TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.

Slides:



Advertisements
Similar presentations
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Advertisements

P4 Shutter Review May, 2005 P4 – ID Movable Beam Stop and Integral Shutters Presented by K. Beyer and T. Lutes.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
L2000 Technical Training 6. Assemble/Disassemble.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
ATLAS IBL Tool for gluing flex on omega C.Bault/FX Nuiry - IBL Stave Meeting - UniGe August 31st Process description This tool has been designed.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
Tbilisi, 10/07/2014V. Carassiti, P. Lenisa 1. Tbilisi, 10/07/2014V. Carassiti, P. Lenisa2.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
RECENTLY OBSERVED PROBLEMS WITH PRESENT TIDVG 30/07/2014 – “LIU-SPS External Beam Dump” Ivo Leitão.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SPS High Energy LSS5 Thermal contact & cooling aspects
Permanent Joining Nails: come in different shapes and sizes. Nails are much cheaper than screws and quick to put in. You do not need to drill holes in.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
Removing the VTPC from the VERTEX magnets
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
MQXC Nb-Ti 120mm 120T/m 2m models
X PS Internal Dump Core Review François-Xavier Nuiry Giulia Romagnoli
Ladder Assembly All tools and jigs produced Glue dispensing works
NA62 LAV Anti1 REMOVAL & TESTS
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Impact of TIDVG problem on LSS5 dump design schedule
ERMC/RMM activities May 2017
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
Design of Distribution Feedbox at LHC P7
Initial BIS installation
Simple Way to Install Auto Lock Door in Car
Louisiana Tech University
Additional Upstream Coil Shielding
NPS mechanical design 11/13/2018 Jlab meeting
Cryomodule Assembly Plan
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Bunker Wall Design Wall ESS
Single Detector Design
450DA 4”-10”.
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Presentation transcript:

TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME

06/02/2017 J. Humbert, EN-MME

OLD CORE NEW CORE 06/02/2017 J. Humbert, EN-MME

Assemble lower core together. STEP 1 Assemble lower core together. 06/02/2017 J. Humbert, EN-MME

Install cooling tube and clamp tube. STEP 2 Install cooling tube and clamp tube. Weld rings after cooling’s tube installation to be sure that the rings are in contact with the Copper Core. 06/02/2017 J. Humbert, EN-MME

Assemble upper core together. STEP 3 Assemble upper core together. 06/02/2017 J. Humbert, EN-MME

STEP 4 Return the Lower Core and install Graphite & Tungsten block inside. 06/02/2017 J. Humbert, EN-MME

STEP 5 Install Compression Tooling and assemble the upper Core with the lower Core. 06/02/2017 J. Humbert, EN-MME

STEP 6 Install cooling tube and clamp tube. Weld rings after cooling’s tube installation to be sure that the rings are in contact with the Copper Core. Install cooling tube and clamp tube. 06/02/2017 J. Humbert, EN-MME

Install Temperature Sensors in each side (x14 PT100). STEP 7 Install Temperature Sensors in each side (x14 PT100). 06/02/2017 J. Humbert, EN-MME

STEP 8 Pull Tool. 1/ Use lifting slings to slide the Core in the tube. 2/ Pull the Core with the tooling and keep space between Core & End plate to remove it. 3/ Remove pull tool and insert threaded rods instead of. Insert Core in Vacuum Tube with lifting slings and pull tooling. 4/ Fix pull tool on threaded rods. 5/ Pull the Core up to the plate. 6/ Remove the tooling and the threaded rods to install the screws. 06/02/2017 J. Humbert, EN-MME

Downstream Welding parts. STEP 9 Weld the downstream vacuum chamber extremity to close the TIDVG-4 DUMP. Downstream Welding parts. 06/02/2017 J. Humbert, EN-MME

Upstream Welding parts. STEP 10 2 3 4 1 1/ Weld disc on vacuum tube. 2/ Weld bellows on cooling tubes. 3/ Weld input cooling. 4/ Weld output cooling. Upstream Welding parts. 06/02/2017 J. Humbert, EN-MME

Upstream Welding parts. STEP 11 5 6 5/ Weld the box on disc since inside the box. 6/ Weld the vacuum chamber extremity. Upstream Welding parts. 06/02/2017 J. Humbert, EN-MME

STEP 12 Weld cable protection plate for impedance. 06/02/2017 J. Humbert, EN-MME

STEP 13 Fiducialization of the core assembly before putting it in the yoke. 06/02/2017 J. Humbert, EN-MME

STEP 14 Insert Core in Yoke. Install the copper sheets Remove the eyebolts Insert Core in Yoke. Close the yoke Install MKT KF chain clamp to close the cooling circuit. 06/02/2017 J. Humbert, EN-MME

Install TIDVG-4 on supports. STEP 15 Install TIDVG-4 on supports. 06/02/2017 J. Humbert, EN-MME