Magnetic Measurements For The LCLS Undulator System

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Alexander Temnykh Cornell University, Ithaca NY, USA
Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
LCLS Prototype Undulator Design LCLS Prototype Undulator Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Moving Wire, Pulsed Wire and Long Coil Measurements on the SSRL Beam Line 5 EPU Scott Anderson SLAC Magnetic Measurements.
Magnetic Field optimization of EPU at TPS
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
In Vacuum Magnetic Field Measurement System for CPMU of HEPS-TF
LCLS Undulator Fiducialization
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
SCU Next Phase Meeting July 8, 2014.
Phase Adjustments: K vs
Beam-Based Alignment Results
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
Undulator Tuning Status
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator Tuning And Fiducialization
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Undulator Assembly and Installation Planning
Physics Requirements for Conventional Facilities
Undulator Alignment Plan
Alignment Diagnostic System Status
LCLS e- Beams Systems Manager
LCLS Undulator Magnetic Measurements
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

Magnetic Measurements For The LCLS Undulator System Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave Jensen

Introduction The LCLS will consist of 33 undulator segments. The last 1/3 of the linac is used to produce the electron beam. Some Parameters: Ebeam = 13.64 Gev λr = 1.5 Å Planar permanent magnet undulators Nd Fe B permanent magnets λu = 30 mm Gap = 6.8 mm Tapered gap, 4.5 mrad Bfirst = 1.249 T, tapered, nominal field, first undulator Kfirst = 3.5, tapered, each undulator has its own K 226 poles per segment Each segment is 3.4 m long

LCLS Location J. Galayda

Schedule A S O N D J F M A M J J A S O N D J F M A M J J 2006 2007 Drive-Laser Commissioning LTU/und. Install Drive-Laser Installed Controls Checkout LTU/und. hall “ready” First Spont. Light A S O N D J F M A M J J A S O N D J F M A M J J 2006 2007 2008 Gun/Inj./BC1 Install (8/21 – 2/20) Gun/Inj./BC1 Commissioning Inj./Linac/BC2 Commissioning linac/BC2 Install LTU/und. Commissioning Dave Schultz

Magnetic Measurement Facility Undulator Tuning Magnetic Measurement Facility

Magnetic Measurement Facility Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical LCLS-TN-04-1

Undulator Movements In MMF Tuning Time: about 4 weeks 1 Week, Fine Tuning 1 Week, Rough Tuning 1 Week, Come to 20 C <1 Week, Finish Fiducialization Peak Throughput: 1 undulator per week

MMF Temperature Achim Weidemann Time history at the Kugler bench In general, the system meets stability requirements

Rough Tuning Bench Components

Rough Tuning Bench Reference Pole Undulator Cam Movers Zero Gauss Chamber Cable Handling Bench

Capacitive Sensor Alignment Performance Undulator mechanically aligned to bench in 15 minutes Yurii Levashov

Scans Begin And End In A Zero Gauss Chamber Beginning zero field measurement Ending zero field measurement Senis Hall probe Zero Offset Correction Assume linear offset dependence on time

Gap Shims Tapered Shim ANL TB-48

Isaac Vasserman’s Ideas X Trajectory Shims Isaac Vasserman’s Ideas ANL/APS/TB-48 ANL/APS/TB-48 Apply shims to top and bottom poles Shims weaken By, don’t cause Bx Can’t strengthen pole, instead place shims on next pole to reduce deflection in other direction Developed software to automate shim placement LCLS-TN-04-7

Y Trajectory Shims Yurii Levashov Bx Shim New Design Smaller external fields Uniform Bx field in gap Old Shim Design Inconel Steel Spot weld Yurii Levashov

Straighten X And Y Trajectories Measured X Trajectory Calculate Shims Modeled X Traj With Calc Shims Measured X Traj After Calc Shims Applied The Shimming Is Automated

Phase Shims Measure By with a Hall probe Calculate phase error LCLS-TN-04-7 ANL/APS/TB-48 Measure By with a Hall probe Calculate phase error Calculate shims to correct error Apply shims, repeat Developed software to automate shim placement We don’t have shims to strengthen a magnet, only weaken Must locally reduce the gap to increase phase shift

Rough Tuning Test Plan Achim Weidemann 1) Place undulator Use kinematic mount 2) Mechanically align to test stand Optical alignment check, use capacitive sensors and cam movers 3) Magnetically align Hall probe to undulator Move Hall probe in x and y to magnetic center 4) Rough tuning Tune x and y trajectories, anticipate magnetic shield 5) Adjust gap Measure K, adjust gap to set K to required value for that undulator 6) Check alignment Alignment may have changed from gap adjustment 7) Rough tuning Anticipate magnetic shield 8) Add magnetic shield 9) Check tuning

Each Undulator Has Its Own K Value From Heinz-Dieter Nuhn

Fine Tuning Bench Components

Fine Tuning Bench Undulator With Magnetic Shield Cable Handling Cam Movers Kugler Bench Steel Girder And Stands

Kugler Bench Performance Measurements by Georg Gassner X Y straightness spec: < 14 μm Pitch and yaw spec: < 4.2 μrad Specs met in long block region

Coils For Fine Tuning Bench Bx, By One Undulator Period Long Coils Short Coil Zero Gauss Chamber I1 I2 Field Integral Coil Dave Jensen

Fine Tuning Test Plan Yurii Levashov 1) Place undulator Use kinematic mount, use steel girder and stands, shield on 2) Mechanically align to test stand Optical alignment check, use capacitive sensors and cam movers 3) Magnetically align Hall probe to undulator Move Hall probe in x and y to magnetic center 4) Determine the tuning axis Move in x to where K has the required value 5) Tuning Tune x and y trajectories, phase 6) Add phase matching shims 7) Adjust field integrals Use long coil, I1 and I2 for both Bx and By 8) Adjust field uniformity Add quadrupole and sextupole shims as necessary 9) Final checks before gluing shims Check x and y trajectory, phase, phase matching, field integrals, uniformity

Fine Tuning Test Plan (cont.) 10) Glue shims in place Remove y trajectory, quadrupole, sextupole, and phase shims, apply glue, replace 11) Check the gap Make sure no parts of a shim protrude into the gap 12) Check for errors while gluing shims Check x and y trajectories, phase, I1 and I2 of Bx and By, uniformity 13) Map Bx and By in the retracted position 14) Final results data set Measure Bx and By at x = -6, -5, …, 6 mm, y = -0.2, -0.08, 0 0.08, 0.2 mm, calculate field integrals vs z, 65 scans 15) Find the x position, y=0, where K has the required value 16) Add fiducialization magnets to both ends Measure offsets from beam axis to the center of the fiducialization magnets 17) Rough fiducialization using alignment equipment 18) Measure roll on flats at each undulator end 19) Move undulator to CMM, finish fiducialization

Fiducialization, Determine K vs X Set the probe position to give the nominal K value.

Fiducialization

Hall Probe Calibration Water NMR HP3458 Chiller For probe temperature Magnet Metrolab NMR Seva Kaplounenko

Schedule Robert Ruland

Quadrupole Fiducialization System LCLS-TN-05-11

Quadrupole Fiducialization Vibrating Wire Technique Move wire until the vibration stops: Quadrupole Center Force On Wire A. Temnykh, NIM A 399 (1997) 185.

Detector Signal vs Quad Position

Pitch and Yaw Measurements

Quadrupole Fiducialization Schematic System Overview Wire Vibration Sensor Wire Finder

Conclusion MMF construction is complete, temperature stability and set point accuracy requirements have been met The rough tuning bench is complete The Hall probe calibration system is complete The fine tuning bench has all components complete. A stage is being repaired for the long coil system. Afterward, the bench will be complete. The software is complete. Some automation work and improvements are still being done. Mechanical alignment takes about 15 minutes. The fine tuning bench construction meets all specifications. The expected throughput is one undulator per week. Each undulator, however, spends about 4 weeks in the MMF. One reference undulator gets re-measured every fourth undulator. We have begun production undulator tuning.