Mircea Stirbet Jefferson Laboratory

Slides:



Advertisements
Similar presentations
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Vertical Test Area RF qualification of C100 cavities for 12 GeV project Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power.
Cleaning Methods of SRF Power Couplers Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
First 200 MHz Superconducting Cavity for NuFact H. Padamsee, R. Geng, E. Chiaveri, R. Russo Presented by D. Hartill.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Advances in Large Grain Resonators Activities of DESY, W.C. Heraeus and RI material and fabrication aspects preparation and RF test results W. Singer,
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
LHC vacuum chamber dust High Pressure pure water rinse –Developed at CERN for LEP sputtered SCRF NEG Coating –Most likely must be re-applied Nozzles and.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
ELBE SRF Gun Testing Status PeterKneisel (JLAB) For the Rossendorf Team A.Arnold,P.Murcek,J.Teichert,P.Michel,P.Lu, H.Vennekate,R.Xiang T.Kamps (HZB Berlin)
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Plasma Cleaning of SRF Cavities Program Status J. Mammosser, S. Ahmed, L. Phillips Jlab S. Popovic, J. Upadhyay, L. Vuskovic, M. Nikolic ODU.
Cleaning Methods of SRF Power Couplers Mircea Stirbet TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Cost Optimization Models for SRF Linacs
SC Activities at IAP Frankfurt
Field Emission: recent update and what we can do
Requirements for Efficient CW SRF Cryomodules
(4 areas/website front)
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
DESY Experiences on Use of Gas overlay during Assemblies
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
for the FNAL/ANL, JLab, and Cornell cavity teams
WG-1 Session Cavity Performance Cryomodule Performance
High Q via N infusion R&D at Jefferson Lab
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Some History of Electropolishing of Niobium 1970 – 1990
Effort Torwards Improving Large Scale Production for SC Cavities
HWR Cavities for China ADS
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
Highlights from EU Global Design Effort
TTC topical-meeting on CW SRF 2013
Cost Optimization Models for SRF Linacs
RAPPEL TITRE PRESENTATION
Implications of HOMs on Beam Dynamics at ESS
Performance of Large Grain TESLA cavities
IHEP Cryomodule Status
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Strategy for operation and recovery of performance at SNS -Background -History of performance -What is our operational strategy -Performance recovery.
Cryomodules Challenges for PERLE
SRF Science and Technology
SNS Coupler Shipping Plans
HWR and Test Cryomodule for China ADS
Presentation transcript:

Mircea Stirbet Jefferson Laboratory RF as cleaning tool Mircea Stirbet Jefferson Laboratory TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly. 12-14 Nov 2014 CEA Saclay, France

TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly Outline Routine VTA RF qualification tests done at JLAB (Cavity LL02 used as example) RF processing of LG650 MHz cavity Conclusions TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 1

Vertical test Area (VTA): Dewars area Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December 2011 CERN – Geneva Switzerland TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 2 Vertical test Area (VTA): Dewars and control room

VTA Operator interface and low loss cavity LL002 at 42 MV/m Quench At 42 MV/m TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 3

Qo and radiation vs Eacc TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4

Field emission onset 26.83 MV/m TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4

VTA tests done on LL02 in 2004 and 2010 ILC design requirements 27 MV/m C100 admin limit 12.5 MV/m C50 requirements TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4

TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly R&D on 650 MHz cavities We have fabricated several cavities from different types of niobium in an investigation to learn more about performance differences based on material choices: The first of the three was made from reactor grade niobium with RRR – value of ~ 50 (named “RG”) The second cavity was made from the same material, but the sheets for deep drawing of the half cells were welded together by EBW from smaller pieces (“stitched”) – the motivation for this approach was to explore, if lower frequency cavities (< 400 MHz,) for which large enough sheets possible were not available by a manufacturer, could achieve reasonable performances, e.g. Eacc ~ 8 MV/m, which at the time was the specification for the BES/ICS proposed cavities(cavity is named “Stitched” ) The third cavity was made from high RRR, ingot material, which had to be enlarged to a larger diameter ( ~ 510 mm diameter) in order to be useable for deep drawing of a half cell (named “Ingot”). TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4

LG 650 MHz Cavity manufacturing The large grains cavity will be used to demonstrate the efficacy of RF processing during VTA RF power testing. TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France

TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly Cavity fixturing Prior to the cryogenic testing, all cavities received the same final surface treatment after the hydrogen degassing: an ultrasonic degreasing in soap/water solution (“Micro”) was followed by 50 mm of BCP, rinsing in hot and cold water and a subsequent high pressure ultrapure water rinsing (HPR). The respective cavity was dried in our class 10 clean room for app. 12 hr before the auxiliary parts ( input coupling probe/pump-out port and transmission probe), which were carefully clean by blowing off remaining particles with nitrogen, were attached with AlMg-gaskets. The cavity, which was fixed in a Ti - frame for stability and handling, was attached to the test stand (see figure 3) in front of a laminar flow wall and evacuated for > 12 hr. In initial tests the cavity was not fixtures to the Ti- frame as shown in figure 3 and significantly deformed after evacuation. In particular, the “stitched” cavity ended up with a “re-entrant – type” shape after evacuation, the most likely cause being the annealing/softening of the material due to the “stitching” electron beam welds. These deformations increased the cavity frequencies by several MHz TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France

TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly. RF processing TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly. 12-14 Nov 2014 CEA Saclay, France

All data on the same graph for VTA tests done LG650D TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly. 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4

Final run on LG650D after RF processing TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4

Radiation onset LG650D after RF processing TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4

Conclusions for RF processing RF processing is suitable for cleaning of SRF components if applied in a reasonable amount of time (several hours). If no progress is noticed after several hours of RF processing, the cavity performance could be affected by issues not related with cleaning. Efficiency of RF processing: CW mode – pretty good Pulsed mode – not so efficient (change pulse duration, repetition rate) – take more time. Some limitation related with filling up/discharge the cavity. Help to minimize radiation output during RF processing. Phase processing In a cryomodule, consider He processing. Plasma processing – take care. TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4

TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly Some references T. Bass, K. Davis, C. Grenoble, M. Stirbet: Standardization of CEBAF 12 GeV upgrade cavity testing, In: IPAC2012, New Orleans, USA, http://epaper.kek.jp/IPAC2012/papers/weppc088.pdf P. Kneisel, M. Stirbet, T. Powers, R.A. Rimmer, L.Turlington, B. Clemens, G. Slack: Performance of 650 MHz Single Cell Cavities Made From Various Types of Niobium, JLAB TN-14-018 O. Brunner, A. Butterworth, G. Cavallari, N. Hilleret, J. Jimenez, J. Tuckmantel: First experience with in situ Helium processing of the LEP superconducting modulesin: SRF 1997, Abano Terme, Padova, Italy, https://accelconf.web.cern.ch/accelconf/SRF97/papers/srf97a14.pdf C.E. Reece, M. Drury, M.G. Rao, V. Nguyen-Tuong: Improvements of the operational performance of SRF cavities via in situ Helium processing and waveguide vacuum processing,, PAC1997 Vancouver, BC, Canada, http://epaper.kek.jp/pac97/papers/pdf/3P034.PDF J. Mammosser, S. Ahmed, K. Macha, J. Upadhyay, M. Nikolic, S. Popovic, L. Vuskovic: Large-Volume resonant microwave discharge for plasma cleaning of a CEBAF 5-cell SRF cavity, IPAC2012, New Orleans, USA, http://accelconf.web.cern.ch/accelconf/ipac2012/papers/weppr094.pdf J. Mammosser: Spallation Neutron Source Status and upgrade plans, SRF 2009, Berlin, Germany, http://accelconf.web.cern.ch/AccelConf/srf2009/papers/moodau01.pdf (reporting on plasma cleaning) M. Doleans et al: Plasma processing R&D for the SNS superconducting LINAC RF cavities, SRF2013, Paris, France, http://ipnwww.in2p3.fr/srf2013/papers/tup057.pdf TTC Topical Workshop on SRF Cryomodule Cleanroom Assembly 12-14 Nov 2014 CEA Saclay, France M. Stirbet 4