higher gradient but different slope HDS performs worse than round brazed structure

Hybrid Damped Structure (HDS) CLIC damped and detuned accelerating structure: 30 GHz, 150 MV/m, 70 ns, < 10-6 trip probability

Accelerating Structures made out of milled quadrants HDS60

New Materials for High-Gradient Copper has still the best performance at low break down rate

Damage vs aperture or group velocity HDS60 Large HDS60 Small Evidence for correlation between damage and power flow (a,vg,P): Criteria for optimizing rf designs (P/C): Px(t1/3)/p/2a < threshold

Parameters for 30 GHz test strcutures

Recent 30 GHz results C40vg8_pi/2 HDS4vg2.6_thick_150deg

NDS4_vg2.5_thick result

Summary of 30 GHz results in 2007 Probing phase advance and P/C theory

Summary of 30 GHz results Structure 2a (mm) P (MW) E (MV/m) All measured data at 70 ns pulse length and 10-3 breakdown rate Structure 2a (mm) P (MW) E (MV/m) PT1/3/C (wue) C30vg4.7 3.5 20.2 92 7.5 HDS60vg8.0 3.8 16.1 61 5.6 HDS60vg5.1 3.2 13.3 75 5.5 C40vg7.4_pi/2 4.0 19.2 65 6.2 HDS4vg2.6_thick 67 2.8 NDS4vg2.5_thick 8.6

First CLIC x-band structure One tested at KEK and one tested at SLAC 150 MV/m peak, 125 MV/m avg 150 ns pulse length No breakdown monitoring

Typical NLC/GLC prototype structures Length: 60 cm Phase advance: 120 deg Group velocity: 4 % a/l: 0.17 Es/Eacc: 2.2 Pin (65 MV/m): 59 MW Coupler: mode luncher Preparation: H-brazing, diamond turning

Performance of NLC/GLC structures 58 60 62 64 66 68 70 72 10 -2 -1 Breakdown rate per hour Average gradient FXC3 FXB-006 FXB-007 H60vg4R17 H60vg4S17-1 H60vg4S17-3 FXD1 FXC5 Average trip rate goal

Hybrid damped structures (HDX) at x-band Frequency scaling Scaled structures show very similar performance HDS-type structures show consistently limited performance

A reference structure for CLIC from NLC Length: 53 cm Phase advance: 120 deg Group velocity: 3 % a/l: 0.13 Es/Eacc: 2.2 Pin (65 MV/m): 41 MW Coupler: mode luncher Preparation: H-brazing, diamond turning

Tests of old NLC structures at short pulses T53vg3MC can be used as a first reference for the new CLIC parameters CLIC goal

Pulse Length Dependence

Summary of 11 GHz results Structure P (MW) E (MV/m) PT1/3/C (wue) All data around ~10-6 breakdown rate Structure P (MW) E (MV/m) PT1/3/C (wue) T53vg3MC (50ns) 118 110 18 T53vg3MC (100ns) 107 105 20 H75vg3 (150 ns) 155 97 27 HDX11vg5 (70 ns) 59 60 9 First result on power ramping during filling: 100 ns ramp (50%-100%) + 100 ns flat top: 97 MV/m at 10-6 BDR

Tapered Damped Structure Test in ASSET Successful experimental verification of strong cell damping and benchmarking of codes Test results

Assembly of a three cell SW structure made by KEK SLAC/KEK results on short SW accelerating structures 3D model of single cell SW structure Assembly of a three cell SW structure made by KEK David Martin Yasuo Higashi, KEK

Breakdown rate vs. accelerating gradient, all breakdowns, flat pulse, a/l~0.21 Time of flat pulse after filling time Time of flat pulse after filling time Single Cell SW1 Single Cell SW2 V. Dolgashev, S. Tantawi

Conclusions on recent structure tests (some of them preliminary) Current CLIC design within experimentally demonstrated region 27 wue have been measured (Design used 18) 120 MW input Power for 100 ns into first cell of T53 (the structures showing a promising gradient are not damped) Hybrid Damped Structures show performance deficit (short phase advance, slots, quadrants and milling) Copper is still the best material to make accelerating structures (Molybdenum still has some potential, shallow slope seen in previous experiments could be due to iris clamping, slow processing as usual) Exactly scaled structures seem to perform independent of frequency (therefore 30 GHz test are still meaningful) Some doubts on P/C theory used to optimize this years structures Quadrant technology appears not mature Short phase advance seems not beneficial

The end, reserve slides following

Post mortem inspection of HDX11cu High Current Region Scattered Dark Spots Input Coupler Iris Patchy breakdown areas along sides of irises Areas of Discoloration