US1 AT CANAL STREET INTERSECTION DESIGN DEVELOPMENT

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Fort Drum Connector Project Route 11 Bridge Aesthetic Options.
Project State Road 434 Outfall Ditch to the Little Wekiva River
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
Insert project map NOTICE OF PUBLIC INFORMATION MEETING Florida Department of Transportation Project History The Florida Department of Transportation (FDOT),
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
U.S. 33 Northern Connector Alternative
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding  Fall Presented ‘gaps’ and possible project solutions to WHCA in.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
PUBLIC HEARING Draft Amendments FY 2011/12 – 2015/16 Transportation Improvement Program (TIP)
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
SEMINOLE COUNTY Financial Project IDs: & Public Meeting December 6, 2011 Presented By: Stephanie Ghezzi, PE.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
S.R. 520 (West Merritt Island Causeway) SR 520 (West Merritt Island Causeway) From West of Myrtice Avenue to S.R. 3 Courtenay Parkway FPID
ADA/504 Technical Assistance Tool Ken Woodruff, Civil Rights Program Manager, FHWA.
Rock Creek East II Livability Study April 28, 2016.
Surviving through Downtown Construction
WELCOME! Please sign-in at Front Desk and pick up a Project Brochure and Speaker Request Card Feel free to review project displays and discuss project.
Rock Creek East II Livability Study
View display boards and speak one-on-one with staff
Ashland Redevelopment Authority
Marina Vista Streetscape Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
District 3 Complete Streets Projects
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
Begin Project End Project Welcome to the SR 530/US 192 Highway Improvement Project Informational Meeting Thursday, February 8, 2007.
Request #2 Request #1 Segment built by LCPS.
2017 Florida Redevelopment Awards Capital Projects/Beautification
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Neighbourhood Traffic Calming Open House
NVTA Countywide Pedestrian Plan of July 2016
Signs, Signals, and Markings
Placemaking for Youth In the Cowichan Region.
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
Motor Row Streetscapes
Accessible shared streets
HRTPO Draft Public Participation Plan & Title VI & LEP Plan Update
S.R. 26 Road Rehabilitation in Clinton County
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Streetscape Water Street Gateway A Centretown Concept.
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Metropolitan District | mndot.gov
Streetscape Water Street Gateway A Centretown Concept.
Alex Henry FDOT District Seven Safety Office
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Land Use 101: The Design Process
Polk Transportation Planning Organization
Lines And Signs.
Module 6 A 21st Century Transportation Network
Presentation transcript:

US1 AT CANAL STREET INTERSECTION DESIGN DEVELOPMENT August 23, 2012 PRESENTATION Presented by: Project Landscape Architect Randy Raiman, RLA, ASLA HHI Design Toni Otti to make general introduction of the design team. Good evening and welcome to the Project Information Meeting for the aesthetic treatments for the US-1 at Canal Street Intersection Improvement project.  My name is Randy Raiman and I am the Landscape Archiect for the aesthetic improvements portion of the project.  In attendance with us tonight is Ms. Dennisse Zornan who is the Florida Department of Transportation's Project Manager as well as Mr. Rhet Schmidt who is the  Project Manager for Metric Engineering. The purpose of tonight’s public meeting is to share information about the proposed aesthetic concepts and to provide time to answer questions with interested parties. We will give a brief overview of the concepts and afterwards you are encouraged to view the exhibits and ask questions.  Additionally, we will provide an update on other ongoing community improvements that the City is implementing within the Waterfront Loop.

Title VI and Title VIII Compliance This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, And Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to compliance with Title VI and/or Title VIII may do so by contacting the following: Florida Equal Opportunity Office 605 Suwannee Street, Room 260 Mail Station 65 Tallahassee, FL 32399-0450 This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, And Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to compliance with Title VI and/or Title VIII may do so by contacting the following: Florida Equal Opportunity Office 605 Suwannee Street, Room 260 Mail Station 65 Tallahassee, FL 32399-0450

www.cflroads.com Many of you here this evening have been in attendance at the previous two public information meetings that were hosted by the Florida Department of Transportation.  As a brief update, the Design of the project is progressing and it is scheduled to be completed by the end of this year.  The project is currently not funded for R/W Acquisition or Construction.  For project information please visit www.cflroads.com. This website is the FDOT’s living platform to keep you and the public informed of on-going and future projects. I encourage you to visit this website which contains hot links for easy access to online information and to stay current with the status of the US 1 at Canal Street Intersection Improvement project.

Aesthetics The aesthetic treatments requested by the City of New Smyrna Beach include: Decorative mast arms Decorative sidewalks Streetscaping Design & construction of the aesthetic features are subject to FDOT District 5 approval The design of the aesthetic features has been funded by the City of New Smyrna Beach Funding for construction of these improvements is currently being sought Concepts for these aesthetic features will be presented this evening Since the onset of the project, the City has requested of the FDOT that aesthetic treatments such as a decorative sidewalks, mast arms and other streetscaping elements be provided as part of this project. The City and the Florida Department of Transportation have been working together to achieve this goal.  Since the last Public Meeting, the City has funded the design of the aesthetic improvements and coordination continues on the agreement to have them included into the construction phase of the project.

Intersection Hardscape Concept 1 The imagery on the following slides show design concepts for the intersection improvements.  Those of you that have attended previous meetings or have looked at the materials on the CFL Roads web site will notice that the Aesthetic Concept has changed for the project.  In our meetings with City staff we were asked to look into a concept that ties into the Waterfront Loop theme and provides a cohesive community identity.  As you will see, the concepts are strongly influenced by the wave forms found in the Waterfont Loop signage.  When implemented, these aesthetic treatments will enhance the pedestrian friendly environment in the intersection as well as tie together the streetscape elements that already exist on Canal Street.  The goal of this is to “bring” this important gateway and vital transportation node “into” the downtown area and incorporate it with the community’s vision. (Consider adding a discussion here on the decorative sidewalk “window pane” treatment here. The proposed intersection hardscape shown in concepts 1 through 3 will be installed using a colorizing material that will be applied to the roadway pavement.  The product will be a FDOT approved product for decorating asphalt that will meet stringent requirements on durability and skid resistance. The imagery on the following slides displays design concepts for the intersection hardscape, traffic signal/lighting footings and decorative mast arms which are components of the improvements currently being developed for the intersection of US1 and Canal Street in New Smyrna Beach. The theme for these concepts was inspired by wave forms found in the New Smyrna Beach Waterfont Wayfinding Signage shown. The designs for the traffic signal/lighting footings are also being developed to emulate the lighting and signal infrastructure found along historic Canal Street. The proposed intersection hardscape concepts 1-3 will be installed using an FDOT approved product for decorating asphalt. The colors chosen for the hardscape concepts were selected to emulate as closely as possible the colors found in the Waterfront Loop Wayfinding Signage. HARDSCAPE CONCEPT 1 In concept 1, the wave pattern occurs in the four corners of the intersection set in an arch which links the adjacent crosswalks and associated tactile warning pavement at the handicap ramps. This design provides clear definition to the pedestrian and motorist of where the pedestrian crossing areas are located.

Intersection Hardscape Concept 2 In concept 2, the wave pattern from the waterfront loop theme occurs within the pedestrian crosswalks only. This design provides a very clear definition of the pedestrian crossing areas and alerts motorists to the specific locations where pedestrians cross the intersection.

Intersection Hardscape Concept 3 In concept 3, the wave pattern is located at the intersection corners and creates a bold graphic pattern by using the wave in a circular motif. This concept defines the intersection corners and is coupled with the traditional crosswalk markings that define the pedestrian circulation routes.

Mast Arm Footing Options The mast arm footing design consists of three options. Option 1, borrows from the coquina stone elements of the West Canal Streetscape. Banding has been added to the first option to also tie in with lighting base treatments found on East Canal Street. Option 2, takes it’s design intent from the existing tabby finish and banding found on the light pole bases on East Canal Street. Options 1 & 2 would be totally cast out of concrete to reduce the maintenance of the current metal banding on East Canal Street. Option 3, reflects the traditional cast iron look for the mast arm base such as has been used in numerous areas throughout the city.

Mast Arm Decorative Concepts The decorative elements associated with the mast arm itself include the color of the mast arm ranging from black (concept 1), dark green (concept 2) and brown (concept 3). Decorative elements also occur where the horizontal part of the mast arm meets the vertical. Concept 1, uses the wave motif from the Waterfront Loop theme. Concept 2, uses the City of New Smyrna Beach logo Concept 3, explores a traditional wrought iorn motif. A variety of banners approved by the City are also shown on two of the concepts.

New light pole banners, "Welcome New light pole banners, "Welcome! Canal Street Historic District", to be installed along West Canal Street as well as East Canal Street and S. Orange Street. New design to be installed on current "wall sign" on side of building on the northeast corner of Canal St. and U.S. 1. Currently in design phase which incorporates the wave, same as with the gateways, with the palms and other consistent artistic elements from the LOOP and the CSHD. New light pole banners, "Welcome! Canal Street Historic District", to be installed along West Canal Street as well as East Canal Street and S. Orange Street. (see the attached) New design to be installed on current "wall sign" on side of building on the northeast corner of Canal St. and U.S. 1. Currently in design phase which incorporates the wave, same as with the gateways, with the palms and other consistent artistic elements from the LOOP and the CSHD.

Dunn Lumber Site Requesting West Canal Park designer to incorporate more permanent LOOP banner as part of overall park design. NOTE: The current LOOP roadside banners are in a mobile/temporary frame. Funding of West Canal Park (fka Dunn Lumber site) will come from the sale of City property for FDOT right-of-way.. The City has developed preliminary plans to convert the existing CRA property (formerly known as the Dunn Lumber Site) in the northwest corner of the intersection into a park. The designer of the park has been requested to incorporate the Waterfront Loop banner into the design. These will eventually replace the banner which is located there now in a temporary frame. The funding of the park improvements will come from the sale of a portion of this property to the Florida Department of Transportation.

Please Turn in the Comment Cards Tonight Comment Cards are provided if you would like to make a comment or have a question that will become a part of the project file. Please place your comment cards at the sign in table near the doorway. We welcome your comments.

Thank You for Attending! For additional information, please contact: Randy Raiman, RLA, ASLA Project Landscape Architect HHI Design 407.616.5502 rraiman@hhidesign.com This concludes the presentation of the US 1 and Canal Street Intersection Aesthetics.  Thank you for your interest and we appreciate you taking the time to attend tonight’s Public Information Meeting. Please feel free to come up to the presentation boards and we will answer any questions you have one on one. If you do not have any questions at this time, you may use the comment cards and a written response will be provided in a timely manner. Thank You! www.cflroads.com