What has been learnt from LS1

Slides:



Advertisements
Similar presentations
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Advertisements

Development and Quality Plans
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Release & Deployment ITIL Version 3
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
TS, Length of YETS EYETS LIU & CONS Project
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Pre-Project Components
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
Use of PLAN in EN Department 1 st of April 2016 Michele Battistin.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
CERN Construction Planning and Scheduling (LHC installation)
East Area Renovation Project Team meeting # 2 – EDMS News
Machine operation and daily maintenance management in SOLEIL
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
Status and Plans for InCA
Equipment simplified model SMR UR safety
Injector De-cabling Project
K. Foraz on behalf of OSS members
Safety in Construction and Upgrade Phases
Configuration Management and Layout Database ELENA Project
Operational procedures and tools for scheduled shutdowns at CC-IN2P3
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Quality Assurance applied to Accelerator Safety
Overview & baseline of LS2 and roadmap for CRG
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
EP Experiments safety validation process Safety Permits
K. Foraz on behalf of OSS members
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Chapter # 4 Development and Quality Plans
Experimental Areas – LS2 planning
East Hall under construction
WORKSHOP Establish a Communication and Training Plan
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

What has been learnt from LS1 K. Foraz

K. Foraz - LHC Performance Workshop Content Preparation phase Implementation phase Safety Resources Discrepancies between baseline and reality Disclaimer: This is a 1st debriefing – the LS1 post-mortem day will be organized in 2015  Feedback got by Group Leaders (those available) 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Preparation phase "By failing to prepare you are preparing to fail.“ B. Franklin Preparation phase includes What  Goal & Collection and prioritization of activities How  Work Package analysis meetings, procedures When  ….did it start ? For the 1st time in my life I’m feeling I should've done something about my weight 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Preparation phase - Goal Activities to be performed according to the following priorities: P0: Safety P1: Beam to 7TeV, nominal performance P2: Reliable operation improvement P3: CERN approved projects P4: CERN non approved projects Main activities LHC SMACC Repair He leaks (sectors 3-4 and 4-5) R2E (mainly Pt1, Pt5 and Pt 7) Injectors CPS - Installation of the new access systems, Cooling and ventilation maintenance & renovation, Upgrade of the RF systems,.. SPS: Consolidation of 18kV transformers, Replacement of irradiated cables in BA1 and in TCC2, Installing new optical fibbers, New coated magnets in BA5 Maintenance of all the systems after 3 years of operation 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Preparation phase - What Collection and prioritization of activities: Plan.cern.ch Unique repository, useful for communication between groups  Groups had a clearest picture of the support to be given to other groups Attenuate bad surprises Ease the prioritization process for LS1 team, focusing only on discordance points But Should have come earlier Not all activities were announced Resources details redundant with APT ? Are they really needed in plan? In the future ? Use plan.cern.ch for collecting future activities Give enough time to groups to fill data Improve the tool to better fit with needs: redundancy with other tools, granularity between items + + + ~ ~ ~ 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Preparation phase - What Collection and prioritization of activities: LS1 day - Plenary session Very useful to have a better understanding of the requests Gave a good overview on LS1 activities Should have been scheduled earlier “Why not a recurrent annual meeting?” In the future ? Organize LSx day(s) On an regular basis LS1 day Tuesday, 12 June 2012 from 08:00 to 18:00 The aim is to announce the results of the survey and analysis of which activities will be performed during the first long shutdown (LS1), which activities might be performed subject to the availability of resources (call for extra manpower), and which activities will be postponed. The LS1 day will also provide the latest update on LHC & injector planning. The support groups will present their activities and organization during LS1. The aim is to crosscheck the requests from other groups and experiments, to avoid missing something and misunderstandings. A summary of the LS1 day will be presented at the LMC meeting on June, 27th. + + ~ 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Preparation phase - How Items covered: Description Conditions prior to start Schedule Perimeter of worksites Storage areas Logistics Risks and compensatory measures Radiological management Work Package analysis meetings Organized by coordination teams Gathered all stakeholders around the table Gave the opportunity to understand what other groups intend to do and how Lots of points clarified Procedures: Well prepared Review External review fruitful for SMACC In the future ? Work Package analysis & Procedures  Mandatory step External review: identify as soon as possible, which projects are concerned + + + + + 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Preparation phase - When Main projects SMACC project: 4 years of preparation R2E: 3 years of preparation Contracts: Up to 30-40wks to get a contract  technical specification from clients shall be ready in due time Recruitments - Flexibility posts: staff have to be hired 1.5-2.5 years prior to a shutdown In the future ? “The man who is prepared has his battle half fought” Miguel De Cervantes Keep allocating adequate & sufficient resources for preparation, in due time + + 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Implementation phase “Organize, don't agonize.” Nancy Pelosi Coordination Scheduling Documentation Daily management Information exchange 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Implementation phase - Coordination Coordination meetings held on regular basis Good feedback from groups Some concerns reported: North Area coordination: enhance group participation and publicize EATM meetings 7 injectors areas =7 meetings. Some rationalization ? Dedicated project meetings (SMACC, R2E) Solving technical aspects, daily schedule + ~ ~ + Enhance team spirit & ease information flow Very good follow-up on fields + + 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Implementation phase - Scheduling Schedules kept up to date by coordination teams & progress regularly presented: presentations, dashboard Project schedules Coordination scheduler part of the project for LHC Transparency of schedules for surface activities Hard process for some groups, mainly during the phases of production and surface validation ALARA: Activities scheduled as late as possible in certain areas Dose optimization Give few margin, and lead to stress at the end of the activity In the future ? Keep a member of coordination team (scheduler) within projects Improve availability of internal production and tests schedules To see how to optimize the start of an activity w.r.t. cooling period + + ~ + + ~ 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Implementation phase - Documentation Configuration Management Hardware baseline is kept up to date thanks to ES, HWP, Tests procedures, ECRs 104 ECRs treated in LHC, ~60 in injectors 90 ES, Procedures… Layout database update MAD/X file already up to date 2-3 months of update are still needed !! Vacuum, instrumentation (PVSS), electrical circuits, R2E still need to be treated Machine drawings with release notes still to be issued – “automatic machine drawings” In the future ? ECRs presentation in (LSC), LMC, IEFC to be kept on regular basis ECRs to be edited in due time 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Implementation phase – Daily management Stakeholders were the same as during the installation eased the whole process  reactivity Access … sinew of war Lifts breakdown Roadmap for LHC lift exchange in the pipeline Logistics Good management of material logistic TREC is working for underground transport, but shall be improved for surface transport + ~ + + 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Implementation phase – Information exchange Information flow fluid, but we can still improve: the information has sometimes difficulties to go down to worksite!! Information, sometimes hard to find Project: edms, indico, sharepoints… Up-to date version of schedule Understanding of the impact of a service unavailability on other equipments In the future ? How to improve information flow down to the worksites Rationalized project’ information  1web page indicating hyperlink to projects ? A repository of services unavailability and impact ? + ~ ~ ~ 25th Sept. 2014 K. Foraz - LHC Performance Workshop

K. Foraz - LHC Performance Workshop Safety Good Statistics (until September 2014) approximately 1.5 million hours of LS1 work delivered 22 minor accidents (no absence) 11 accidents with 98 days of absence Frequency rate: 7.3 & Severity rate: 0.07 New work supervisors and organization of safety Consensus: “safety rules and training arrived too late !!” In the future ? Training of work supervisors by safety coordinators ? Establish safety rules prior to the start (6 months at least) + ~ ~ 25th Sept. 2014 K. Foraz - LHC Performance Workshop

K. Foraz - LHC Performance Workshop Resources Feedback from Group Leaders Recruitment of our staff Need 1.5 – 2.5 years before the start Non LHC facilities suffered from lack of resources, as there were re- oriented to main projects Temporary detachment Very useful To be included before the start of LS Partial detachment – difficult to handle On the contractor’s side Maintenance contract  hard to find adequate personnel Unforeseen/last minutes work  exotic prices ~ + ~ ~ ~ 25th Sept. 2014 K. Foraz - LHC Performance Workshop

Discrepancies between baseline and reality This part will be detailed during the LS1 post-mortem day. First feedback: All baseline activities were done….and more Additional activities There were those unexpected : LHC QRL leaks, 15%-> 30% of splices… Those were those who «somebody» knew but forgot to inform the community !! Those induced additional workload to the usual support groups In the future ? Review plan list regularly Learn to say NO + ~ 25th Sept. 2014 K. Foraz - LHC Performance Workshop

K. Foraz - LHC Performance Workshop Conclusions Disclaimer: Many other information were provided, but 20’ is too short Despite all the points of improvements underlined, so far the LS1 is a success Thanks to the strong commitments and reactivity of our staff Most of the groups, and all the projects were very well coordinated The priorities defined by LS1 project leader were respected: Safety, Quality, Schedule Thank you ! 25th Sept. 2014 K. Foraz - LHC Performance Workshop