Detail Surveys, Tacheometry, Total Stations

Slides:



Advertisements
Similar presentations
(GET FAMILIAR WITH EQUIPMENT)
Advertisements

3. Surface levelling Use of a surface levelling: a)addition of altimetry to a planimetric map b)determination of volume using a net of squares 1.
Construction Surveys
Surveying Chain Surveying
Sz. Rózsa: Surveying I. – Lecture 2
Distance measurement Physical unit = metre (m) = the length of the path travelled by light in vacuum during a specific fraction of a second (1/
Types of angles A Z MLN – Horizontal angle ALM – Vertical angle
Distance observations
Chapter 6 Electronic Distance Measurement EDM
SURVEYING II UNIT IV PRESENTATION II.
Introduction to Cartography GEOG 2016 E
CS 128/ES Lecture 10a1 Surveying. CS 128/ES Lecture 10a2 Data for a GIS Raster data - characteristics? - sources? Vector data - characteristics?
1 EDM Calculations ASM 215 EDM CALCULATIONS. 2 EDM Calculations HORIZONTAL DISTANCE MEASUREMENT n In plane surveying, the distance between two points.
“LATEST TECHNIQUES IN SURVEYING
Electronic Distance Measurement (EDM)
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
CHAPTER 2 CHAIN SURVEYING Tape Measurements
Angular measurement 1. Line of sight – the join of the points S and P Horizontal direction – the intersection between the vertical plane  i where is.
Surveying I. Lecture 10. Traversing.
Surveying I. Lecture 13. Tacheometry.
Scale Feature that relates distances on a map to distances on Earth
Trigonometric heighting.
Surveying I. Lecture 11. Setting out straight lines, angles, points in given elevation, center line of roadworks and curves. Sz. Rózsa.
SU 4100 GEODETIC POSITIONING Instructor: Indra Wijayratne.
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
MODERN SURVEY (FAMILARISATION WITH EQUIPMENTS). Modern equipments EDM – Electronic distance measurement eqp. EDM – Electronic distance measurement eqp.
Surveying I. Lecture 9. Plane surveying. Fundamental tasks of surveying. Intersections. Orientation.
TECHNIQUES IN BASIC SURVEYING
Harry Williams, Cartography1 Elevation: Definitions: Elevation - height above some arbitrary datum; on USGS maps this datum is mean sea level (“0” feet).
ERT247/4 GEOMATICS ENGINEERING
 PREPARED BY: 1.Sindha.Rinku.R 2.Trivedi.Hasti 3.Kamdar.Karan  GUIDANCE BY : ASHISH RATHOD (ASST.PROF.) Modern tools of Surveying & Mapping.
ELEMENTS OF CIVIL ENGINEERING (Subject Code )
TOPIC 5 TRAVERSING MS SITI KAMARIAH MD SA’AT LECTURER
ERT247/4 GEOMATICS ENGINEERING
SUBJECT - SURVEYING – I SUB.CODE - CE6304
Principles of the Global Positioning System Lecture 02 Prof. Thomas Herring Room A;
Join Calculation calculation of the
Civil Engineering Surveying Roy Frank. Planning A Survey  Planning requires a well rounded understanding of surveying practices  Process: 1. Choice.
The main object of shore line survey is to prepare a topographical map of the shore line.
Handled by, R.PRADEEPA, M.E Assistant Professor, Department of Civil Engg, PITS.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Survey & Reclamation of soil Prepared by M. U
Mr. Vedprakash Maralapalle, Asst. Professor
Miscellaneous Measurements
Stadia Reduction.
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
Chain surveying Notes.
Plane table surveying with contouring
Topographical Maps.
Total Station Surveying
Surveying 1 / Dr. Najeh Tamim
TEE SQUARE, SET SQUARES, COMPASS AND PROTRACTOR
Angle, Distance, Traverse, and Leveling Errors
Angles and Directions.
Modern Surveying Instruments
Angles and Directions.
Topographic Survey Introduction „ Mapping surveys are made
Topographic Survey Introduction „ Mapping surveys are made
TACHEOMETRY.
Distance Measurement.
Tachometry.
Distance Measurement.
Angles and Directions.
Chapter #1: Basics of Surveying
Surveying I. Lecture 13. Tacheometry.
Revise No. 1.
Surveying With Construction Applications, 7th Edition
Surveying With Construction Applications, 7th Edition
Engineering Surveying Linear Survey
Presentation transcript:

Detail Surveys, Tacheometry, Total Stations Surveying II. Lecture 3. Detail Surveys, Tacheometry, Total Stations

Offset surveys

The optical square Top view

Offset surveys – computation of chainage and offset

Offset surveys – computation of coordinates

Principle of tacheometry „Fast measurement” – measurement of horizontal and vertical coordinates of detail points in one step. Principle of tacheometry The horizontal position of the detail point is computed using the polar coordinates (WCB & dh), while the elevation is measured using trigonometric heighting.

Principle of tacheometry Horizontal coordinates: (NA,EA) and (NT,ET) are known; jAP, tAP is measured. Exercise: compute the coordinates of P Solution: WCBAT is computed (2nd fundamental task of surveying; WCBAP is computed by transfering the WCB from AT to AP (WCBAP=WCBAT+jAP); the horizontal coordinates of P are computed by the 1st fundamental task of surveying

Principle of tacheometry Vertical coordinates: hI – instrument height hS – signal height zAP – zenith angle dS – slope distance Measured DhAP=? DhAP=hI+dSsinzAP-hS

Measuring the slope distance Older instruments: use the optical method (stadia lines) to measure the distance. The maximal range is 150-200m, and the accuracy 15-20cm. Latest instruments: EDMs are used to measure the slope distance. The maximal range is usually 2-3 km, accuracy is 1-2 cm.

Electronic tacheometers (Total Stations) Important features: automated distance measurements and angular observations; the observations can be corrected for the effect of systematic error, and reduced to the MSL; the data can be recorded for later use; observation software enables the instrument to compute coordinates and stake out.

Operation of Total Stations Centering and leveling the instrument by the operator observing the slope distance (ds), correcting the effect of the reflector constant, the frequency error and the meteorological correction; the horizontal (Hz) and vertical (V) angles are read, and the effects of the collimation and index error are accounted for; the horizontal distance (dh) and the elevation difference is (Dh) is computed (instrument and signal height must be entered previously); the data set (ds, Hz, V) or (Hz, dh, Dh) is logged.

Important software of Total Stations Free station establishment The station coordinates are computed using angular and distance observations to known points (resection, arc-section and their combination). In most cases the orientation is also done. Determination of the elevation of the station by trigonometric heighting to known stations. Orientation of the horizontal circle by taking horizontal angle observations to known stations. Computation of rectangular coordinates (N,E) using the polar coordinates (provisional WCB and horizontal distance)

Important software of Total Stations Tie distance The horizontal distance between two measured detail points can be computed using their coordinates. Remote object by measuring the horizontal distance to the vertical of a remote object, and the zenith angle.

Detail surveys using tacheometry Preparation densification of control network; finding suitable places for free station establishment. Detail survey detail points of: buildings; linear objects (e.g. electric poles); rectangular buildings; arcs; topography.

Detail surveys using tacheometry Identifying the detail points drawing a sketch of the area, and marking the detail points on it with ID numbers; recording the coordinates or observations with the same ID numbers; ensure that the two numberings are identical; Mapping the survey marking the positions of the detail points in a given scale; the elevation of topographic points should be written on the map; contour lines are interpolated between the measured topographic points.

Thank You for Your Attention!