The Way Forward ISS to IDS

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS phone meeting 8 dec Alain Blondel ISS detector study Convener Alain BlondelAlain.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Welcome to the First Meeting of the An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
ISS After One Year Peter Dornan Imperial College London.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
European design study on Neutrinofacilities - Euronu within FP7.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Alain Blondel NUFACT11 1 August Rhone route Shopping route Historic route count >> 30 minutes ! Boarding on ship Henri-Dunant at 19:15 CANT BE LATE.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
NUFACT 11 SPC meeting I Agenda 1.Summary of local organizing committee work layout of meeting reservation of rooms Social program Accommodation 2. Program.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
International cooling experiment 1 Towards an International Cooling Experiment Motivations: --Ionization cooling is an important ingredient in performance.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Publications (continued) Proceedings NuFact07 proceedings: AIP Conf Proc. 981 (2008) (14) NuFact05 proceedings: Nucl. Phys. Proc. Suppl. 155 (>35) HIF.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
Researchers Supervisors Local Coordinators Administrators EU- Coordinators Industrial Partners Assoc. Partners.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
CARE05, 25Nov2005V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Investigating System Requirements
ICE SECTION The coolest place to be! Elias Métral
Final Discussion THE EUROPEAN STRATEGY FOR FUTURE NEUTRINO PHYSICS
Accelerator R&D for Future Neutrino Projects
Collaboration Board Summary
SCC P2P – Collaboration Made Easy Contract Management training
Third Workshop on GEMs for CMS
MICE Project in the US: Completion of Efforts
European Detector R&D: AIDA
Outline: Why now ? What ? How ?
Charge for APS Neutrino Study
The DBD: Outline and Scope
Milestones & Deliverables BENE III period Jan 06 - Jun07
Report from ICFA neutrino panel
as of today 123 registered participants
Next steps, organisation, discussion
Evaluate the effectiveness of the implementation of change plans
This Presentation Pack is brought to you by
ICFA Neutrino Panel: Roadmap discussion document
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Water Directors meeting Warsaw, 8-9 December 2011
Presentation transcript:

The Way Forward ISS to IDS ISS - Ended NuFact 2006 IDS – Starts NuFact 2007 Aims, Structure, Resources

ISS – Recapitulate Instigation A Re-evaluation of the Neutrino Factory Situation Following the earlier studies mainly in the US And a new interest in the UK Was set up very quickly Meeting in London May 2005 – Launched NuFact 2005 Aim A Baseline Scenario for a more detailed study An R&D Programme Originally considered for a Neutrino Factory Solution But with the aim of comparison with other solutions 30 Mar 2007 P Dornan

ISS Structure Resources Physics Accelerator Detectors Why do precision Neutrino Physics Compare the techniques for that phase Accelerator Origiinally Neutrino Factory but extended to Super beams following requests Detectors Sressed importance Considered all possibilities – magnetic and non-magnetic Resources Mainly a paper exercise - therefore mainly travel Institutions, Universities, Funding Agencies, BENE, NFMCC, UKISS 30 Mar 2007 P Dornan

Continuation → the IDS Should we continue? At NuFact06 From this meeting I consider YES At NuFact06 Aims - for the Neutrino Factory Solution An Interim Design Report 2010/11 A Reference Design Report 2012/13 Problem How to Handle the different techniques Superbeam, Betabeam, Neutrino Factory 30 Mar 2007 P Dornan

Proposed Structure at NuFact06 This has cause some Unhappiness So we should discuss! 30 Mar 2007 P Dornan

Obtaining Resources Difficult Need Resources for both travel and R&D FP7 bid to cover aspects of NuFactory, Betabeam and Super beam Other bids for Detector R&D Some from NFMCC and UKNFC But - Need more 30 Mar 2007 P Dornan

Preparing for IDS (NuFact) Launch at NuFact07 An ad-hoc Steering Group has Formed K Long (Co-ordinator), A Blondel, A Bross, P Dornan, M Dracos, R Edgecock, H Kirk. Y Kuno, Y Mori, M Lindroos, N Mondal, Y Nagashima, V Palladino, P Soler, M Zisman, Representatives from Betabeam and Superbeam Community Not Exclusve! All welcome to take part Next Meeting after this Discussion Aim to have a firm plan for the NuFact-IDS by NuFact07 30 Mar 2007 P Dornan

Venue: CERN Building 1-1-025. Agenda 1. Notes of previous meeting and review of actions Meeting Minute Initials Action Target date Status 09-Feb-07 2.4.1 KL Seek to establish small international communication team for glossy. 20-Feb-07 Done 21-Feb-07 2.1 KL, MZ, Abl Produce 10 page summary of working group reports by 14Mar07 14-Mar-07 2.2 PJD Assemble 10-page summaries into 30 page document by 28Mar07 28-Mar-07 2. Status of ISS report: 2.1 Physics Group report: KL 2.2 Accelerator Group report MZ 2.3 Detector Group report AB 2.4 Preparation of ’12-page’ glossy summary 2.5 Next steps PJD/All 3. ISS®IDS meeting at CERN 19–21Feb07 close-out 4.1 Discussion All 4. Summary of actions 5. Next meeting(s) · Phone: Friday 04Mar07, 13:30 GMT 6. AoB 30 Mar 2007 P Dornan