NWE Day-Ahead Price Coupling

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
SWE IG Meeting Paris, CRE XBID Overview Supported by.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
FUI Feedback on PCG Target Model and roadmap propositions FUI Stakeholder Group Meeting Paris, 4 th November 2009 These comments reflect the general views.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
on Congestion Management (IG)
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting March 28 th 2012 Amsterdam Joint Presentation from TSOs and PXs.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
PCR Status report AESAG, September Supported by:
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Gas Regional Initiative South South-East
GRI SSE Work Plan Project proposal of HEA
NWE Day-Ahead Price Coupling
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Status of Implementation of PCR for Day-Ahead Price Coupling
Public Consultation : main conclusions (1/2)
Supported by: PCR Status report AESAG, September
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
NWE Day-ahead price coupling project Cost Issue
Content of Tender Dossier Instructions to Tenderers
SWE Day- Ahead market coupling
GRI-S : Infrastructures The Union list of projects of common interest
INTERCONNECTION GUIDELINES
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
Continuous Cross-Border Implicit Intraday Trade Status update
Third package December,
Implementation of Connection Network Codes The French process
IG meeting, December 5th, 2012, DERA premises, Copenhagen
ERGEG GRI South South East – , Maribor
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Trans European Replacement Reserve Exchange
Background Legal basis of the TA financing decision: Article 45 of Council Regulation (EC) No. 1083/2006 of 11 July 2006 laying down general provisions.
Supported by: PCR Status report AESAG, September
Implementation of Connection Network Codes The French process
Sub-Regional Meeting for ASEAN Countries on the Marrakesh Treaty and the Production and Exchange of Accessible Books by the World Intellectual Property.
GRI SSE Work Plan Project proposal of HEA
Institutional changes The role of Bilateral Oversight Boards
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Helene Skikos DG Education and Culture
Gas Regional Initiative South South-East
Outline Background: development of the Commission’s position
XBID Overview ERI SWE region Madrid Supported by.
Contractual and Regulatory Framework
Gas Regional Initiative South South-East
Presentation transcript:

NWE Day-Ahead Price Coupling Joint Presentation from TSOs and PXs from the NWE Region NWE Day-Ahead Price Coupling IG meeting May 9th 2012 Copenhagen

Content Status on the APCA/ Comfort letter Joint Project Organisation Regulator Questions from last IG meeting

All Party Cooperation Agreement (APCA) The APCA for design and implementation is a framework agreement, with annexes setting out e.g. governing principles, budget, cost sharing, plan, decision making process and high level principles for operation of market coupling The agreement is negotiated by the NWE PXs and TSOs, and is expected to be ready for signature before Florence forum (22. and 23. May) TSOs have stated need for comfort that NWE related costs will be accepted by the NRAs prior to signing or entry into force of the APCA

The Comfort Letter The purpose of the comfort letter is to deliver sufficient information to enable the lead NRAs of the NWE project to facilitate issuing of a comfort letter, and thereby to facilitate signing of the cooperation agreement between the TSOs and PXs in May, in order to safeguard expedient and timely delivery of the project. Information provided in the letter is, governance and cooperation principles, cost sharing and cost recovery principles, budget, algorithm requirements and high level price coupling governance principles

Joint Project Organisation (1/2) NWE JSC Joint PMO (Consultant: E-Bridge ) Technical WG Corne Meeuwis Legal, Regulatory and Market WG Tjitske Kramer Procedures TF External Communication & Markets TF Testing TF Regulatory TF TSO-only Sub-Project PX-only Sub-Project Local Sub-Projects Capacity TF Legal & Contracts TF Algorithm TF Shipping Financial TF Shipping TF Reporting GB Shipping Sub task ITVC Shipping Sub task

Joint Project Organisation (2/2) NWE JSC (TSOs and PXs) This function is acting as a Board, making major decisions and safeguarding timely completion of the NWE project. Working Groups (chairs: Corné Meeuwis and Tjitske Kramer) 2 main WGs, one technical (Corné) and one legal and regulatory (Tjitske). The WG chairs are with the support of the PMO, responsible for progress and are reporting to JSC. PMO (E-Bridge) This function is facilitating the work in the joint project, acting as “secretary general”. Task Forces Representation of all parties, or 3-4 specialists and reading members (1 per party).

NRA questions from last IG meeting Question: NRAs request more detailed information on budget. Preferably, this should be sent together with TSOs’/PXs’ request for regulatory approval of sharing arrangements and validation of common and local costs Answer: A comfort letter is prepared, and are ready to be forwarded, with the required information on the budget.

Answer to NRA Budget request 1/2 Preliminary budgets for design and implementation comprise: Combined NWE PX costs of €10.3m €3.3m (60%) of PCR Common Costs (commonly procured services: project manager, taskforce leaders, algorithm and system development) €7m of local costs (support to PCR/NWE project plus PX-specific changes) NWE Common Costs of €0.8m, excluding shipping implementation costs (project office, taskforce leaders) Project Management Office (PMO) costs amount €0.37m WG leaders are paid as PXs-only respectively TSOs-only, and therefore not part of the common costs. The budgets assume a go-live at the end of December of NWE Market Coupling based on the PCR/PMB solution. The budgets will be finalised as part of the APCA completion process during early May. Any change to this plan and possible budget changes are subject to JSC approval.

Answer to NRA Budget request 2/2 In this overview, the shading indicates:

NRA questions from last IG meeting Questions: NRAs request to provide a proposal for cost sharing between NWE and non-NWE countries Answer: The NWE TSOs and PXs will, provided regulatory approval, pay their share (60 %) of the PCR costs. The NWE parties will also pay NWE related cost. The non-NWE TSOs and PXs should pay 40 % of the PCR costs and all non- NWE related costs. The APCA facilitates geographical extension of the price coupling, new PXs and TSOs shall pay for regional adaptation provided they have special needs.

NRA questions from last IG meeting Questions: NRAs request a clear proposal on high level flexible high-level interim governance arrangements for the NWE project. Answer: The APCA includes an annex (NR. 6: Price Coupling governance principles) with the high level governance arrangements. The governance arrangements are also described in the comfort letter. The Parties acknowledge that currently Governance Guidelines are being drafted and negotiated with the European authorities. Such legislation under development may affect the cooperation under this NWE APCA, and this is reflected in the APCA. The parties do not see any particular challenges in this respect.

Answer to NRA request for proposal on governance arrangements (APCA Annex Nr. 6) Capacity allocation is a TSO responsibility, pursuant to the provisions of Directive 2009/72/EC of 13 July 2009 concerning common rules for the internal market in electricity, and of Regulation (EC) No 714/2009 of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity. PXs are responsible for operating their respective markets (including price formation), under various contractual and/or regulatory arrangements. The nature of capacity allocation is that of a monopolistic function, the TSOs are regulated entities, and therefore the TSOs need at all times to be in a position to have sufficient comfort on compliance, in particular on the cooperation between the PXs (of the NWE Region or broader in PCR as the case may be), to achieve the Enduring Solution with the following criteria (the “Compliance”): 1. Competition law compliance 2. Geographical expansion of Price Coupling 3. PCR Solution for NWE 4. Cost efficiency 5. PXs’ role of operators