Sharing of Inter-State Transmission Losses 8/2/2018
Introduction Losses are physical phenomenon while transportation of electric energy from generation to load Fixed losses core or iron losses in transformers, losses in shunt devices such as shunt reactors, shunt capacitors etc SVC, part of losses in HVDC terminals and other FACTS devices Generally depend on system voltage and thus constant. Variable losses (I2R) Copper losses in transformers, transmission lines Depend on load current Load current varies with quantum of load and thus variable Resistance of lines and thus on line lengths In transmission system variable losses >> fixed losses Thus generally losses proportional to load and distance of transportation 8/2/2018
Introduction Development of ISTS system Treatment of losses 1960-70: State systems connected with few inter-state lines, 1970-80: Development of Central Generators and their associated transmission system. 1991: POWER GRID came in existence and transfer of associated system to new company Post 2k/2003: ISTS licensees Treatment of losses Individual line losses Associated Transmission losses with individual generator Pooled losses 8/2/2018
Introduction Sharing of Transmission losses 1960-70: Based on drawal on individual lines on some mutual/collective understanding 1970-80: based on drawal or actual energy allocation from concerned generator. 1990: Regional Pooled losses with some exceptions in proportion to the energy drawal. Post ABT: Estimated Regional Pooled losses in proportions to schedules from Grid. In all above drawee utilities used to bear the losses Inter-regional Transactions: Regional (whether pooled or otherwise) losses and inter-regional link losses. Inter-regional link losses merged with regional pool Thus regional postage stamp for losses. 8/2/2018
Introduction Other changes Sharing of losses for some state networks In schedules….. SR In actuals… NR Operation of ‘POWER EXCHANGES’ in 2008 Based on point of connection (connection to which region) Injector /drawee both have to bear losses Wheeling region losses only if studies prove it. 8/2/2018
New Regulation for sharing of losses CERC Regulation on sharing of ISTS charges and losses Regulation notified in in June 2010 NLDC has prepared procedure in compliance with Regulation 6(1) Formation of Implementation committee and various meetings of Implementation committee Validation Committee Final approval of the commission for implementation Implemented w.e.f 1st July 2011 8/2/2018
International Practices Prevalent Losses settled Paid In kind In Money Settled For each balancing period on daily, weekly or yearly Paid by Only drawee Both injector and drawee In some adhoc ratio 50:50 or 45:55 Loss allocation factors may have two component Fixed and variable(based on location, season, time of the day) Paid based on after the fact on figures declared upfront 8/2/2018
Issues in Recovery of Transmission Losses System Operation Requirement Losses are physical in nature and thus to be supplied in real time Loss compensation shall be as actual losses in real time so that proper load generation balance is maintained. Market Operation Requirement Losses to be known in advance (as long as possible) to plan for future scenario to make bid/price strategy Calculation of individual payout is easy. Whole process is transparent Allocation is fair Overall requirement Administration of losses is easy 8/2/2018
Loss sharing Methods…explained in literature Loss allocation is a complex issue. To date no single loss allocation method has been universally accepted to be the most precise or the best one. Globally, different markets adopt different loss allocation schemes which suit their market structure. Various commonly followed methods are Pro rata allocation Proportional sharing Marginal / Incremental loss allocation Loss allocation methods using the admittance matrix Each of the above mentioned method has its own advantages and limitations. 8/2/2018
Loss sharing Methods… Pro rata allocation This is the method was till recently being followed in India. Under this, the loss is shared among the beneficiaries on pro-rata basis in a pre-defined manner, based on schedules/shares. It is relatively a simple method to use, however this does not take in to account the geographic distribution of the loads and the generators and is not sensitive to distance and direction. Since the losses are socialized, the calculations are simple and clear. 8/2/2018
Loss sharing Methods… Proportional sharing In this method it is assumed that the inflow of power in to the bus is to be proportionally shared by all the out going feeders and the tracing of power between the generator and the load is to be achieved. It works on the principle that the loss of each line is to be shared by the loads in proportion to the power flow attributable to them and the respective losses are to be borne by the generators or the load. However the assumption of the proportional sharing of power may not always meet the electrical power flow laws and power tracing may also give erroneous results, particularly in the situations like loop flows and under such situations more assumptions have to be made to trace the power flows. 8/2/2018
Loss sharing Methods… Marginal / Incremental loss allocation Under this method losses are determined on the logic that any marginal change in bus injection/drawl leads to marginal change in the losses. Choosing of slack bus and handling of negative loss allocation etc, are some of the issues of this method 8/2/2018
Some further References IEEE Trans Power System pp631-637 May 2000 A Physical flow based approach to allocating transmission losses ............. IEEE Trans Power System pp143-150 Feb 2000 Allocation of transmission losses to bilateral contracts....... IEEE Trans Power System vol16 pp105 110 Feb 2001 Z 'Z' Bus loss allocation IEEE Trans Power System vol 17 pp 26-33 Feb 2002 Incremental transmission loss allocation under pool dispatch.... IEEE Trans Power System vol 15 pp184-188 Feb 2000 Fair allocation of transmission power losses IEEE Trans Power System vol17 no3 pp571-576 Aug 2002 Transmission loss allocation: A comparison of different practical algorithms. 8/2/2018
Procedure for sharing of losses based on June 2010 regulation of CERC Procedure for Sharing of ISTS Losses Prepared by NLDC in compliance with Regulation 6(1) The procedure aims to keep computation: Simple Non-Recursive Loss Application on Regional Basis In line with existing practice No Pan caking. Injection and withdrawal loss calculated for each zone. 8/2/2018
New Methodology Point of Connection Losses Independent of Contract Path 50% PoC losses + 50% Uniform Losses Uniform Loss component Based on Regional Losses Moderation of Losses Based on Actual Regional Losses and Losses based on studies 8/2/2018
PoC Loss Computation (1) Computation of changes in losses in the system due to incremental injection / withdrawal at each node. Loss Allocation Factor 8/2/2018
PoC Loss Computation (2) Output of System Studies Loss Allocation Factor MW Losses of each node Weighted average losses (%) for each region Zonal Loss : Weighted Average of losses at each node Moderation of Zonal Losses One PoC Loss for each entity per week 8/2/2018 NRLDC
Loss Sharing Mechanism Software Provided by CERC Calculation of Losses from SEM Data Total Losses based on PoC Zonal Losses as Computed from Hybrid Method Moderation Of PoC Losses Total Losses (50% PoC+50%UC) 8/2/2018 NRLDC
Moderation of Losses (1) Need of Moderation Difference in actual and study scenarios Correct computation of injection and drawal schedule of various utilities. Scheduled losses to be closer to actual losses in the system so that system mismatch is avoided. Minimizing the mismatch between UI payable and receivable Moderation at regional Level Moderation Factor = Actual Losses of previous week (Aact) ( In %) ------------------------------------------------------------------ Regional Losses based on Studies (As)(In %) 8/2/2018
Regional Losses Based on Studies (As) Weighted average Actual losses of a region Actual Transmission losses (in MWh) in Regional ISTS, L = ∑Injection of Regional Entities G + ∑Interregional injection I) - (∑Regional Entity drawals +∑Inter-regional drawals) Actual Percentage Regional losses, l = L*100/ (G+I) This would be computed for each 15 min time block and then averaged for each week. 8/2/2018
Application of Losses in Scheduling Net PoC Loss = 50% Moderated PoC Loss + 50% Uniform Loss for last 1 year Provision of 3 slabs : each injection / withdrawal zone to be placed in low / average / high slab 50% of previous week loss – average slab Low slab 0.3% less, high slab 0.3% higher Loss to be applied on each regional entity Drawee Entity to bear full losses for : Long Term Transactions Injecting Entity and Drawee Entity to share losses for: Short Term Transaction Collective Transactions Bilateral Transactions 8/2/2018
Case I : Intra-Regional Long Term Transactions Zone Moderated Loss (%) A 3 B 5 B A 92.15 MW 100 MW 8/2/2018
Case II : Inter Regional Long Term Transactions Zone Moderated Loss (%) A 3 B 5 B 92.15 MW A 97 MW 100 MW 8/2/2018
Case III : Long Term Transactions Involving Wheeling Region Zone Moderated Loss (%) A 3 B 5 B 92.15 MW 97 MW A 97 MW 100 MW 8/2/2018
Case IV : Intra-Regional Short Term Transactions Zone Moderated Loss (%) A 3 B 5 100 MW Contract B A 95 MW 103.09 MW 8/2/2018
Case V : Inter Regional Short Term Transactions Zone Moderated Loss (%) A 3 B 5 100 MW Contract B 95 MW A 100 MW 103.09 MW 8/2/2018
Case VI : Short Term Transactions Involving Wheeling Region 100 MW Contract B 95 MW 100 MW A 100 MW 103.09 MW 8/2/2018
Thank You!