University of California - Berkeley

Slides:



Advertisements
Similar presentations
Aims e-Business Applications An Overview of Aims Inventory and Procurement Management Design By: Shaikh Abdul Aziz.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
CENTRAL CONTRACTOR REGISTRATION (CAGE CODES) DFARS Case 2003-D040 DFARS Parts 204, 212, 213 and 252 are amended to remove policy on Central Contractor.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
Defense and Aerospace Screening Flows Joe Fabula
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
MethodGXP The Solution for the Confusion.
Introduction to Software Quality Assurance (SQA)
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
NASA EEE Parts Challenges for Spaceflight Electronics National Aeronautics and Space Administration Quality Leadership Forum March 21, 2013.
From Research Prototype to Production
QA Requirements for DOE Accelerator Safety System Software K. Mahoney Group Leader, Safety Systems TJNAF Presented at the 2008 DOE Accelerator Safety Workshop.
Mission Success Starts With Safety 07/19/2001 (1) NASA EEE Parts Assurance Group (NEPAG) Quality Leadership Forum July 19, 2001 Michael J. Sampson NEPAG.
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Process Control during Wafer Design and Production.
Mission Success Starts With Safety Michael J. Sampson, Program Manager, Workmanship and EEE Parts Assurance NASA GSFC, Greenbelt, MD Code 306, Systems.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
Quality Assurance and Risk Management Services, Inc. 
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Rick Roelecke Director, Corporate Quality Management July 26 th, 2016 L-3 Communications DoD Policy Implementation.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
EFW DFB Systems Assurance
EFW DFB Systems Assurance
MRP: Material Resource Planning
THEMIS Mission Assurance
ISUAL Product Assurance
HMI Mission Assurance Manager
Peer Review Agenda (Suggested).
The Production Process
BRIAN KLATT MISSION ASSURANCE MANAGER
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
R8 RAD-HARD MOSFETS The two new R8 radiation hardened (RAD-Hard) power MOSFETs are optimized for space grade point-of-load (POL) voltage regulator, linear.
Single-Phase Qualification of Microcircuits in ESCC 9000
DOE Review of the LCLS Project October 2006
Presentation transcript:

University of California - Berkeley Parts Requirements Mission PDR Jorg Fischer University of California - Berkeley

Overview Parts & Materials Overview Requirements EEE Parts ID List Procurement Parts Status

Requirements & Specs GSFC 311-INST-001 Instructions for EEE Parts Selection, Screening, Qualification Minimum EEE Parts Criteria for Level 3 = Moderate level of risk, as permitted by cost constrains Parts in compliance with 311-INST-001, Level 3 (Grade 3) requirements and Standard parts Use of GSFC PPL 21 (GSFC Preferred Parts List), design permitting Non-standard EEE parts will require at a minimum: Plastic Encapsulated Microcircuits (PEM) Selection, Screening, and Qualification (NASA/TP-2003-212244, PEM-INST-001) PIND per MIL-STD-750 and MIL-STD883, required for cavity devises Impose on manufacture, if possible When needed, have DESC approved test facility perform testing

Requirements & Specs (continued) Customer Source Inspection DPA performed for complex or known problem devices Preconditioning, HAST, and CSAM Testing Radiation Testing Total Ionizing Dose Requirement is 66Krads (si) - Review existing test data from GSFC, JPL, and manufacturer - Review NASA “where used” historical data Parts can be used, if data and or orbit requirements equal or exceed THEMIS requirements Cobalt 60, TID testing will be performed as needed SEE use existing data or historical use (similarity) - Whenever possible designers will use latchup immune devices

Requirements & Specs (continued) Flowdown Performance Assurance Implementation Plan requirements on subcontractors Parts Control Board (PCB) PCB members are: Themis QA, Design Engineer, and Themis Project manager, or representative PCB shall review EEE part for: Testing, Screening, and Qualification Failures Alerts (e.g., GIDEP) Review Non-Standard Parts Requirements

EEE Parts ID List UCB/SSL QA will maintain an EEE Parts Identification List (PIL) The PIL will contain: Manufacturer’s generic part number Military Part Number or SCD number Manufacturer(s) Where used (unique assembly) / Quantity Quantity used Quantity ordered Lot/Date Code Radiation Status (TID/SEL) Alert Status Comments

Procurement Parts will be procured to an approved Parts List. Schedule permitting, will procure common buy. Procurement of devices will be based upon design engineer’s confidence-of-use factor of 70%. Unique, high-dollar items will be based on a 90%-100% confidence level. Minimum Attrition / Spares factor of 20%-30% will be applied to flight procurement quantities. ETU and Flight unit Procurement will run concurrently

Parts Status Active Parts Status: 11/05/03 115 Parts 47 Parts In Stock 24 Parts On Order 44 Parts In Progress - 34 RFQ stage - 10 Pending Engineering Input TID test 18 parts 12 parts are at ICS Inc. for the TID test 2 parts On Order 4 Parts RFQ stage