Estate Management Skywalk E – Toilets 16 e-toilets operational. M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E – Toilets 16 e-toilets operational. Estate survey Roads & common area survey completed for Phase 1& 2. Plot Inventory of the Industries 100 % completed. GIS Web Application Software Installed in ELCITA server. Testing work in progress.
Siemens to Infosys Gate-3 Road Road Works – Completed Siemens to Infosys Gate-3 Road Velankani Road
Road Works – Under Progress BHEL to Wipro Gate 5 - Completed Concrete Pavements along Doddanagamangala Village Road
Drain Works – Under Progress Drain Work From Wipro Gate 5 to Wipro Gate 16 Drain Work in front of CDac
Drain/Footpath Works – Under Progress Removing the existing pavers & laying the new Pavers at Salarpuria Info Zone Police Station Drain
Drain Works – Completed Drain Work along ITI property Drain Work in front of Venkatadri
Misc Works – Under Progress Road Widening at Pump House Road Barbed Wire Fencing at Pump House
Misc Works – Completed Construction of Shoulder Drain along Café Corner Road Kerbstone Painting at Siemens Road
Misc Works – Completed MS Railing work below Fly over for E-Toilet MS Railing work – Median Ecity Phase 2
Sustainability Projects RWH works – Under Progress SI.NO DESCRIPTION NO OF PITS STATUS 1 RAIN WATER HATVESTING PIT 43 COMPLETED 2 WORK IN PROGRESS
20 feet deep well Rainwater Harvesting Pit at Various locations
Estate Management Contract Awarded Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road MSME Entry Gate to Exit Gate for 300KLD STP Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along TCS Road
Estate Management Contracts on Anvil Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road Petrol Bunk Road & Golden Tulip Road Providing and laying of Asphalting using 60/70 grade bitumen along KSSIDC Complex Road Landscaping work below fly over (Phase 1 & 2) Providing UGD to connect industries in cluster 2 & 3 to the 300 KLD STP. Construction of 500 KLD STP in KIADB Land, Electronics City Phase 2