LS2 LHC forward experiments

Slides:



Advertisements
Similar presentations
LHCf: a LHC Detector for Astroparticle Physics LHCf: a LHC Detector for Astroparticle Physics Lorenzo Bonechi on behalf of the LHCf Collaboration * University.
Advertisements

Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Forward physics pertinent ECRs Mike Lamont, Samy Chemli.
1 Tehniline ülevaade uusimast füüsikast CERN’is Endel Lippmaa 20. Detsember 2006, TTÜ.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
SU ACTIVITIES PENDANT LS1 CMS ALICE. Antje Behrens | SU pendant LS1 day| | EDMS | page 2 CMS Quoi (quelles activités prévues pendant.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
AFP Introduction September 10th 2014 M. Bruschi, INFN Bologna (Italy) 1.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
Convergence in Proton Reconstruction Algorithm and final reference tests of Roman pots before installation in LHC Ayah Massoud Penn State University Supervisor:
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
The integration of 420 m detectors into the LHC
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
ATLAS Forward Proton Detectors ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS Collaboration Physics summary: Physics withSingle and Double.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
Kreuth, 2015/10/5-9 Csörgő, T. Evidence for non-exponential pp d/dt at low t and √s = 8 TeV by TOTEM T. Csörgő for the TOTEM Collaboration.
Status of the Experiment RRB - TOTEM 16 April 2013 S.Giani - CERN on behalf of the TOTEM Collaboration CERN-RRB
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
Mike Lamont An attempt at synthesis Acknowledgements all round
First collisions in LHC
The timing upgrade project of the TOTEM Roman Pot detectors
Operating IP8 at high luminosity in the HL-LHC era
Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25FEB2016.
LBNF CAD models, Drawings and Component list
Equipment simplified model SMR UR safety
EYETS David Hay EN-OSS.
Introduction Status before the 2009 run Results from the 2009 run
First data from TOTEM experiment at LHC
Diffraction and Forward Physics in ATLAS: results and perspectives
AD consolidation activities in LS2
News and brief overview of Beamline plans for the next few months
Long Shutdown for the LHC: Vacuum Beam Pipes
P.Fassnacht on behalf of ATLAS/ALFA
Recent Results from TOTEM
Accelerator and Experiment Interface Session: LS2, LS3
Heating of ALFA detectors
Status of CO2 Cooling tests at CERN for Pixel phase 1
TOTEM experiment at the LHC
Equipment of experiments directly interfering with the beam operation
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
LHC progress report Week
Status of CMS-PPS timing detectors
The Measurement of Forward Particle Production in LHC
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
HI2011 Commissioning Status
Results, Status and Perspectives for 2011
Presentation transcript:

LS2 LHC forward experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA) More details in backup for reference

Largest RP system ever operated in a collider

TOTEM/CT-PPS in LS2 No major upgrades planned for LS2 Data taking in Run 3 with existing detectors During LS2 we need a revision of RP movement components and possibly exchange of pots to continue the project safely after LS2. Might plan to equip as well the RP 220 near horizontals with the RF shields and circular ferrites. For the exchange of Roman Pots ask for the local removal of the beam pipe.

ALFA

ALFA – LS2 The long term plan for ALFA is to finish the physics program, total cross section and luminosity measurement, in Run 2. No plans for LS2 But note Possible AFP refurbishment plan Still have the 14 TeV total cross section on their list…

AFP Plans for LS2 EYETS 2016-2017 Current Status: New Stations UHV qualified. New Stations installed in 6L1! Old detectors re-surveyed and extracted ! 2016 2017  LS2 W,Z,γ SD DPEjj CEPjj γγ→ W,Z,γ EYETS 2016-2017 XRP Far –218m XRP Near –206m PatchPanel –212m 19JAN2017 AFP @ LS2

AFP Plans for LS2 Foreseen: Extract and refurbish detectors (4 days early in LS2 + 4 days late in LS2): new Time-of-Flight detectors! Install Single-Mode fiber bundles for clock distribution upgrade (1-2 wk) possibly routing through survey galleries? Possibly: Install BPM after NEAR Stations? (3 wks) currently no BPM after 205 m stations need to await 2017 data to show a need for another BPM would require 6L1 and 6R1 exterior pipe modifications, bakeout, surveys, … Refurbishment of ALFA stations: rad-hard detectors/electronics? (4 wks) Good for concurrent data taking & alignment (in special runs) would allow ALFA shielding to be removed … would require significant work and manpower far from sure: to be decided within ALFA, AFP, and ATLAS! 19JAN2017 AFP @ LS2

Conclusions TOTEM and CT-PPS ALFA AFP Revision and possible exchange of pots ALFA Aim to finish data taking in Run 2 AFP Limited activity in LS2 Might refurbish ALFA Discussions have started on possibilities of Forward Proton Physics at the HL-LHC

BACKUP Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA) BACKUP

TOTEM/CT-PPS in LS2 During the 2016 insertions we have validated the RPs of CT-PPS for the design luminosity of LHC. If the RP insertions continue in future up to LS2 on a regular base (as in 2016) during LS2 we need a revision of RP movement components and possibly exchange of pots to continue the project safely after LS2. Depending on the physics results and the optic settings of the machine in future, we might plan to equip as well the RP 220 near horizontals with the RF shields and circular ferrites (low mass reach). The exchange of detector packages happens on a regular basis during technical stops and during EYETS. Special attention need the cooling components (capillaries) of the detector packages as they might suffer from material fatigue.

TOTEM: LS2 Originally planned to have two cylindrical RPs per side and it could be possible, that we use LS2 to integrate such additional RP per side in the already existing mechanical frame. Furthermore, during LS1 we have not succeeded to create the two small excavations (radiation limiter) in the tunnel floor to locate radiation sensitive electronic timing components close to the detector. This might still be required, if the radiation level would limit the operation of the FPGA or other electronics This activity (if finally approved) during LS2 might require for safety reason the local removal of the beam pipe. 

TOTEM: Run 3 The operation of the present TOTEM Roman Pots at high beta optics/special runs is officially foreseen until the max. possible energy of LHC has been reached, allowing to complete the approved scientific mission of TOTEM. Any future operation of the Roman Pots within the CT-PPS project at standard LHC optics will depend on the insertion limitations we find during the intensity ramps. The performance of the detector inserts in the Roman Pots under the specific radiation conditions (tracking and timing) will then determine the physics reach.

ALFA – LS2 The long term plan for ALFA is to finish the physics program, total cross section and luminosity measurement, in Run 2. No plans for LS2 Still have the 14 TeV total cross section on our list. If ALFA continues in Run 3 there are ideas about replacing the fiber detectors by Silicon pixel - this still at the speculative level Note possible refurbishment of ALFA RPs by AFP…