Recent results of Vertical-EP at KEK-Marui

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
| PAGE 1 LCWS14 October 7 th 2014 CEA EXPERTISE WITH VERTICAL ELECTROPOLISHING (VEP) F. Eozénou.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Recent Surface Studies in KEK-STF
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.
CEA DSM Irfu May 28th A RD 05: SURFACE PREPARATION STUDIES FOR SUPERCONDUCTIVE CAVITIES F. Eozénou, T. Saeki - F. Eozenou / T. Saeki - A_RD_05.
EP parameter comparison between JLab and KEK 28 Mar ILCW2010 at Beijing, GDE/Main Linac session T. Saeki.
Accelerator R&D status in cooperation with CERN and KEK 1.BSM, BHM (T. Mitsuhashi) 2. Crab Cavity (Y. Morita) 3. X-band Acc. Structure (T. Higo) 10 th.
New HOM coupler design Demountable Damped Cavity (DDC) Sokendai, The graduated university for advanced studies. KEK, LL / Ichiro Cavity Group October 21,
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
TTC meeting 6 Dec. 2011, BeijingCornell SRF group Fumio Furuta, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Recent.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Field emission issue and strategy to improve H. Hayano.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
Sample tests for stain problem at KEK LCWA2009 at Albuquerque 01 Oct T. Saeki 1.
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
1.3GHz Input Coupler for ILC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Curtis Crawford, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Optimization of f 9-cell Vertical Electro Polishing.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ILC-HiGrade annual meeting - 12 October 2011 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Quality control of EP in KEK-STF TTC meeting April 21 st 2010 FNAL Motoaki SAWABE.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CEA DSM Irfu 11/06/2016- F. Eozénou - TTC Meeting 2012 JLab WG21 Experience with Vertical Electro-Polishing at CEA Saclay Comparison with Horizontal EP.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
Summary of STF-EP facility at KEK.
ATF status and plans for 2017
Vertical Electro-Polishing activities at CEA Saclay
BCP Analysis Update Thomas Jones 22/7/16.
TDR guideline discussion on Cavity Integration
Motivation Vertical Electro-Polishing for high gradient cavity R&D.
Status and plans for the 3.9 GHz section of XFEL
Electropolishing of Dressed ILC 9-cell Cavity
Condition of electron beam welding toward a high gradient application
ILC-SCRF Test Facilities considerations
Inspection of STF Baseline cavity #5 and #6
Vertical Electropolishing at Marui & KEK
Activities of Cavity Fabrication Facility at KEK
Some History of Electropolishing of Niobium 1970 – 1990
Effort Torwards Improving Large Scale Production for SC Cavities
A. Yamamoto, S. Michizono, and B. List
A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES
High Gradient Cavities
Quality control study with single-cell cavities
WG3: Main Linac SCRF(cavity,cryomodule)
TTC topical-meeting on CW SRF 2013
ON THE HIGH GRADIENT Nb CAVITIES
FOR SUPERCONDUCTIVE CAVITIES
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Marui Galvanizing Co ., Ltd. Corporate History
Cavity Degradation Experience at S1-Global
Presentation transcript:

Recent results of Vertical-EP at KEK-Marui 2017.10.24 LCWS2017 SRF-WG H. Hayano-KEK Recent results of Vertical-EP at KEK-Marui Hitoshi Hayano (KEK) for Keisuke Nii, Vijay Chouhan, Yoshiaki Ida, Takanori Yamaguchi, Kiyotaka Ishimi, Atsushi Toose  (Marui Galvanizing Co., Ltd.) Hitoshi Hayano, Shigeki Kato, Hideaki Monjushiro, Takayuki Saeki, Motoaki Sawabe, (High Energy Accelerator Research Organization (KEK)) Hiroki Oikawa (Utsunomiya University) Hayato Ito (The Graduate University for Advanced Studies: Sokendai) G. Mitoya, T. Akabori, K. Miyano, F. Takahashi, Y. Anetai, M. Fijisawa, S. Murakami, K. Suzuki, K. Kon, K. Omori ( VEP Iwate collaboration ) Fumio Furuta (Cornell), Fabien Eozenou (Saclay)

US-Japan Cost-down : A-4. Cavity chemical treatment The change of the SC-cavity chemical treatment, from horizontal EP and sulfuric acid + HF (TDR) to vertical EP (VEP) + non-HF solution + bipolar EP, will be effective to ILC cost down. VEP with wing-cathode Bipolar EP using non-HF solution ILC EP cost-down The development of vertical EP (VEP) is the first step.

Vertical EP (VEP) for Single-Cell Cavity

Wing Cathode (Ninja-cathode) Development partial metal wing during insertion during EP Al small electrode Al small electrode partial metal wing metal wing insulator wing Flat removal was attained

Roughness Monitoring by coupon cavity partial metal wing Viewport insulator wing metal wing smooth surface finish was attained partial metal wing metal wing Viewports enable us to look H2 bubbles generation and flow insulator wing

Single-cell VEP at Marui motor for cathode rotation water spray for cavity outside cooling partial metal wing insulator wing 13-15V, 30mA/cm2, 28degree, 50rpm, 5L/min

Recent 1-cell VEP at Marui towards vertical test at KEK 07 September, 2017 * Vertical test was suspended by the accident, AC-power-down during cool-down, Vac. pressure was increased, then severe Q-desease happened on 21 Sep. 2017. The next vertical test is scheduled in November.

Recent Single-cell VEP at Marui Side View Top View Ninja-5 single-cell cavity with support-jig Automated EP acid control valves ( VEP Iwate collaboration) VEP mount

Recent Single-cell VEP at Marui Cavity-top acid reservoir Cavity-bottom acid reservoir cost effective ALL PVC-made system ( VEP Iwate collaboration ) EP acid reservoir tank has 5-filtered-room for H2 bubble erasing: it was effective. EP acid reservoir tank with water-chiller

Recent Single-cell VEP at Marui before VEP after VEP shiny finish surface was attained!!

Recent Single-cell VEP at Marui Average removal 39μm Flat removal was attained!!

Vertical EP (VEP) for 9-Cell Cavity

Recent Wing Cathode (Ninja-cathode) for 9-cell Insulating wings (3 wings per cell) Ninja-5 I-V curves of the coupons Side View Top Cell Cathode housing covered with meshed sheet (catch-up H2 bubbles) Top Iris Equator Bottom Iris Top View Enhanced cathode surface area (additional Al electrodes) Center Cell Top Iris Equator Bottom Iris Parameters Condition Acid (H2SO4:HF) 9:1 Acid flow direction Bottom to top Acid flow rate 5-7 L/min Cathode rotation speed 50 rpm Cathode Ninja-5 Voltage ~13 V Current Density 18 mA/cm2 Cavity temperature 15 °C VEP condition (Follow the 1-cell VEP best condition) Bottom Cell Top Iris Equator Bottom Iris 13V

Coupon holders and view ports Roughness Monitoring by 9-cell coupon cavity The world’s first 9-cell coupon cavity has been fabricated. 9-cell coupon cavity Coupon holders and view ports (Near iris position) Coupon holder (Equator position) In order to optimize VEP parameters, a 9-cell coupon cavity was fabricated. ・ Nb coupons are set on equator positions of 1st, 5th and 9th cell. ・ View ports with Nb coupon are set near iris of 1st, 5th and 9th cell. ・ EP current can be measured for individual coupon. ・ Coupons are removed for surface analysis.

Roughness Monitoring by 9-cell coupon cavity Roughness (Rz) Microscope images of the coupons Almost smooth surface were attained, except one location.

EP removal thickness of 9-cell coupon cavity Top View 0° 180° Average removal: 35 µm Asymmetry between top and bottom (60µm - 30µm) Still Non-Flat removal for 9-cell cavity Cavity was connected to Automated EP acid control valves

Recent 9-cell VEP at Marui towards vertical test at KEK 05 October, 2017 * Vertical test was suspended by the accident, Vaccum leak happened at RF pickup feedthrough silver-brazing during 120C baking, on 15 Oct. 2017.

Recent 9-cell VEP at Marui VEP Conditions cavity was water-spray cooled Cathode: Ninja cathode v5 (contains 3 wings in each cell) Cathode rotation: 20 rpm Acid flow rate: ~5 L/min Voltage: ~14-16 V Cooling: Acid cooling in acid reservoir using Chiller-1 (5 kW) Spray of water cooled by chiller-2 (1.2 kW) Target cavity temperature ~ 15 °C Target current: 160 A Target removal thickness: 50 µm Cavity-top acid reservoir was filled with bubbles EP acid reservoir tank has 5-filtered-room for H2 bubble erasing, but still bubbles were remained in this 9-cell VEP.

Surface finish From the Top (Before VEP) From the Top (After VEP) Input coupler Flange Bubbles might gathered at the flange of input coupler and made the surface rougher. HOM cup was also rough surface.

Vertical Tests of VEP 1-Cell Cavities at Cornell and Saclay

Collaborative Study with Cornell and Saclay Collaborator : Fumio Furuta (Cornell), Fabien Eozenou (Saclay) ( Cornell ) ( Saclay )

Cathode comparison with Cornell VEP Cornell-KEK Feb. 2016 VEP at Cornell using Marui-Ninja-cathode During EP insertion Ninja-3 Concept of newly developed Ninja-cathode (retractable wing for H2 bubbles flow control and acid flow control) KEK-Marui-Cornell development 1-cell Cavity VEP With Ninja-cathode at Cornell Right Vertical Test shows, KEK-VEP (Ninja cathode) has similar performance with Cornell-VEP (rod cathode), reached to 35MV/m.

Summary of recent VEP development VEP setup and unique Ninja cathodes were developed for surface treatment of Nb cavities. VEP parameters and design of the Ninja cathode were optimized for single cell cavity. Smooth surface and symmetric removal of Nb along cavity length were obtained with the Ninja cathode. The Ninja cathodes and optimized VEP parameters were applied to two single-cell cavities which showed good performance in vertical tests performed at Cornell University and CEA-Saclay. The world’s first 9-cell coupon cavity has been fabricated. VEP parameters are being optimized using the cavity. Vertical test of 9-cell cavity with VEP & Ninja-cathode was suspended by the feedthrough leak. The reason of leak is now under investigation.

End of slide