Instrument commanding VSTP (i-VSTP)

Slides:



Advertisements
Similar presentations
Chapter 4 Constructors and Destructors. Objectives Constructors – introduction and features The zero-argument constructor Parameterized constructors Creating.
Advertisements

Advanced SQL (part 1) CS263 Lecture 7.
Coding and Debugging. Requirements and Specification Recall the four steps of problem solving: Orient, Plan, Execute, Test Before you start the implementation.
The Assembly Language Level
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
Auditory Scene Analysis (ASA). Auditory Demonstrations Albert S. Bregman / Pierre A. Ahad “Demonstration of Auditory Scene Analysis, The perceptual Organisation.
ESOC | Chris Watson | ESA/ESOC | Page 1 Mosaics Operational aspects CHRIS WATSON ESAC.
Chapter 6: Pivot Tables Spreadsheet-Based Decision Support Systems Prof. Name Position (123) University Name.
Time correlation CHRIS WATSON ESAC.
Practical Object-Oriented Design with UML 2e Slide 1/1 ©The McGraw-Hill Companies, 2004 PRACTICAL OBJECT-ORIENTED DESIGN WITH UML 2e Chapter 5: Restaurant.
SWE Introduction to Software Engineering
Unary Query Processing Operators CS 186, Spring 2006 Background for Homework 2.
Create a movie into CATIA 5 th CERN CATIA Users Forum Jean-Pierre Corso EN-MEF.
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
Advanced User Guide to Outlook and all its features.
Events Handling Edward Kwang President. Design Background Customer Service –customers would like to be notified when and out of stock inventory item is.
Lesson 8- Assemblies. –Are a grouping of parts –Have orientation and alignment specified –Are Three dimensional Assemblies let you –See if the parts will.
Playing Back Scripts In HP LoadRunner >>>>>>>>>>>>>>>>>>>>>>
Program with PL/SQL. Interacting with the Oracle Server.
People © 2013 The Sleeter Group All rights reserved. Intuit, the Intuit logo and QuickBooks, among others, are registered trademarks of Intuit Inc. Other.
Advanced Technical Writing Lecture 4 Memorandums.
Make and Take Slides 1-2 Expository Upper Grade Slide 3 Narrative Upper Grade Slide 4 Narrative Primary Grades Slide 5 Expository Primary Grades.
Adventure Maker Music Maker Tutorial by Falloneus Braddidieus.
Technical Presentation
A Collaborative Campus Solution Sharon San Miguel Office of Information Technology Outlook 2010.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
37 Copyright © 2007, Oracle. All rights reserved. Module 37: Executing Workflow Processes Siebel 8.0 Essentials.
 Each tab is geared towards a certain activity area.
Welcome to IT133 Software Applications Unit 2. AGENDA This seminar we will cover:  Announcements  Reminders  Word  Getting started with assignment.
Planning and Scheduling Meetings in Outlook 2010 Using your Outlook Calendar.
Chapter 5 : Integrity And Security  Domain Constraints  Referential Integrity  Security  Triggers  Authorization  Authorization in SQL  Views 
Storage and File structure COP 4720 Lecture 20 Lecture Notes.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
Connect hardware safely to a computer system, test functionally - P5 By Ridjauhn Ryan.
Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
Program with PL/SQL Lesson 3. Interacting with the Oracle Server.
The Glenrose assembly Instructions By Laser Dollhouse Designs.
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
LNF 12/12/06 1 F.Ambrosino-T. Capussela-F.Perfetto Update on        Dalitz plot slope Where we started from A big surprise Systematic checks.
Classroom Wiki Tutorial EDIC 763 Instructional Design Fall 2011 Aysha Bajabaa Dr. Gary Whitt 1 NextBack.
ESAC | Chris Watson | ESA/ESAC | Page 1 TM corridors Concept and ICD CHRIS WATSON ESAC.
Using Microsoft Outlook Training By Gary Lane.
Mission Planning Concepts
The road to the first E2E tests
SOC-Produced Auxiliary data
Definition of the Programming Language CPRL
SOC-Instrument Team interfaces
GLAST Large Area Telescope:
Reviewing Electronic Exhibits
IOR and E_FECS ICDs CHRIS WATSON ESAC.
Proposals on remaining issues on search space
Solar Orbiter Instrument Testing by MOC-SOC
Using local variable without initialization is an error.
Interacting with the Oracle Server
CPSC 388 – Compiler Design and Construction
الذاكرة طويلة المدى Long-Term Memory
Sequence Alignment Using Dynamic Programming
Jim Aloise System Programmer
Grade 11 Functions (MCR3U)
The Garage Assembly Instruction By Laser Dollhouse Designs
Languages and Compilers (SProg og Oversættere)
CodePainter Revolution Trainer Course
Data Structures & Algorithms
Data Structures & Algorithms
Negative Numbers.
MANAGING STANDING ORDERS AND SERIAL ORDERS
Title length max. two lines
Using AIM (for Registered Students):
Presentation transcript:

Instrument commanding VSTP (i-VSTP) CHRIS WATSON ESAC

Background “VSTP” is used in two contexts Pointing-VSTP (p-VSTP) Not the subject of this presentation Instrument-commanding-VSTP (i-VSTP) The subject of this presentation The two are distinct. There is no synchronisation between the two This presentation is to highlight some updates on i-VSTP detailed in the IOR ICD Reminder: i-VSTP commanding is required to be Pure addition of commands (no moves, no deletions) Resource neutral Non-critical / Non-safety-related Belonging to whitelisted sequence call (agreement with MOC/SOC)

i-VSTP updates i-VSTP commanding is now agreed with MOC to be supported in any RSW Not just “feature-tracking” RSWs, where the p-VSTP support is foreseen The windows for i-VSTP insertion have to be declared in advance within your STP IORs (and we recommend also in your MTP IORs)

i-VSTP updates Reserved slot to be free from all instrument commands at MTP/STP 1 TC/second constraint => we don’t allow interleaving of VSTP commanding on top of STP commanding. Plus a margin around the edges, 1 sec TBC (because the time correlation will shift slightly between the uplink of STP and i-VSTP) …this needs to include the expansion to commands (not just the sequence calls explicit in the IOR). TBC details of how SOC will check this Max number of commands (for later insertion) declared as a parameter of each reserved slot 150 TCs/day checked at MTP/STP is the sum of explicit commanding IOR, plus sum of VSTP reserved max TCs, plus one implicit command for each VSTP window (inserted by SOC, needed to “glue” the scheme together onboard)

i-VSTP updates The i-VSTP IOR, when it comes, is checked at SOC for Sequence calls belonging to whitelist i-VSTP IOR fits (in time) inside its corresponding slot identified at STP The number of commands is <= the declared max number of commands associated to the slot The i-VSTP IOR has to arrive at SOC 36 hours (TBC) before the start of the pass which completes prior to the start of the reserved slot Pass that completes prior to reserved slot start 36 hrs prior to pass start