Ground System implication for ASAS implementation

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
SESAR and ASAS Opportunity
Applications from packages I to III
Sense & Avoid for UAV Systems
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Airbus Status on ADS-B In / Out Update
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Overview Jean-Marc Loscos, DSNA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
SIP/2012/ASBU/Nairobi-WP/19
Safeguarding flight data and locating/recovering on-board recorders
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Chris Shaw, EUROCONTROL Experimental Centre
Karim Zeghal EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Project Overview & User Forum Objectives
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Capabilities of TIS-B for Supporting ASAS
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

Ground System implication for ASAS implementation Prepared by Patrick Souchu STNA/3E patrick.souchu@aviation-civile.gouv.fr

Agenda ADS-B Package 1 Sequencing and merging application Ground Surveillance Application Airborne Surveillance Application ATSAW : PO-ASAS level 1 application ASAS : PO-ASAS level 2 application Sequencing and merging application Global architecture Arrival and departure manager FDPS HMI Data-link CPDLC ADS-B network Training tools Recording Preliminary conclusion 29/04/03 ASAS-TN

ADS-B package 1 GSA Non radar area surveillance Ground ADS-B station Should not be very expensive compared to a radar Installation cost can be the most significant (e.g. access road) Controller HMI Not really different from radar surveillance Airport surface surveillance Complement an existing SMGCS Enable SMGCS on medium or small airport Complement radar surveillance Integration with Mode S radar stations Additional ADS-B infrastructure 29/04/03 ASAS-TN

ADS-B package 1 ASA ATSAW ASA A priori no impact on ground ATM system If no difference in operational procedure ASA In trail procedures Oceanic environment Passing and Crossing application Difficult to assess real impact on ATM system and responsibility sharing between pilot and controller Sequencing and merging Co-Space demonstration Potential benefit for extended terminal area Operational concept to be further defined preliminary impact assessment on ground system 29/04/03 ASAS-TN

Sequencing and merging application Arrival and departure manager Takes into account aircraft capability Provides the controller with a proposed sequence and prepares instruction for sequencing Time or distance separation Impact on trajectory prediction FDPS Aircraft capability indicated in flight plan ? Trajectory prediction 29/04/03 ASAS-TN

Sequencing and merging application Controller HMI Display of aircraft capabilities ADS-B out for target aircraft ASAS capability for trailer aircraft Display of linked aircraft Designation of target and trailer aircraft Allocation of a separation Integrated with arrival departure manager specific function Monitoring of separation Appropriate new warning tools Between MTCD and STCA Recovery function Termination of the ASAS separation 29/04/03 ASAS-TN

Sequencing and merging application Need for data-link Enhanced CPDLC is probably the best solution to give sequencing and merging clearance Unambiguous identification of aircraft Easy integration of data into airborne systems Ensure consistency between air and ground views Need for new messages to be defined by ICAO Enhance ATN CPDLC communication stack Upgrade of communication systems (eg Air server) Additional CPDLC functions in controller HMI 29/04/03 ASAS-TN

Sequencing and merging application ADS-B network Reception of ADS-B data on ground is needed Confidence in ADS-B current capabilities of each aircraft Improvement of radar surveillance with ADS-B may be necessary Specific ADS-B ground stations or Enhancement of Mode S radar capabilities Omni directional 1090 MHz reception capabilities Enhance radar tracking with ADS-B Integrity monitoring with radar data Combination of ADS-B and radar for enhanced tracking ARTAS Radar networks impact 29/04/03 ASAS-TN

Sequencing and merging application Other tools Training simulator All previous capabilities must be available in controller training tools Pseudo pilot new tool to manage sequencing Simulation of new trajectories Monitoring of ADS-B ground stations Recording ADS-B data Sequencing and merging specific events 29/04/03 ASAS-TN

Conclusion A very preliminary analysis new concept and new procedures always impact the ATM system Too early for any Cost assessment Safety implications Is a unique data-link sufficient ? Development level of ATS system supporting ASAS Transition to be considered Need for TIS-B Transition accommodation feasibility with TIS-B ? ASAS capabilities to be integrated in ATS system development plan Implementation timescale is difficult to assess 29/04/03 ASAS-TN

Conclusion From ASAS spacing to ASAS separation Spacing is supposed not to change task responsibility sharing and separation minima ASAS separation will impact both Controller tasks to be defined Strategic air traffic management Monitoring Airborne separation minima to be defined Fixed or dynamic Coordinated with ground ATM ? Recovery procedures and tools Spacing is a huge step, separation will be even bigger 29/04/03 ASAS-TN