SPECIAL PROTECTION SCHEME FOR KOODANKULAM

Slides:



Advertisements
Similar presentations
Industry Brainstorm on increasing Export Capacity From Alberta to B.C. January, 2006.
Advertisements

Study Committee Representatives Annual Report December, 2012
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
Operational Experience of system Protection Scheme of Talcher – Kolar HVDC Link.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
HVDC Challenges in Grid Operation
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
POWER GRID CORPORATION OF INDIA LTD
Wide area SPS for Integrating SR with national grid Approach Document prepared by.
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
1 POWER GRID CORPORATION OF INDIA LIMITED BANGALORE.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 139 TH SREB MEETING 19 TH DECEMBER 2005 HYDERABAD GRID EVENTS AND ISSUES.
POWERGRID Welcomes Hon’able Members of “Standing Committee on Energy”
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
POWER GRID CORPORATION OF INDIA LTD.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
Overall National Grid Development: Constraints & Options
SOUTHERN REGION EXPERIENCE
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into Telecom Through an.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
BANGALORE TRANSMISSION PLANNING
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
ENERGY CONSERVATION IN SR - A CASE STUDY
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
September 18, 2007 Regional Disturbance
Summary Rich Bauer, Senior Reliability Engineer
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT
PRESENTATION COVERS Past/Present Power Scenario Issues involved
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
Project WECC-0100 Update Load Modeling Task Force
POWER GRID INTERCONNECTIONS IN CHINA
Yale Runback Local Area Protection Scheme
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
TONBRIDGE POWER GREEN LINE
Special Protection Systems: Operational and Compensation Issues
Project WECC-0100 Update Load Modeling Task Force
Presentation transcript:

SPECIAL PROTECTION SCHEME FOR KOODANKULAM

SPS FOR KOODANKULAM CONTINGENCY LEVEL ABOUT THE SAME AS TALCHER-KOLAR SINGLE UNIT TRIPPING : 1000 MW STATION LOSS : 2000 MW LARGE DIPS IN FREQUENCY LIKELY CONVENTIONAL PROTECTION SCHEMES MIGHT BE INADEQUATE LARGE INCREASE IN NORTH-SOUTH FLOWS LIKELY DUE TO TRIPPING OSCILLATIONS IN THE SYSTEM REDUCED SECURITY TRUNK CORRIDOR LOADING

MULTI-CIRCUIT TOWER ON 220 KV EDAMON-KAYATHAR CORRIDOR TIRUNELVELI KOODANKULAM TRIVANDRUM EDAMON COCHIN THRISSUR MADURAI UDUMALPET ARASUR NLY-EXP NEYVELI BAHOOR PUGALUR TRICHY SALEM HOSUR MYSORE SP-BUDUR MELKOTTAIYUR ALMATHI CHITOOR KOLAR S’HALLI NLMNG HOODY KOODANKULAM TRANSMISSION SYSTEM AS APPROVED IN 17TH STANDING COMMITTEE MEETING HELD AT BANGALORE IN SEP03 KARAIKUDI HASSAN KOZHIKODE SUGGESTED SPS LOAD TRIP POINTS MULTI-CIRCUIT TOWER ON 220 KV EDAMON-KAYATHAR CORRIDOR

SUGGESTED FEATURES SCHEME TO BE MADE PART OF THE PROJECT GRANULARITY OF SIGNAL TO BE GENERATED TO BE DECIDED ONE SIGNAL ON ONE UNIT TRIP SECOND SIGNAL ON BOTH UNITS TRIP SIGNAL WOULD BE TRANSMITTED THROUGH WIDEBAND TO PRE DECIDED LOCATIONS SIGNAL WOULD BE INTERPRETED BU END EQUIPMENT ND ACCORDINGLY TRIP COMMAND WILL BE ISSUED SPINNING RESERVES COULD ALSO FORM PART OF THE SCHEME AUTOMATIC RAMP UP/START UP OF SOME DEDICATED HYDRO STATIONS SAY LIKE KADAMPARAI COULD ALSO FORM PART OF THE SCHEME PROTECTION OF UNITS ON EVACUATION LINE TRIPPING (LIKE RUNBACK OF TALCHER AND KAIGA HOUSE LOADING) COULD BE PUT IN PLACE