Real Time Flood Event Modeling Program

Slides:



Advertisements
Similar presentations
Analysis of Radar-Rain Rate Relations During the Southeast Texas Flood Event of 18 April 2009 Steve Vasiloff, NOAA/National Severe Storms Laboratory Jeffrey.
Advertisements

Harris County Flood Control District Model and Map Maintenance Program
Questions concerning the Halloween Flood in Onion Creek Presentation by David R. Maidment Center for Research in Water Resources University of Texas at.
Clear Lake City Water Authority Storm Water Detention In Horsepen Bayou Watershed September 2009.
RESILIENT CITY - PASADENA, TEXAS
Hurricane Isaac X X X ◘ Isaac began as a tropical wave on August 16 th off the coast of Africa & was classified as a tropical storm on August 21 st ◘
The Risk is Real… Be PREPARED! Robert Billings, PE, PH, CFM Flood Mitigation Project Manager Charlotte-Mecklenburg Storm Water Services May 18, 2011 Briar.
Reading: Applied Hydrology Sections 14-5, 14-6
Analysis of the Rainfall of Tropical Storm Allison Creating an Excel Model Creating an Excel Model.
Jeff Dobur, NWS Peachtree City, GA Michael Moneypenny, NWS Raleigh, NC Rainfall and River Forecasts The Processes and Products.
Tradeoffs of Ecosystem Services from Wetlands in the Houston Region L. James Lester 1, Gregory R. Biddinger 1 and Lisa A. Gonzalez 1 1 HARC, The Woodlands,
Photos © reproduced with permission from the Harris County Flood Control.
Tropical Storm Hermine & it’s Impact on Texas Steven Vargas, PE.
HEC & GIS Modeling of the Brushy Creek Watershed Presented by Cassandra Fagan 25, November 2014
RIO VERDE AREA DRAINAGE MASTER PLAN
Flooding & Drainage Committee May 16,  Participate in the National Flood Insurance Program (NFIP)  Participate in the Community Rating System.
Tropical Storm Allison & its impact on Harris County
Basic Hydrology & Hydraulics: DES 601
DICKINSON BAYOU WATERSHED GALVESTON COUNTY, TEXAS Jason Christian, P.E. National Flood Workshop October 24-26, 2010 – Houston, Texas PROBABILISTIC FLOODPLAIN.
Predicting and Preparing for Natural Disasters Margaret A. Davidson Director NOAA Coastal Services Center June 7, 2005.
Presentation to: Using GIS for Business Continuity Patrick Alesi.
Arkansas Natural Resource Commission 2015 Accreditation Workshop.
Pre Conference Seminars 1 Arc Hydro and the Regional Watershed Modeling System in Texas William Burmeister, P.E. PBS&J, San Antonio, Texas.
Welcome back! Please choose a seat where you can learn best!
Setback Levees: Hydraulic, Ecologic and Economic Benefits Tony Melone, PhD, PE, CFM 2011 ASFPM National Conference.
Modernization of the Harris County Flood Control District Flood Warning System Telemetry Network National Flood Warning Workshop Houston, Texas February,
Houston ARCH 5502 Fall 2010 Professor Torres-Macdonald Jonathan Cordingley.
New Fire Weather System Bernard Miville Manager of Operational Forecasting.
Development of a Geographic Framework for an Integrated Flood Modeling System Oscar Robayo Tim Whiteaker August 10, 2004 University of Texas at Austin.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
Map-Based Flood Hydrology and Hydraulics David R. Maidment Jan 10, 1998.
David R. Maidment New Project Opportunities 1.FEMA floodplain mapping information – 1 research assistant, funding initially for this year but will likely.
Clear Lake City Water Authority Presentation to Space Center Rotary July 14, 2008.
Introduction to Urban Hydrology
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Peter Gabrielsen Chief, Hydrologic Services Division Eastern Region NOAA’s.
Storm Water Management Plan Lawrence County, PA Katelyn Zollos CE 549.
Introduction to GIS David R. Maidment
Map-Based Flood Hydrology and Hydraulics
Evaluating Harris County’s Road Network
Flood Information and Notification System (FINS)
Silver Jackets Orientation
Using GIS to Plan for and Mitigate Flooding on Tribal Lands
Flooding adapted from a presentation by Prof. David R. Maidment
The Woodlands - a Totally Planned Community
Map-Based Hydrology and Hydraulics
Meetings 05/22/2017 Research Interests in Flooding
Hydraulic Routing in Rivers
Guidance on Homework Report Tc and R for each watershed
Hydrologic Simulation Models
The Tank Hollow Fire and the Increase of Flood Potential for Spanish Fork Jaxon White.
Introduction to Urban Hydrology
Some Project Ideas Literature review of particular subjects – what is new since “Applied Hydrology” was originally published? What are the key papers in.
CEVE 412/512 Dr. Phil Bedient Jan 2016
Flood Monitoring Tools 2011 OFMA Annual Conference
The Woodlands - a Totally Planned Community
City of Kingfisher: Using Historic Flooding to Quantify Damages
Reported Flood Inundation due to Hurricane Harvey in Houston, TX
Contrasting Detailed and Approximate Floodplain Studies
Regional Hydraulic Model for the City of Austin
UH-Downtown White Oak Buffalo.
Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS
Houston Service Analysis: 04/18/2016 Floods
Hydrologic Information System
CE 384N GIS in water resources Flooding in Houston during Hurricane Harvey Yun Liu (Lorraine) 11/27/2018.
FLOODPLAIN MANAGEMENT BEFORE AND AFTER A CATASTROPHIC FLOOD EVENT
CE 384N GIS in water resources Flooding in Houston during Hurricane Harvey Yun Liu (Lorraine) 11/27/2018.
Flooding Surrounding the Addicks Reservoir during Hurricane Harvey
West Houston Association
Aldine Westfield Stormwater Harris County Flood Control District
One Company. Unlimited Potential.
Presentation transcript:

Real Time Flood Event Modeling Program Ataul Hannan, P.E., CFM Harris County Flood Control District National Flood Workshop Houston, TX, October 24-26, 2010

Harris County

Elevation Contour

Our Soaked History

Tropical Storm Allison

Floodplain Map

Purpose To create a planning and information resource for: Better understanding the ability of current models to reflect observed flooding conditions Providing real-time and post-event evaluations of the effectiveness of county flood management facilities Supporting existing Flood ALERT efforts staffed by HCFCD personnel

Objectives Web-based intranet tool Utilize existing HEC-HMS and HEC-RAS models developed for Harris County Link programs together to ingest rainfall and produce a real-time flood inundation map

Pilot Study Buffalo Bayou and White Oak Bayou Watersheds (unsteady flow network)

FEMP Timing Aspects Rainfall Data = 15 minutes (continuous feed) External Processing Natural Link Link 1 Link 2 Timing Aspects Rainfall Data = 15 minutes (continuous feed) Computation Time = 11 to 14 minutes Antecedant Rainfall = 10 days Link 3

Parent Program

Web Tool

Web Tool

Web Tool

Web Tool

Web Tool

Web Tool

Test

Test

Test

Test

Test

Reduce the risk and rediscover the beauty QUESTIONS???? Reduce the risk and rediscover the beauty