Status of the MOPOS BI TB – 26th June 2014.

Slides:



Advertisements
Similar presentations
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Advertisements

XP Practical PC, 3e Chapter 17 1 Upgrading and Expanding your PC.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
GBT Interface Card for a Linux Computer Carson Teale 1.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
January 19, 2006PEP TFB R.Akre PEP II Transverse Feedback System Ron Akre William Colocho Anatoly Krasnykh Vojtech Pacak Dmitry Teytelman Uli Wienands.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
Software development Control system of the new IGBT EE switch.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
VFC-HD PROJECT STATUS AND OUTSTANDING SEPTEMBER 2015.
BPM stripline acquisition in CLEX Sébastien Vilalte.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
The LHC Beam Position System Ad-hoc Working Group on LHC Experiment-Machine Parameter and Signal Exchange 26 th March 2002 Rhodri Jones (SL/BI)
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Test Boards Design for LTDB
D. Breton, S. Simion February 2012
Christophe Beigbeder PID meeting
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Status of Interlock BPM
Update on the VFC 8th June 2016 The VFC fan club.
New developments and inventory
Injectors BLM system: PS Ring installation at EYETS
Ideas and design concepts, and challenges
Ewald Effinger, Bernd Dehning
Instrumentation for SPS 2006 restart
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
The ELENA BPM System. Status and Plans.
ALPS SPS BPM Read-out Electronics RF Front-end – revised
LHC wire scanners status
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Ongoing BE-BI developments going to be exposed to radiation
SPS Beam Position Monitors: Front-End Electronics
Injectors BLM system: PS and PSB Ring installations at EYETS
LHC BLM system: system overview
Electronics requirements for special diagnostics for the XFEL
SPS BPM system renovation
ERL BPM System Mike Billing, Mark Palmer
Combiner functionalities
Proton Beam Diagnostics
Fiber Based Synchronous Timing System
Status of muon monitor R&D and construction
Report on Beam Loss Monitors
Safety, reliability and maintainability
VME64x Digital Acquisition Board
SVT detector electronics
Head-Tail Monitor for CC Diagnostics
LIU BWS Firmware status
Beam instrumentation and background monitoring
Presentation transcript:

Status of the MOPOS BI TB – 26th June 2014

Existing MOPOS MOPOS has been restarting during the last few weeks…no major faults Repair of 56 BPM Channels List of faulty BPM identified by OP, including BPA and BPD Replacing mainly analog module Replacement of BPA, BPD (resonant pick-up) with BPCE striplines

Existing MOPOS - Spares Item Installed Spares Comments MOPOS VME Crate with special P2 Bus 6 1 SAC 1,Std PowerPC RIO2 8060 version DA, HA or OA 4 may be more.. 1Gb RAM extension PCI extension PEB 6406 ‘porte avion’ 1 PCI extension PEB 6407 ‘porte avion’ 2 PMC Acquisition card (MACI) mezzanine 24 19 CTRV Std CTDAF 3 SEQ III 5 Recuperated from ttpos TIMD 2 Power Supply Many (>20) spares of analog modules: (pre-amp, filter/calibration, Homodyne receiver, SHAD (digitizer) + some modules to be repaired

Existing MOPOS Situation of Spares UPS in Ba’s Having as many ‘hot spare’ as possible (>1 full system) Need to test all spares now VME system and related components are more critical but, we had very little to change over the last 4 years Analog modules are not an issue UPS in Ba’s By design VME crate on UPS Some system has not been maintained fully operational, i.e. in BA3 Action to be done to run both analog and digital electronic on UPS electrical network

Hardware Status Installation Status Short and long-term plans MOPOS Renovation Hardware Status Installation Status Short and long-term plans

SPS Beam Position Monitors Monitor Type Physical Beam Aperture (mm) Quantity Mechanical Section Comments BPH 44V x 154H 103 rectangular Electrostatic shoe-box BPV 83 x 83 94 square BPCN 76 7 circular Strip-line directional couplers BPCE 206 12 Total = 216 BPMs: 6 x 36 slots MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

MOPOS Front-End Layout MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014 MOPOS Hardware Status Pick-up Adapter - Development: MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014 MOPOS Hardware Status Beam Calibration: “Transfer-Relay” development MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014 MOPOS Hardware Status LogAMPS Need minor corrections 2nd prototype under test right now MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014 MOPOS Hardware Status ADC, FPGA & Optical Transmitters Octal-14bit-ADC: AD9252 Xilinx Spartan-6 FPGA (VFC-V2 Compatible) Versatile Link (rad-hard) & Commercial SFP module Interface for Diode Detector Acquisition (Marek’s development) MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

MOPOS Installation Status Mini-Racks The SPS tunnel has been equipped with 6U & 16U Mini-Racks. Cables Installation completed in LSS1 & LSS6 (EN/EL) Next (LS2): LSS2…LSS5 Local cabling not done yet Fiber Installation (LS1) Installed: Sextants 1, 5 & 6 and Shaft 4 Still to be done: Shaft 3 MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

MOPOS Tests in SPS-Sextant 6 Installation of prototype modules (2014/2015) Test and validate the performance of the FE electronic LogAmps, Beam-Calibrator Pick-up adapters foreseen to run Old & New MOPOS in parallel Front-end Electronics modules will be installed both in the tunnel and in surface buildings in order to test their susceptibility to radiation Installation of a VME crate in BA6 VFC-V2 modules will be used for the New MOPOS functional tests MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

MOPOS Installation Plans Current Plan Development of a radiation-hard digital board (2014..) Test in SPS tunnel and at CHARM (PS) Complete the fibre installation (BA2…BA5) during LS2 Commissioning of new system post LS2 Option : if major issue with existing MOPOS (2016/2017) Use the BPM-cables to transfer the pick-up signals to surface buildings (BA1…6) Based on new VFC-HPC MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014

VFC - HPC SRAM vs DDR3

External memory requirement for the MOPOS: can DDR3 be used? The Capture mode is the acquisition mode that uses the external memory in the MOPOS There are 2 “capture modes”: The debug mode saves all the data but only for one plane The operational mode stores the data only for the selected sensitivity but for both planes Both modes write 4 32bit words each 100ns into the memory leading to a required transfer rate of 1.24Gb/s that is compatible with the DDR3 (1.33Gb/s) but without much margin Both modes have data redundancy that could be eliminated and would reduce the required bandwidth to ≈ 800Mb/s

Plans for VFC-HPC Currently testing the VFC with SRAMs Modify the bugs we found Produce an operational version with SRAM at least a gerber file (little amount of work/money involved) New VFC with DDR3 Outsourcing design and layout Testing a first prototype early next year

Specification SPS Beam Type Bunch spacing Bunch number Bunch charge [1010] Bunch length [4: ns] FT / CNGS 5 ns 400-4000 0.1-2 1-4 LHC25NS 24.96 ns Nbatch × 72 1-35 LHC50NS 49.92 ns Nbatch × 36 LHC75NS 74.88 ns Nbatch × 24 LHC single bunch 524.4-2022.6 ns 1-16 0.2-35 LHC ion / Pb82+ 100 ns Nbatch × 4 0.05-2 Nbatch: Protons[1-4]; Ions[1-13] Bunch charge dynamic range: 57dB Orbit acquisition: averaged over 40 turns [40x23µs=920 ms] (@1kHz up to 100s) 100k turns total Trajectory acquisition: 50 first turns (automatic) & 10k turns total (on request) Resolution over ±15mm aperture, for large intensity beams (>2.1010 p): Orbit mode: 0.1 mm ↔ BPH [Na=77mm]: 0.1% BPV [Na=41.5mm]: 0.2% Trajectory mode: 0.4 mm ↔ BPH: 0.5% BPV: 1% Resolution over ±15mm aperture, for single bunches (LHC pilot [2.109 p]): Orbit mode: 0.4 mm ↔ BPH: 0.5% BPV: 1% Trajectory mode: 1 mm ↔ BPH: 1.3% BPV: 2.4% Required accuracy (without alignment): 0.5 mm ↔ BPH: 0.6% BPV: 1.2% MOPOS Upgrade - TB - JL Gonzalez - 26.06.2014