PPM-DOM. SPM DOM LCM SS-part ILxx

Slides:



Advertisements
Similar presentations
SWITCHES, FUSES, & CIRCUIT BREAKERS
Advertisements

Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Industrial Machine Control
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
KM3NeTmeeting Pylos, Greece, April of 12 Mar van der Hoek et al. electronic department PROGRESS ON OPTICAL MODULATORS FOR KM3NeT Mar van der.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
Amsterdam 29 March 2011 Fernando Urbano IFIC (CSIC – Universidad de Valencia) KM3NeT Optical Calibration Laser Beacon and Nanobeacon Status.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
Electronic department Photonics-oriented data transmission network for the KM3NeT prototype detector Jelle Hogenbirk, Nikhef )* On behalf of the KM3NeT.
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Balance of Systems (BOS)
Shore Station1 EFNI H K Shore Station Block diagram Form factor Power setup Special for BARI Special for MILOM Planning Outcome of brainstorm.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
MPPC Test Setup Alam Toro S. 1. Objective Characterize main variables in ideal conditions To provide a setup to characterize multiple devices To provide.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
VEOC Vertical Electro – Optical Cable and BEOC Breakout Electro – Optical Cable 1 Development Status F19 F18 F1 F20 S2 S1 B KM3NeT General meeting Jelle.
Optical performance measurements of various fibre connections
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Progress on the Vertical Electro- Optical Cable P.Kooijman UU/UVA/Nikhef.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Global overview of the Optical Network for KM3Net Phase 1 Sander Mos KM3NeT Collaboration Meeting 30 January 2013 Marseille.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
DOM assembly KM3NeT collaboration meeting Assembly Edward Berbee The cooling mushroom is put in place with tooling, a minimum amount of.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Update on general technology From DOM electronics to KM3NeT subsea infra structure Interaction with other scientific projects Interaction with industries.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
Organizing future KM3NeT production 06-July-2010.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
Dom mechanics.. Earlier design; Reflector-ring mounted to the Pmt before the assembly of the complete Pmt foam-support. The support was made of milled.
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
Electronic department 5/7 July 2010, KM3NeT meeting at Nikhef - Mar van der Hoek et.al. Status and experiences with oil-filled Pressure Balanced backbone.
DU power Principle diagram OM inventory Conversions VEOC behavior DU to network Pending issues mPMT-Bar.
Multi-PMT DOM P.Kooijman University of Amsterdam-GRAPPA Presentation for SSC.
Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS.
Status Optical System KM3NeT
Deep-sea neutrino telescopes
DAQ read out system Status Report
On behalf of Patrick Lamare
Write-up and Definitions for Cost Model
Detector building Notes of our discussion
Concluding remarks E. Migneco
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
Els de Wolf 20 February 2012, Catania
SciFi option for neutrino target tracker
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Junction Boxes for KM3NeT
Point-to-point connection between each DOM and the shore station
Nanobeacon: A low cost calibration instrument for KM3NeT
Presentation transcript:

PPM-DOM. SPM DOM LCM SS-part ILxx by Jan-Willem Schmelling on behalf of the optical team. 40 km SS-part MODU-LATORS REAM 1λ CW+1λ AC @1.25Gbps) 2xCu 50/50 DOM APD 2 Lasers tunable PIN VOA C1 LiNbO3 Junction Box λ4 λ5 SPM Antares DWDM crate 80/20 C2 LCM ILxx on/off 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

Contents. An overview of the items showed during the DOM-ReX related to optics and integration. Optical network. BEOC DOM integration General conslusions Questions? 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

Contents. http://131.188.192.25/MaKaC/conferenceDisplay.py?c onfId=123 For more information and the detailed presentations as given during the DOM-ReX meeting on the 18th of December 2012 at Nikhef see: http://131.188.192.25/MaKaC/conferenceDisplay.py?c onfId=123 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

Optical network. Downstream path (shore to DOM) λ1 2 Lasers tunable λ1 MOD + Drivers 1λ CW+1λ AC @1.25Gbps) λ5 LiNbO3 EDFA D1 D2 50/50 A1 λ4 A&D λ8 λ8 14 80/20 20 λ5 PIN LiNbO3 VOA on/off Antares DWDM crate SCM C2 λ4 REAM C1 Junction Box 2xCu λ1 DOM λ1 λ5 APD 6dB C2 A2 D4 D3 20/80 λ5 λ4 LCM SS-part λ8 λ8 EDFA 40 km ILxx Downstream path (shore to DOM) Time calibration: round trip Upstream path (DOM to shore) 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

Optical network. Time calibration: optical pulse > Lab test: SCM λ1 2 Lasers tunable λ1 MOD + Drivers 1λ CW+1λ AC @1.25Gbps) λ5 LiNbO3 EDFA D1 D2 50/50 A1 λ4 A&D λ8 80/20 λ8 λ5 PIN LiNbO3 VOA on/off Antares DWDM crate SCM C2 λ4 REAM C1 Junction Box 2xCu DOM λ1 λ1 λ5 APD 6dB C2 D3 A2 D4 20/80 λ5 λ4 SS-part λ8 λ8 LCM EDFA 40 km ILxx Time calibration: optical pulse > Lab test: 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

Lab test of optical time calibration. During lab test it has shown that the optical time calibration: In principle works very well! Is sensitive for reflections (for example wet mateable connectors). Has a low average optical power (small pulse width). Components show un-expected behavior (reflections). A long fiber length can measure temperature very accurately.  29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

BEOC. 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

BEOC. Dry mateable connector to LCM 2 electrical wires (1 x power) 2 fibres BendBright Penetrator into Optical Module 6 electrical wires (1xpower, 2xUTP) 2 fibres BendBright C2 1.20m 1m DC/DC C1 Dry mateable bulkhead to a satelite 4 electrical wires (2xUTP) PBOF = Pressure Balanced Oil Filled over pressure test 60 kPa 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

BEOC: Penetrator gluing of the pressure barrier 2 Fibres 2 Fibres in tube First attempt Tight buffered fibres (SEACON standard type of fibre) are very fragile when stripped down and glued. This is caused by scratches due to mechanical stripping of the tight buffer. Solution: use 2 BendBright fibres. The coating can be chemically stripped so there is minimal damage to the fibre. 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

Problems with breakout Box (BOB). Gluing of the tubes to the BOB was not easy. Both the BOB and tubes are made from polyethylene (PE). This is very hard to glue. First attempt with primer and “one second” glue. This failed a dry pressure test at 3 bar. Adding extra glue did not make it leak tight. 3M DP8010 2-component glue did work very good. Despite the strange appearance on the outside. Close up of glue connection with “one second” glue. Final BOB. Glued with 3M DP8010 2-component glue 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

The completed BEOC. 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

BEOC connected to the DOM. 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

BEOC: Main problems encountered After the DOM had been closed the fast fuse inside the BEOC DC/DC converter blew during tests. This resulted in: The BOB had to be drained of oil and opened. The fuse is now short circuited by a wire to prevent this from happening in the future. Because the 400V supply from the SPM itself has a limiter, shorting of the fuse should no problem in-situ. 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

DOM electronics integration. Integration of the electronics: Various problems due to mechanical misalignment. Power board: no problems CLB: various mounting problems for different reasons. CLB is important ref. FPGA: cooling major issue, problem to produce a good thermal contact. Instrumentation: positioning /mounting needs improvement Octopus board: sliding parts causing a short circuit. PMT numbering: a consistent way throughout the collaboration is needed. 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

DOM optics integration. Integration of the optics inside the DOM: PIN diode fiber: too close to heat shield REAM: mounting no problem Fiber routing inside the DOM: more support Penetrator connection: troublesome as a result of the assembly order. Penetrator fixed to the glass at the last possible moment, risk of damage during handling/DOM test. 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

Optical parts integration in LCM. EDFA’s mounted on cooling plate, together with a part of the optics 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

Optical parts integration in LCM. 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

DOM integration @ CPPM. Shore station equipment: Build and/or bought Shore station lasers Shore station modulators Shore station receiver (ordered) Shore station receiver (build) as backup Shore station optical timing switch crate The shore station 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

DOM integration @ CPPM, results. Normal communication no problem. Problems with optical timing calibration. Optical margin NOT sufficient for time calibration, receiver sensitivity low. EDFA slow control not available (would provide more flexibility). Shore station receiver. The DOM is alive!  29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

General conclusions: There’s also still a lot to be done! Optical network is working. However little has been learned for KM3NeT phase 1. The DOM integration was successful. Optical time calibration needs a different/modified approach compared to the lab as it worked in the lab setup, but not in-situ. During DOM/BEOC assembly a lot of mechanical inconsistencies showed up. Designs are different from KM3NeT phase-1 The mezzanine board approach works very well in a prototype manner. The electronics are well tested but their mounting needs to be improved Bottom line: we have learned a lot We have realized a lot but…….. There’s also still a lot to be done! 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

http://131.188.192.25/MaKaC/conferenceDisplay.py?c onfId=123 A more detailed overview of the PPM-DOM can be found on: http://131.188.192.25/MaKaC/conferenceDisplay.py?c onfId=123 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille

The END. Questions? 29-31 of January 2013 PPM-DOM for KM3NeT Collaboration meeting Marseille