Building a Sustainable Energy Future

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
Cost of Services Pricing Enables a Net Zero Energy World © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
Electricity Technology in a Carbon-Constrained Future February 2007 Steven Specker President and CEO.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,
IEEE JOINT TASK FORCE ON QUADRENNIAL ENERGY REVIEW Utility and Other Energy Company Business Case Issues Related to Microgrids and Distributed Generation.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
An Overview of Our Regulatory Proposal
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use, reproduction or.
1 Reforming the Energy Vision (REV) “Utility of the Future” Tom Mimnagh Consolidated Edison Co of New York New York Energy Week April 23, 2015.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
67th NECPUC ANNUAL SYMPOSIUM Whiz Bang New Stuff June 17 th, 2014.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
Smart Grid Schneider Electric Javier Orellana
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Energy Innovation Panel Pierre Mullin Siemens Digital Grid June 15 th 2016.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Évora demonstrator site
Smart Grid Paul Bircham Commercial Strategy & Support Director.
Renewable Energy Challenges: System Stability
RENEWABLES AND RELIABILITY
Sustainable Future – Trends and Reality
Integrated Planning of Transmission and Distribution Systems
IG BASED WINDFARMS USING STATCOM
Alternative Transactive Electricity Market Models
Challenges of integrating Variable Renewable Energy Sources (V-RES)
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Integrating Distributed Energy Resource into Grid Operations
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
EE5900: Cyber-Physical Systems
The Transition to a High DER Future
Sahar Rahim MS-Electrical Engineering Supervisor: Dr. Nadeem Javaid
Arun Vedhathiri, Director, Project Delivery, National Grid
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Opportunities in the Changing Energy System
CHILE CALIFORNIA COUNCIL
EU-IPA12/CS02 Development of the Renewable Energy Sector
Characteristics of Regional Power Markets
Reforming the Energy Vision in New York State
New England Electricity Restructuring Roundtable
Defining a More than Smart Distribution Grid
CMPLDWG Composite Model with Distributed Generation Approval
Integrated Distribution Planning Process
2500 R Midtown Sacramento Municipal Utility District
Creating a Clean, Unbreakable Grid
EnergyNet The National Technology Initiative
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
Forging Sustainable Solar (and Storage) Incentives for New England
CMPLDWG Composite Model with Distributed Generation Approval
The logic progression... Northern Ireland has high wind penetration,
Solar Energy Commercialization
LICAP Settlement: Demand Resources
Energy Supply Business Model enabled by the Clean Energy Package
GRID2.0 DC Solar United Neighbors Solar Congress June 1, 2019
The Future Grid and Energy Storage
NASEO-NARUC State Working Group Roundtable and Workshop
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Electricity Distribution and Energy Decarbonisation
Consumers at the heat of energy system?
Presentation transcript:

Building a Sustainable Energy Future Distributed Energy Models & Technology Needs Confidential & Proprietary

Confidential & Proprietary The Problem Distributed Energy Resources are rapidly proliferating the distribution grid AEP is in the process of decommissioning 11 coal plants, representing approximately 6,500 MW . Distributed Energy Resources is growing 3 times faster than centralized generation Among 400 utility stakeholders, 90% of survey respondents believe that the growth of DER will force a major shift in utility business models. Confidential & Proprietary

DER Operational Models ISO/RTO Generator Capacity / Regulation Aggregator/ Retail Utility / Wires Distributed Energy Assets Confidential & Proprietary

DER Operational Models ISO/RTO Generator Capacity / Regulation Aggregator/ Retail Utility / Wires Distributed Energy Assets Confidential & Proprietary

DER Operational Models ISO/RTO Generator Capacity / Regulation Aggregator/ Retail Utility / Wires Capacity / Regulation / Voltage / Reliability Distributed Energy Assets Confidential & Proprietary

Co-optimization of Diverse Assets Complexity Simplicity Non-Constant “Control” and “Storage” Characteristics Storage Real Power Real Energy Reactive Power Ramp In/Out Rates Tariff ...and more Optimizing & Coordinating Diverse Assets Inverters/Storage Lighting Dynamic Operational Constraints & Control Operations CHP Network Response Loads (e.g. pump) Confidential & Proprietary

Multi-Layer Control / Optimization Optimization for Power Response and Market Conditions Local Resource Optimization Network Level Optimization Regional Level Optimization Grid Level Optimization Grid Level Optimization for Grid/Service level objectives (i.e. Grid Regulation, Capacity) Collection of Networks Optimizing for the Network Scale objectives (i.e. Substation or Region) 2 Second Action Collection of Local Resources into a Network Level Optimization (i.e. Campus, Feeder etc.) Optimization for Power Response and Local Resource Conditions The different levels of optimization can be prioritized in different ways. For example, local optimization can be higher priority than network optimization, or the priorities can be the other way around. Local Constraint Based Optimization of the Objective based on Local Conditions and Operations (i.e. DER, Load, System)

Application: Constraint Based Solar Firming & DR The Problem: Highly Variable Solar Increased Capacity Reserves Higher Reliability Concerns Constrained Renewable Deployment The Solution: Create a Flexible Network of Resources Individual Assets In the Network The Symphony Platform is Co-Optimizing between the local constraints of the customer assets to firm the Solar Output for reliability & respond to a Demand Response Event. Simultaneous Optimization. Result after Enbala Control of a network of assets Effect of Solar on Substation

Application: Constraint Based Solar Firming & DR Utility Benefits: Improved Capacity Reduced System Losses More Renewable Capacity Customer Benefits: Improved reliability Improved asset utilization Greater energy insights ESP Benefits: Greater Renewable Penetration Improved Controllability Improved CapEx recovery The Symphony Platform is Co-Optimizing between the local constraints of the customer assets to firm the Solar Output for reliability & respond to a Demand Response Event. Simultaneous Optimization. Result after Enbala Control of a network of assets Effect of Solar on Substation

Confidential & Proprietary Arthur (Bud) Vos President & CEO Enbala Power Networks bvos@enbala.com Confidential & Proprietary