Grid Code Development Forum – 6 September 2017

Slides:



Advertisements
Similar presentations
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
John Zammit-Haber National Grid
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Overview of Balancing & Settlement Code Change Process By Gareth Evans on Behalf of Gazprom Marketing & Trading –Retail.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
European Developments Transmission Workgroup 3 rd May 2012.
CAP169 BSSG 12/03/09. 2 Today  Recap on developments to date  Discuss and agree Terms of Reference for the group  Begin to work through proposal, capturing:
Gemserv1 Release Management Enduring Releases. Release Management  SEC defines Release Management as the process adopted for planning, scheduling and.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
1 Package on food improvement agents Food additives Food enzymes Flavourings Common procedure Developments since earlier consultation.
GC0104 – Demand Connection Code (DCC)
CMP277 ‘Special License Condition 4J’ CMP278 ‘BSIS 2017 Housekeeping’
DSC Change Governance Review Group
EU Implementation Programme
Grid Code What is the Standard Modification Process? Panel
Review Group 291- Ofgem Update
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Transmission Planning Code
Introduction of Code Contingency Guidelines Document
GC0099 Establishing a common approach to interconnector scheduling consistent with the single intraday market coupling processes set out within Regulation.
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Update on European Network Codes
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Harmonisation Working Group
Relevant Electrical Standards
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
TBT Agreement : Key Principles
NPA 450/579 (Area Code) Relief in Quebec
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Approach to Market Cutover - Draft for Discussion
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Code Administration Code of Practice
The Necessary Criteria for a UNC Modification Proposal
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Draft Capacity & Connection Plan
Update on Exit Capacity Substitution and Revision
NPA 403/587/780/825 (Area Code) Relief in Alberta
Joint Office Presentation for Modification 0678
Overall Project RAG Status:
Transmission Planning Code Review
Introduction of Code Contingency Guidelines Document
Review Group 291- Ofgem Update
Proposer: Transporter /
Interruptible to Firm – NTS Supply Point Transition
EU Developments.
Richard Fairholme Transmission Workstream 4th September 2008
Modification 0448 – European Driven Change Process Flow Diagram
CUSC “Alternate” Proposal process
Generic Revenue Driver Methodology
Information Provision for Transitional Exit Capacity
Open Letter - Summary of Responses
DSC ChMC CSS update 12th September 2018
Gemini Code Contingency Review
Implementation Approach Distribution Workgroup – June 2014
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Gas Customer Forum 28 July 2008
Update developments in Core CCR
Update developments in Core CCR
VESI Technical Standards Harmonisation Technical Standards Working Group 19 July 2019(Final)
Introduction We hope that this webinar will provide you with the information you need to understand the DCUSA by covering the following:   What is the.
Presentation transcript:

Grid Code Development Forum – 6 September 2017 Modifications Progress Update Grid Code Development Forum – 6 September 2017

GC0036 and GC0079 Review of Harmonics Assessment Standards and Processes (GC0036) This joint workgroup was established in 2010 to update the ENA administered standard on harmonics, G5/4. This standard is referenced in both codes. As the update to the standard does not directly result in code changes it is proposed to withdraw this code modification The Grid Code Panel have requested a progress paper be submitted to the next Panel meeting for discussion on 20 September 2017. It was also recently agreed that a facilitation modification be raised Frequency Changes during Large Disturbances and their effect on the total system - Phase 2 (GC0079) Phase 2 of the work being carried out by this joint workgroup deals with protection settings for <5MW generators and started in 2013. The driver for the work is from the System Operator, however code changes will only be to the Distribution Code and will only impact D-connected generators. This modification was recently consulted on and closed on 1 September 2017

GC0048, 68 90, and 91 GC0048, GC0090 and GC0091 These modifications will all be formally withdrawn following the acceptance of GC0104 at the next DCRP meeting. The GCRP Technical Secretary will send out a formal email outlining that all of these defects are covered within the new modifications that have been raised (GC0100, GC0101, GC0102 and GC0104) GC0068: Grid Code New and Revised Unit Data & Instructions: This Modification has been approved by the Authority. However, implementation is contingent upon getting an agreed date for EBS go-live

GC0094 and GC0095 GC0094: Relevant Electrical Standards: This Modification was withdrawn by the Proposer The GCRP Technical Secretary notified Industry of this and SSE will be taking over as Proposer for this Modification Following the raising of GC0103 SSE will be withdrawing this modification shortly GC0095 Transmission System Operation Guideline (TSOG): Modification on hold until formal modifications raised, further update to be given to Grid Code Panel in September

GC0096 and GC0097 GC0096: Storage, Definition and Assignment of Technical Requirements for Storage Technologies: This Modification is at Workgroup stage New timetable was submitted to the July GCRP meeting. The timetable was approved 20 Working day Workgroup Consultation Workgroup Report to be submitted to the October Panel meeting GC0097:TERRE: The solution for Grid Code processes is being progressed at Workgroup and a new timetable was approved at the last Panel meeting. The Workgroup Report will be presented to the January 2018 Panel meeting

GC0098 and GC0099 GC0098: Using GB Grid Code data to construct the EU Common Grid Model in accordance with Regulation (EU) 2015/1222 (CACM) and Regulation (EU) 2016/1719 (FCA) This modification was resubmitted to the July Grid Code Panel. The Panel agreed for the modification to proceed to Code Administrator Consultation and to follow the Self-Governance process. The Code Administrator Consultation for this modification closed on the 12 September 2017, find more information on our website GC0099: Establishing a common approach to interconnector scheduling consistent with the single intraday market coupling processes set out within Regulation (EU) 2015/1222 (CACM) GC0099 was raised at the May GCRP. P356 has been raised at the BSC Panel and the two modifications are working as a Joint Workgroup. The Workgroup is currently drafting the Workgroup Consultation

GC0100, GC0101 and GC0102 GC0100: EU Connection Codes GB Implementation – Mod 1 This modification was raised at the May GCRP. This Modification was accepted and the Workgroup need to Report back to the November GCRP meeting. The Workgroup are finalising the Workgroup Consultation. The responses will be discussed at meetings in October GC0101 EU Connection Codes GB Implementation – Mod 2 GC0102 EU Connection Codes GB Implementation – Mod 3 was raised at the June GCRP. This Modification was accepted and the Workgroup need to Report back to the November GCRP meeting. To be discussed today

GC0103 GC0103: Introduction of Harmonised Applicable Electrical Standards Raised as an urgent modification and discussed at Special Grid Code Panel meeting on 27 July 2017 The Authority sent their decision letter on 30 August 2017 outlining their decision that this modification should not be treated as urgent Initial Workgroup meeting to be held on 18 September 2017 If you want to be a Workgroup member please get in touch by emailing grid.code@nationalgrid.com

GC0104 GC0104: EU Connection Codes GB Implementation – Demand Connection Code Raised as modification and discussed at Grid Code Panel meeting in August 2017 Panel accepted the modification and agreed to move it to workgroup Initial Workgroup meeting to be held today