Junction Boxes for KM3NeT

Slides:



Advertisements
Similar presentations
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
Advertisements

A.Margiotta, SNOW 2006, Stockholm, 6 May 2006 Status Report of the NEMO Project (NEutrino Mediterranean Observatory) Towards a km 3 Neutrino Telescope.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
Steven S. Thumbeck October 5-8, 2003 NIKHEF, Amsterdam VLV ν T Workshop "Technical Aspects of a Very Large Volume Neutrino Telescope in the Mediterranean.
Nexans experience in deployment of sensors in subsea cable systems
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
Mario MUSUMECI VLV T workshop Mechanics parallel session Critique Of ANTARES MECHANICS, S.CUNEO Analisys of mechanics ideas or NEMO, M.MUSUMECI R. OCCHIPINTI.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
Hanoi, Aug. 6-12, 2006 Pascal Vernin 1 Antares Status report P.Vernin CEA Saclay, Dapnia On behalf of the Antares collaboration P.Vernin
Subsea Connectivity and Distribution Will Mudge - Teledyne ODI October 2009.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
Overview – HOT Site Hawaii Ocean Time-series “HOT” Site –3 Stations: Kahe, Kaena & ALOHA –monthly cruises for 15 years –ALOHA Station 100km N of Oahu.
Isabella Amore Laboratori Nazionali del Sud - INFN, Catania International School of Cosmic Ray Astrophysics 15th Course: "Astrophysics at Ultra-high Energies"
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
ALOHA Cabled Observatory Will use components from the earlier ALOHA- MARS Mooring project at APL-UW Seafloor secondary node Bottom instrument package with.
NEMO-O DE NEMO First results from the NEMO Test Site G. Riccobene, for the NEMO Collaboration The NEMO Collaboration is performing the Phase 1 of the project,
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
VEOC Vertical Electro – Optical Cable and BEOC Breakout Electro – Optical Cable 1 Development Status F19 F18 F1 F20 S2 S1 B KM3NeT General meeting Jelle.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
Status of the LIDO East Sicily Station F.Bruni.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
WPH goals: prepare the specifications for the main components of the deep-sea infrastructure: - Main electro-optical cable (MEOC); - Power transmission.
Earth-Sea Science Junction Boxes
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Update on general technology From DOM electronics to KM3NeT subsea infra structure Interaction with other scientific projects Interaction with industries.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
Deep sea infrastructure: ROV M. Musumeci KM3NET meeting Paris October 2008.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
Electronic department 5/7 July 2010, KM3NeT meeting at Nikhef - Mar van der Hoek et.al. Status and experiences with oil-filled Pressure Balanced backbone.
LIDO Meeting - Catania 13/01/ Giorgio Cacopardo Arrangement of PCB in LIDO E-POd.
Pre-Production Models for KM3NeT
Some developing ideas on Seafloor cabling and copper/fibreoptic split points where this talks builds and borrows from the work of VENUS, MARS, NEPTUNE.
Deep-sea neutrino telescopes
On behalf of Patrick Lamare
MARIGOLD the MEUST deep sea network
Write-up and Definitions for Cost Model
FCC DIGITAL 2ch VIDEO & 1ch AUDIO / 1ch DATA LINK
The Instrumentation Unit (IU) of the Calibration Unit (CU)
Marine and Environmental Agencies
Interdisciplinary Activity ANTARES
Els de Wolf, Nikhef/UvA KM3NeT WP345-meeting 23 February 2009
M.Taiuti on behalf of the NEMO Collaboration
(NEutrino Mediterranean Observatory): Toward a km3 Neutrino Telescope
Data transport architecture over fiber and/or copper
PPM-DOM. SPM DOM LCM SS-part ILxx
VLVnT08 Summary Talk E. Migneco.
The Instrumentation Unit of The KM3NeT Calibration Unit
(Towards) a km3 detector in the Mediterranean Sea
Presentation transcript:

Junction Boxes for KM3NeT R. PAPALEO Junction Boxes for KM3NeT

KM3 Junction Box Main common requirements and constrains Junction Box for the KM3 detector: Mechanics Housing for pressure and corrosion resistance (single vessel, double vessel technology) ROV underwater connector interfaces Frame for deployment and recovery Cable system Breakouts for the management of the DUs Beacon for the LBL of the acoustic position system Power management system Transformer (AC, AC triphase, DC/DC) Slow control electronic system for JB management Optical management system for the data transmission In case of secondary JBs the optical system should work with DWDM technology in order to reduce the number of optical fibers towards the primary JB

Interlink connection ROV underwater connectors Hybrid ROV wet mateable connector Optical and electrical pin in a single connector Only 1 company on the market (ODI) Electrical underwater and optical underwater connectors Electrical connectors: 3 companies on the market (ODI, SEACON, GISMA) Optical connectors 2 companies on the martket (ODI, SEACON)

Underwater Connectors Reliability ODI (2006 report) SEACON

Interlink connections 3 solutions for interlink connection between underwater structures (JBs and DUs) Point to Point Interlink 2 ROV underwater connectors Interlink cable Point to Fix Interlink 1 ROV underwater connectors Fix to Fix Interlink Interlink cable requirements (common for all the DU solution) 2 optical fibers (Data transmission) More than 2 electrical wires (power supply and slow control) Length = f (geometry)

It’s necessary to consider the management of the interlink cable: Interlink connection It’s necessary to consider the management of the interlink cable: During the installation On the maintenance operation (100 DUs means about 30 km of interlink cable) On the up-grade of the telescope (if foreseen)

Point to Point interlink LInterlink Cable= Distance between structures (JBs – DUs) 2 ROV connectors (hybrid solution) 4 ROV connectors (electrical and optical solution) 2/4 ROV sea operations Detection Unit

Point to Fix Interlink Point to Fix Interlink LInterlink Cable= Distance between structures (JBs – DUs) 1 ROV connectors (hybrid solution) 2 ROV connectors (electrical and optical solution) 1/2 ROV sea operations Detection Unit

Fix to Fix Interlink Fix to Fix Interlink LInterlink Cable= depth of Site + % 0 ROV connectors 0 ROV sea operations for underwater connections Detection Unit

KM3NET Junction Box Lesson learned ANTARES has built and deployed a JB in december 2002 Single Vessel Technology (Titanium) Dry connector with the main EOC Failures 3 wet mateable connectors (ODI) out of service JB it’s working since 2002 NEMO (Phase1) has built and deployed a JB in december 2006. Double Vessel Technology ROV underwater connector for connection with the main EOC Electrical failure due to crash on the ship during the sea operations Optical failure due to defective ODI components Recovery of the Junction Box, Maintenance operations and deployment of the Junction (it’s working since April 2008) Similar characteristics ROV Hybrid wet mateable connector interface for the connection of the DUs Power transformer in oil Breakouts for the management of the DUs

Antares Junction Box

NEMO Junction Box

JB – DUs Connection System Antares JB Connector Panel NEMO JB Connector

Proposal for a standard JB for the KM3 detector Life time = > 10 years (following KM3NeT requirements) Project of the pressure vessel for the max operative depth Mechanical frame for the deployment and recovery system ROV underwater connectors for the connection at the DUs and at the main electro optical cable To simplify installation To simplify the maintenance Outuput with ROV underwater connectors To be defined if Hybrid or Electrical + Optical connectors Standard position of the ROV underwater connector in order to define and realize standard ROV connection operations

Proposal for a standard JB for the KM3 detector N.2 optical fibers for the connection of the JB with the DUs Standard Pins Configuration Same position on all the connectors for the Optical fibers and electrical conductors Standard Power Supply System Beacon power supply system and management for the LBL of the detector

on behalf of INGV and TECNOMARE SEAFLOOR OBSERVATORY GENERAL REQUIREMENTS R. Papaleo on behalf of INGV and TECNOMARE

Seafloor observatory: general requirements Communications (ref. SN-1): real-time, bi-directional high-bandwidth communication to the seafloor observatory through two single mode optical fibres (one used, one spare) using 1310 and 1550 nm wavelengths 10/100 Ethernet communication RS-232 standard interfaces to sensors GPS/PPS timing synchronisation at seafloor using media converters to convert electrical communication and timing signals to optical form Power (ref. SN-1) voltage: 500 VAC monophase 50 Hz power required by the observatory ~100 W Umbilical cable: hybrid electro-optical, minimum 2 x 4 mm2 power conductors 2 SM optical fibres INGV

Seafloor observatory: interfaces ROV underwater mateable ODI connector to interface with the umbilical, through a dedicated J-BOX Standard underwater electrical connectors to the scientific payload INGV

GEOSTAR-class observatory scientific payload (ref. SN-1) INGV

Example of a cabled observatory: SN-1