ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Progress on the Coupling Coil & Focus Coil Interface Engineering
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
LHCb-VELO evaporator CoBra Calculation and feed through ideas. 18 February 2015 Bart Verlaat 1.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
© 2004 Swagelok Company igc ™ II Modular Surface-mount Design Design.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
TRT active gas leak repairing F. Perez, C. Degeorge, S. Katunin, I. Zhukov, V. Myalkovskiy, S. Konovalov, A. Romaniouk, H. Danielsson, A. Catinaccio, K.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
IBL cooling branch layout and commisioning 6 febryuary 2014 Jan Godlewski, Bart Verlaat, Tomasz Blaszczyk, Eric Richards, Lukasz Zwalinski, Sven Vogt,
Interconnection work for the the QRL cryogenic extensions Ivo Slits - AT/CRI
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Beam Vacuum Interconnect Design Options Ray Veness.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
DEVELOPMENT AND FABRICATION OF EXTENDED SPARK PLUG TYPE LEAK DETECTOR (ESPLD) FOR PFBR M.R. JEYAN INSTRUMENTATION DEVELOPMENT AND SERVICES DIVISION FAST.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
Stave thermal analysis Cooling connections CO2 warm Test
ATLAS Internal ID Service Integration
Feedback on transfer line sizing and flow calculations for UT
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
ATLAS ITk Baby-DEMO update
Filter drilling status
Ti/SS transitions A.Basti INFN-PISA*
new straw end plug: D=10.6 mm straws support frame Levan option
BODY ASSEMBLY PROCESS LASER WELDING VS SPOT WELDING Title Only Slide.
Flexible lines production and planning
Cooling loops for prototype Staves
Weld and Joint Geometry
Update on the IBL vacuum flex transfer lines
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Update on the IBL vacuum flex transfer lines
Pixel CO2 Cooling Status
Status of CO2 Cooling tests at CERN for Pixel phase 1
PANDA The conceptual design of the control Dewar
Single Detector Design
After service guide for changing PCB
UPPSALA UNIVERSITY_GERSEMI PROJECT
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Flexible lines assembly Claudio Bortolin (PH-UAT) IBL Cooling progress meeting 14 January 2014

From S5 to IDEP Side A Side C ≈11m long

Routable connector Design: S. Vogt

Routable connector joint Manifold box side To the Detector Design: S. Vogt Main characteristics: To improve the assembly-disassembly procedure To make easier the installation in Sec. 5 Minimize difficult welding

To weld the 4 mm pipe to the Swagelok gland Step 1 To weld the 4 mm pipe to the Swagelok gland Laser welding Laser welding not good because of the low quality of the material of the Swagelok gland

To weld the 4 mm pipe to the Swagelok gland Step 1 To weld the 4 mm pipe to the Swagelok gland Brazing Machined part SS 316 LN Brazing Orbital welding

Step 2 To weld 4mm pipe extension and to install: MLI, Vacuum T joint and flex hose

1) To weld the 4 mm pipe to the flexible end-piece Step 3 Detector side Butt Welding T-joint Customized end-piece 1) To weld the 4 mm pipe to the flexible end-piece 2) To weld the 4 mm pipe to the T-Joint

Step 4 Detector side Ø 6mm x1 Ø 3mm x0.5 Ø 1.6 mm pipe Butt Welding T-joint CO2 to the detector CO2 from the detector Customized end-piece Ø 1.6 mm pipe Brazed on the 6/3 mm Union 1) To braze the 1.6 mm pipe to the 6/3 mm union 2) To insert the 1.6 mm pipe into the 4 mm pipe 3) To weld the 6/3 mm union to the T-Joint

Step 5 1) To clamp the 1.6 mm pipe to the Swagelok reducer 2) To weld the puller

Flex lines components Vacuum flanges, T joints and sealing O rings Swagelok VCR components Swagelok VCR components