Y. Muttoni - J.P. Corso TS Workshop Archamps

Slides:



Advertisements
Similar presentations
Layout Drawings of the LHC Collider A. Vergara-Fernández S. Chemli B. Maire Y. Muttoni A. Kournossenko R. Zalyalov TS Workshop May 4 th 2004.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Agenda : CLIC Civil Engineering and Services (CES) WG.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
May 26 th 2005 Development and Management of the Installation Drawings for the LHC Machine Samy Chemli, Jean-Pierre Corso, Yvon Muttoni TS-IC.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Interconnections Cryogenic Extensions and DSL Ivo Slits - AT/MCS
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
LHC machine integration experience PicoSEC-MCNet System Integration Training 26 th May Julie Coupard.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
Civil Engineering for FCC-eh and LHeC
Superconducting Links R2E and Avalilability Workshop
CERN Construction Planning and Scheduling (LHC installation)
SMR 21/09/2017 P. Fessia.
Cryomodule test stand at ESS site
CLIC Handling Engineering Update
Project Center Use Cases Revision 2
VENTILATION OF AD TARGET Kick off meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
Segments Basic Uses: slides minutes
Equipment simplified model SMR UR safety
Technical Scope of Work
EYETS LHC 2016/2017 Works EN/EL/CF
News from Integration WG
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
Project Center Use Cases
Configuration Management and Layout Database ELENA Project
FCC-ee MDI Civil Engineering update
TECHNICAL DESIGN OFFICE
FCC Tunnel and Shaft Cross Sections
A very first look at siting issues
Project Center Use Cases Revision 3
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Project Center Use Cases Revision 3
GIS Portal Racks Project
Technical Scope of Work
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
RDR Baseline Layouts for Interaction Region
LS1 status 17/03/2014.
Installation Binder / IRR – an example
Workshop commissioning Installation Coordination at ESS
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
LHC Machine Advisory Committee Meeting no. 19, June 2006 DFB status
LINAC 3 Meeting ICL machines Injectors
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Y. Muttoni - J.P. Corso TS Workshop Archamps LHC Machine Integration Studies Y. Muttoni TS-IC-IN J.P. Corso TS-IC-IN May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps Contents LHC machine Integration ICL web site Installation non conformity May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps LHC underground caverns – 3D integration The first ICL meeting (LHC Integration Cell) was held during the middle of 1999 with a view to carrying out integration studies of the LHC machine and its services. In 2001 three working groups were created: MIWG Machine integration working group PSIWG Pits and services integration working group PIWG Powering integration working group Today these three groups are under the responsibility of the IN (integration) section which is within the TS-IC group.  May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

LHC underground caverns 26.692 km total length 22.192 km arc 4.5 km long straight section Firstly arc typical cross sections drawings were issued May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps From 2D cross section to 3D half cell Tunnel LEP toward Tunnel LHC May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

LHC underground caverns – 3D integration Example of RR13 cavern 3D integration 80 ancient caverns with LEP installations not dismounted (metallic structures, ventilation, piping, electrical equipments) 40 new caverns May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps No missing equipments Cables trays TS-EL DFBL cryogenic electrical feedbox AT-ACR Cross sections TS-IC Piping TS-CV Transport TS-IC DQS sound insulation AT-MEL Ventilation TS-CV Metallic structure TS-IC Electrical racks TS-EL QRL and service modules AT-ACR Underground cavern TS-CE Machine equipments AB groups AT groups Design office TS-MME No interferences Coherence with adjacent tunnel Integration checked by TS-IC May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps I.C.L. web site The ICL website was created with the objective of centralizing all the information necessary for the integrations, as well as to enable the largest amount of users to have access to those generated by the integrations. http://lhc-div-miwg.web.cern.ch/lhc-div-miwg/Main_Pages/frame%20miwg_icl.htm May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps I.C.L. web site Integration Planning May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps I.C.L. web site Integration Study Snapshot Workview visualisation 3D model Pictures database A. Kosmicki TS-CE Integration approbation Engineering Data Management Service May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Integration and Installation Study phase Installation drawings 3D models Installation Installation verification May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Integration and Installation: Non-conformities (INC) Installation non-conformity? Disrespect of technical specification Lack of space limiting future installations At the beginning of 2004, the IN Section was asked to follow-up these non-conformities. May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps Integration and Installation: Non-conformities (INC) Pre-reception of each service carried out with project engineer and the users. Integration checking: Inside the machine, with ICL site preloaded on laptop. In the design office, the laser scan of already installed equipment (cloud of points supplied by TS-SU) is checked against the theoretical 3D models of future systems. May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps Integration and Installation: Non-conformities (INC) May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps Integration and Installation: Non-conformities (INC) Study phase Installation drawings 3D models Installation Installation verification I.N.C. creation May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps Integration and Installation: Non-conformities (INC) Study phase Installation drawings 3D models Installation Critical new study Critical rework or Installation verification No critical “Use as is” Documentation to update 3D models I.N.C. creation May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps Integration and Installation: Non-conformities (INC) Registration in M.T.F. to follow-up status INC (Manufacturing Tool Follow-up) May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Y. Muttoni - J.P. Corso TS Workshop Archamps Integration and Installation: Non-conformities (INC) May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps

Many thanks for your attention… May 6th, 2004 Y. Muttoni - J.P. Corso TS Workshop Archamps