Pricing your Products to be Profitable

Slides:



Advertisements
Similar presentations
The Five Ss.
Advertisements

5S training Office Environments.
CONTINUAL IMPROVEMENT
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.
Operations Management Just-in-Time Systems Supplement 12
CSUN - Prof. David Shternberg
Just-In-Time “Eliminate Waste”.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
The Seven Forms of Waste
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes.
The Concept of Waste ”Understanding & identifying waste is the
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
LeanSigma ® Facilitator Training Module 5 – Waste.
Value Analysis/ Flow Analysis
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Just-In-Time & Lean Systems
Developing a Lean Strategy Akın Aydemir05.July.2012.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
LeanSigma ® Fundamentals Module 4 – Specify Value.
WASTE Process Improvement Consulting.
What is DOWNTIME? Scott Thor © Variance Reduction International, Inc. (VRI), All Rights Reserved.
Value Stream Management
Philosophy and Key Concepts
Lean Production (MUDA)
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
CAD CAM CADMAT A2 Graphics. CADMAT We will look at … We will look at … CADMAT CADMAT –Computer aided design, manufacture and Testing PDM PDM –Project.
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
7 Types of Waste –C –Correction –O –Overproduction –M –Movement of Material & Information –W –Waiting –I –Inventory –P –Processing Lean Principle: Lean.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Lean Manufacturing. Why do this? Lets look at jobs on Monster.com that refer to Lean - ployer/?WT_srch=1&s_kwcid=job%20ope.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
Waste Identification Business Excellence
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
Waste reminder The 8 Wastes To remember The 8 Wastes, you can use the acronym “DOWNTIME” Defects Efforts caused by rework, scrap, and incorrect information.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
Lean Production Just in time - It originally referred to the production of goods to meet customer demand exactly, in time quality and quantity, whether.
Identification of Waste WASTE Input (Resources) Energy People Capital Water Materials Tools Output Products Services WASTE Transformation.
Lean Production Strategy Lean Manufacturing Strategy
Cost of Poor Quality Cost of Poor Quality.
Getting Started with Flow
Introduction to Motion and Time Study
CHAPTER 9 Lean Manufacturing.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Mel Wendell – Mountain Pointe High School
Lean Manufacturing 7+1 wastes
COMPUTER INTEGRATED MANUFACTURING
Lean Manufacturing Basic Overview XYZ Company.
A Brief Introduction to Lean Concepts for the Office
Chapter 2 Office and knowledge work
Welcome to my presentation
4.3 Increasing efficiency and productivity
Re-order level formula:
Ideas and skills not used Movement of people or material
Lean and Quality Management Basics of Lean Management
Just In Time.
The Impact of Lean manufacturing on WIL to the productivity of Industry Introduction Methodology Results Conclusions.
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Introduction to Lean and Lean Training
Waste.
Presentation transcript:

Pricing your Products to be Profitable Friday 11th March 2016

Workplace Organisation

Numbers game On the following sheet are the numbers between 1 and 99, can you tell me which ones are missing?

Numbers game If I told you that there are two missing numbers and they are between 1 and 49 – removing all the unnecessary numbers above 50 might make things easier.

Numbers game If I now told you that there was some order to the numbers on the sheet – would you then be able to tell me which numbers are missing?

Numbers game Arranging the numbers in order makes things very clear

Information People and process Material A business typically has three flows which deliver a product or service to a customer Information Customer requests for goods and services Supplier Business Customer Step 1 Step 2 Step 3 Step 4 People and process Raw materials, Installation Equipment, etc. Material

5 Business Principles Specify Value - What does the customer want/need ? Perfection - Pursue zero waste and CI Identify Value Streams - Sequence of processes from raw material to final product Pull - Make only what the customer wants Make Value Flow - Avoid batch and queue

Value & Waste WASTE VALUE Only an activity that physically changes the shape or character of a product and/or that the customer is prepared to pay for can add VALUE Therefore Any activity that does not change the product or that the customer will not pay for is WASTE

Value and Waste Waste Value Non-Value Adding Activities 5% 95% Waiting & Delays Movement Excess Production Set-Ups Breakdowns Searching & Storing Scrap & Rework 95% Value What the Customer is prepared to pay for 5%

The 7 Wastes (+1) : Overproduction Waiting & Delays Inventory Movement (stocks + work-in-progress) Movement of People Talent Inappropriate Processing (procedures & paperwork) Transport of Materials Defects & Rework

Overproduction Root Causes Too much – more than is needed long set ups batch sizes design of process & layout using up material Too early – earlier than is needed lack of machine capacity subcontracted operations long in-process delays and leadtimes Building more than the customer wants? (just in case) How many shortages were created? Where is the addition stock/parts stored? How much did this cost?

Waiting & Delays Root Causes How often does it occur? Why does it happen? How much does it cost? Waiting For: Paperwork Instruction Supervision Products Machines No material scrap breakdown poor schedule poor purchasing procedures poor supplier lack of preparation or instructions materials stored incorrectly / missing No machine set-ups large batch no tool, jig, fixture, gauge No man skill shortage absenteeism watching another machine

Inventory (stock + work-in-progress) Root Causes Unbalanced Material Flow synchronisation between stages level quantities in and between stages Cushion Storage breakdowns rejects poor suppliers or buying Safety Storage increase feeling of security Lot Delays transfer batches greater than one layout How much does this cost? Why does it happen? How much space is taken up by stock?

Transport of Materials Movement of People How much excess movement do you do each day? How long does this take & what’s the cost? What else could you have done with the time? Root Causes Layout Workplace Organisation Functional Organisation Work-in-progress and/or stock levels Transport of Materials How many times are materials handled? What do racks do to the process? How much time is spent handling materials?

Inappropriate Processing (procedures & paperwork) Root Causes Wrong tool, jig or machine specification Poor procedures or process Lack of operator skill or knowledge Roughing cuts due to oversized material Deburring due to poor tool maintenance or product design Could things be done more simply? Buy expensive machines and what can happen? What happens to set-up times on big machines? Are operating procedures, testing procedures and paperwork fit for purpose?

Defects & Rework Root Causes Wrong tool, jig or machine specification Poor procedures or process Lack of quality prevention and inspection Lack of operator skill or knowledge How much does a defect cost? How much does rework cost? Can you add value twice? What do defects do to production?

Talent What extra skills do people have? How could these be used? What will be the benefit?