EUROCONTROL SURVEILLANCE STRATEGY

Slides:



Advertisements
Similar presentations
1 PRESENT USE AND PERSPECTIVE FOR CIVIL PRIMARY SURVEILLANCE RADAR IN EUROPE Eurocontrol, C. Pelmoine, Spectrum Management Domain.
Advertisements

REQUIRED SURVEILLANCE PERFORMANCE (RSP) By: M. Paydar March 2007
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
Sustainable Energy – Sustainable ATC Surveillance Workshop – Eurocontrol, Brussels, April 2010 Agenda Item Wind Turbine Interference – Possible Mitigations.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
CNS/ATM SG #42 ADS-B - CASCADE Presentation Material Cologne, 15 October 2008 Jörg Steinleitner, CASCADE Infrastructure WP Lead.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
SESAR and ASAS Opportunity
Sense & Avoid for UAV Systems
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
Workshop on preparations for ANConf/12 − ASBU methodology
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
1SWIM-SUIT Public Launch – 23 April 2007 System Wide Information Management in OATA Bert Nijhof OATA Technical Manager EUROCONTROL DAS/SAS/OCA.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
Prof. dr. sc. Ivan Markežić
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Airbus Status on ADS-B In / Out Update
Discussions Summary ASSTAR - Crossing & Passing session.
The European Organisation for the Safety of Air Navigation SES Implementing rules on surveillance EBAA, CNS/ATM AG 6, Brussels. 17 th November 2010 Presented.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
Impact of the IT Revolution on the Airspace System Dr. Philip Carrigan Strategic Programs Air Traffic Management Systems.
ASAS-GN Rome November 2008 Alex Wandels, CASCADE Programme Manager.
Aviation System Block Upgrades and NAV CANADA Planning
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
The Right Radar Backup for ADS-B
SIP/2012/ASBU/Nairobi-WP/19
Technology Roadmaps H. Sudarshan
Project conclusions and recommendations Thierry Arino (Sofréavia)
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Summary of the results of discussions in the aviation panel
Workshop on preparations for ANConf/12 − ASBU methodology
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Technology Roadmaps H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO AMCP WG-M/1 meeting, December 2000
Communications Operating Concept & Requirements (COCR)
LSSIP Objective AOP04.1.
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Soren Dissing - EUROCONTROL
Workshop on preparations for ANConf/12 − ASBU methodology
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

EUROCONTROL SURVEILLANCE STRATEGY Lecture 7. MSSR EUROCONTROL SURVEILLANCE STRATEGY

ATM Ground Based Surveillance Non-Cooperative Independent Surveillance: Calculates the (2D) position without reliance on aircraft avionics Primary Surveillance Radar (PSR) Cooperative Independent Surveillance: Provides the calculated aircraft 3D position and processes other aircraft avionic data (Mode A/C/S, DAPs or ADD) (Monopulse) Secondary Surveillance Radar (SSR), SSR Mode S, Airport Multilateration (MLAT) and Wide Area Multilateration (WAM) Cooperative Dependent Surveillance: Provides the aircraft derived position (GPS or INS) and other aircraft avionic data (including ADD) to broadcast “air-ground” and “air-air” ADS-B, (ADS-C)

Surveillance Strategy 3 pillars of mutually interoperable and compatible technologies Primary Radar MSSR SSR Mode S ADS-B MLAT WAM Surveillance Data processing systems

Surveillance Choice The Surveillance Strategy for ECAC does not mandate the implementation of any specific surveillance technology or technique, but leaves the choice of ground based surveillance systems to the (ANSP) surveillance provider, depending on: Operational Requirements Safety assessment The business case (geography, cost, topology, preference, integration risk, redundancy, integrity, etc). PSR is required in TMAs to cater for failed avionics in a critical phase of flight.

Primary Surveillance Radar Primary Surveillance Radars are expensive, high powered and spectrum inefficient The maintenance and support lifecycle cost are high Some European Air Navigation Service Providers are considering not replacing primary radar in the future However, PSR is a safety net in TMA EUROCONTROL is investigating the possibility of a more cost effective alternative solution for Primary Surveillance Radar

TMA / En-Route Ground Based Surveillance For safety or security reasons, Non-Cooperative Independent Surveillance as implemented, if required: PSR “Multi-Static PSR” (MSPSR) - Available - R&D required Until 2020+, at least one layer of ATM ground surveillance should be an co-operative independent surveillance to meet safety requirements: Layer 1 Layer 2 Status: MSSR/SSR Mode S - Operational WAM MSSR/SSR Mode S - Operational ADS-B MSSR/SSR Mode S - Planned ADS-B WAM - Foreseen

Airports Ground Based Surveillance For safety reasons, Non-cooperative Independent Surveillance is implemented, as required: SMR - Available at most airports To provide an Airport Situation Picture, including identification of aircraft and vehicles, a cooperative independent surveillance is required, that also supports the implementation of higher A-SMGCS levels. Status: Airport Surveillance Multilateration (MLAT) - Operational at many major European airport ADS-B - Planned at secondary airports TIS-B - TIS-B or equivalent required for highest levels of A-SMGCS. Not yet implemented.

SESAR - Surveillance Systems Some other Surveillance Systems identified by SESAR: Weather Radar Ground Based Airborne Wake Vortex detection Special surveillance systems Debris detection Low Power SSR (Mode S) Transponder NOT currently included in the SUR Strategy

Wide Area Multilateration (WAM) Some WAM systems already in operational use, however Standards not yet generally available. ICAO ASP working to “recognise” WAM in ICAO Docs. EUROCAE WG 70 “WAM MOPS” due mid 2008. Certification based on comparison with the SSR Standards; shows performance equal to or better than SSR. Generic Safety Statement, available end 2007. Guidelines for Approval/Certification due early 2008.

ADS-B Out ADS-B NRA (SPR/Interop) developed by RFG. ADS-B RAD due mid 2008 ADS-B APT and ADS-B SURF due mid 2009 1090ES transponder numbers increasing in European airspace. However, currently there are some issues that require attention There is no mandate yet for the carriage of 1090 ES No certification yet, NRA due end 2007 (Certification generally 1yr after Standards available) The aircraft avionic position potentially needs to be verified by an independent means of surveillance (results from safety work) Combination of ADS-B/WAM likely future surveillance scenario

ATSA VSA and ATSA ITP standards due mid 2008 ADS-B In ADS-B “in” is required for ATSA and ASAS applications, these will become more and more important ATSA VSA and ATSA ITP standards due mid 2008 ATSA AIRB standards due 2009 Other ATSA and ASAS standards (SPR + Interop) will come later.