Status and Plan of GDE Design Work (Including Road Map for RDR)

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
ILC Accelerator School Kyungpook National University
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
Global Design Effort Dubna, 5 June 2008 Part I of Summary for WG C/D Conveners: Ewan Paterson (SLAC), Nikolay Solyak (FNAL), Andrei Seryi (SLAC), Masao.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
ILC damping ring options and their critical issues 12th July th ACFA MDI/POL/ACC Pohang Accelerator Lab. Eun-San Kim.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
ILCDR'07, 5-7 March, INFN-LNF, Frascati, Italy ILC Damping Rings Technical and Organizational Status Andy Wolski University of Liverpool and the Cockcroft.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
S. Guiducci WG3b - Damping ring size and layout. DR configuration recommendation Circumference and layout ~ 17 km dogbone 3 km or 6 km ring Single rings.
Ring to Main Linac (RTML): Status and Plans ILC January Meeting (KEK) Peter Tenenbaum 19-Jan-2006.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
7 November 2006 Valencia Global Design Effort 1 Damping Ring Susanna Guiducci INFN-LNF for Jie Gao (IHEP), Andrzej Wolski (Cockcroft Institute) and Mike.
Design of a one-stage bunch compressor for ILC PAL June Eun-San Kim.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1-2 May 2006 LCFOA Mtg Global Design Effort 1 The Baseline Configuration and the Reference Design Report Tor Raubenheimer SLAC.
ILC Damping Rings: Configuration Status and R&D Plans Andy Wolski Lawrence Berkeley National Laboratory January 19, 2006.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
ALCW at SLAC, January 7, 2004J. Rogers, Novel Schemes for Damping Rings1 Novel Schemes for Damping Rings J. Rogers Cornell University Improving dynamic.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
ILC DR Lower Horizontal Emittance, preliminary study
ILC - Upgrades Nick Walker – 100th meeting
SC Quadrupole Magnets in ILC Cryomodules
CLIC Damping ring beam transfer systems
Linac possibilities for a Super-B
AD & I : BDS Lattice Design Changes
Accelerator Physics Technical System Group Review
ILC Global Design Effort
Bunch Separation with RF Deflectors
Barry Barish GDE Caltech
Progress activities in short bunch compressors
Electron Source Configuration
CEPC Injector Damping Ring
ILC 3.2 km DR design based on FODO lattice (DMC3)
K. Yokoya KEK For RDR Management Board
ILC 3.2 km DR design based on FODO lattice (DMC3)
Session Introduction & Damping Rings Baseline Lattice Decision
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

Status and Plan of GDE Design Work (Including Road Map for RDR) Feb. 17 2006 PAL Eun-San Kim

ILC Meetings Snowmass, Colorado, 14-17 Aug. 2005 : Started BCD European GDE meeting, Oxford, 25 Oct. 2005 Damping ring workshop, CERN, 9-11 Nov. 2005 GDE meeting, Frascati, Italy 7-9 Dec. 2005 : Decided BCD 1st Area System meeting, KEK, 19-20 Jan. 2006 : Discussed machine layout and boundary between area systems Lattice design meeting, CERN, 6-8 Feb. 2006 2nd Area System meeting, FNAL, 13-14 Feb. 2006 GDE meeting, Bangalore, 9-11 March 2006 3rd Area system meeting, DESY, April 2006 GDE meeting, Vancouver, 19-23 July 2006 GDE meeting, Valencia, Autumn 2006

Frascati GDE Meeting Discussed progress since Snowmass Finally agreed BCD to be documented. - includes baseline and alternative designs Organized the GDE group for RDR in 2006 Final BCD becomes property of CCB in early 2006

Frascati GDE Meeting BCD layout IP Working Group for BCD WG1 : LET beam dynamics WG2 : Main Linac WG3a : Sources WG3b : Damping Rings WG4 : Beam Delivery WG5 : SCRF Cavity IP

Frascati GDE Meeting Matrix group for RDR C. Adolphsen H. Hayano L. Lilje N. Solyak J. Gao S. Guiducci A. Wolski D. A-K A. Seryi H. Yamamoto M. Kuriki J. Sheppard E.-S. Kim P. Tenenbaum A. Brachmann Area system is geographical breakdown of machine for design and cost estimation A. Brachmann

1st Area system meeting Baseline Layout (500 GeV) 1st stage - 1st stage : 500 GeV - 2nd stage : 1 TeV ; Moving of turn-around and BC No moving of DR

Electron source in BCD laser 120 keV DC Gun 70-100 MeV 400 MeV SC Linac Eacc = 17.8 MV/m NC pre-accelerator diagnostic section NC SHB+solenoid 70-100 MeV

Positron source in BCD To IP Undulator ~100m e- Accelerating structure To DR Ti Alloy target 150 GeV e- Ti Alloy Target

Damping Ring in BCD Baseline e+ : two 6 km rings Alternative e- : one 6 km ring Alternative e+ : 6 km, 17 km OCS Baseline

DR Tasks List for RDR Lattice design - 6 km e-/e+ rings : L. Emery, A. Xiao, E-S Kim, Y. Sun - 17 km e-/e+ rings : Y. Cai, Y. Yan - Injection and extraction lines : A. Wolski Acceptance : Y. Cai, Y. Yan, A.Wolski Low-emittance tuning : J. Jones Impedance : M. Venturini, K. Bane, S. Heifets, etc Electron-cloud : M. Pivi, C. Celata, K. Ohmi etc.

DR Tasks List for RDR Ion-effects Other collective effects : L. Wang, E-S Kim, K. Ohmi, M. Venturini, G. Xia Other collective effects : S. Mtingwa, M. Venturini, S. Santis, A. Wolski Injection/extraction kickers : pulser : J. Urakawa, T. Naito, M. Ross, A. Krasnykh, etc Injection/extraction kickers : striplines : A. Krasnykh, S. Santis, D. Alesini, F. Marcellini

Baseline Damping Ring Circumference 6.6 km Energy 5 GeV RF frequency 650 MHz Harmonic number 14402 Damping time < 25 ms (e+) < 50 ms (e-) Emittance 5 mm Bunch length 6 mm Energy spread < 0.13 % Momentum compaction 4x10-4 Damping wiggler peak field 1.6 T Damping wiggler period 0.4 m Energy acceptance < 0.5 % Dynamic aperture Ax+Ay < 0.09 m-rad Baseline configuration lattice Specifications

Baseline Damping Ring Bunch filling patterns for e-

Fast-ion effects in Baseline Damping Ring 650 MHz, 5400 bunch Beam size Sqrt(Jy) per 50 turns 50 turns

Lattice Design of Electron damping ring One straight section One Arc and Wiggler section A lattice with low average beta-functions to reduce the effects of fast-ion. Tele-conference for e- DR lattice will be at the beginning of March.

Ring to Main Linac (RTML) Status and Plans Started works for shorter bunch compressor and turn-around optics Contacted leaders of all technical and global systems Milestone - Review RTML design and place lattices and documentation under change control in April 2006

Ring to Main Linac (RTML) RTML Layout Turn around eny = 0.02 mm, 3.2 nC, sz = 6mm Total 2.5 km Bunch compressor sz = 0.15 mm SR BC 1 BC 2

Ring to Main Linac (RTML) Bunch compressor Alternative Baseline Chicane 68.4 m 480 m Matching 4 m 310 m Number of RF cavity 452 488 Total length 680 m 1400 m Alternative Baseline Required bunch length achieved System length shorter longer Tolerence of emittance acceptable comparable BCD alternative baseline GDE Requirement correction of vertical dispersion shorten system length

Ring to Main Linac (RTML) Bunch compressor Each BC in baseline has 240 meters of bend magnets arranged in chicanes : Long ! Considering two approaches to reduce length Enhancing R56 by forcing nonzero dispersion at Qs Replacing wiggler with 4-bend chicane with optimized lattice functions for emittance preservation

Main Linac in BCD Baseline in 1st stage - TESLA cavity type - Operation gradient = 31.5 MV/m, Qo=1010 Baseline in 2nd stage - LL or RE cavity type - Operation gradient = 36 MV/m, Qo=1010 - Total length = 41 km Alternative in 1st stage - LL or RE cavity type - Operation gradient = 36 MV/m Linac RF basic unit - 1 modulator, 1 klystron, 3 cryomodules, 27 cavities

Beam Delivery System in BCD Baseline : - 2 IPs for 2 mrad and 20 mard - 150 m longitudinal separation between 2 IPs Alternative : - 1 IP 2 Interaction Point

Summary Bangalore GDE meeting - starting for estimation of costs RDR will be finished in Dec. 2006 - RDR is not complete technical design, but is a design to estimate reliable cost. TDR will be completed in Dec. 2008.