EN-STI activities in LHC during EYETS

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
31/03/11FV 1 CEDAR from flammable gas safety point of view.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
Associated detection/extinction systems D. Swoboda.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
EN-CV interventions during YETS
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
TE-CRG Activities D. Delikaris, TE-CRG.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Teleconf ACS – FREIA 28th March 2017
STI test HRMT-35 and Collimator plans for 2017 Special ColUSM: Material and design readiness for LS2 productions 2th May 2017 I. Lamas Garcia,
Collimation Activities during EYETS
News and Introduction from CERN June 15th, 2005
Linac4-PSB 160 MeV connection readiness review
Framework Schedule from EYETS 2016 to LS2
TS2 preparatory meeting
TE-MSC activities in SPS during LS2
Francois and Lau EATM 17 July 2012
EYETS David Hay EN-OSS.
Status of LHC installation & New Installation Schedule
EYETS LHC 2016/2017 Works EN/EL/CF
TDI Coating test at HiRadMat Proposal 1605 HRMT-35 HiRadMat Technical Board Meeting 15th September 2016 EDMS I. Lamas Garcia, M. Butcher,
A. Rossi on behalf of the whole team:
SPS - EYETS 2016/17 Vacuum systems planning
Helium spill in LHC tunnel
Long Shutdown for the LHC: Vacuum Beam Pipes
LHC Beam Vacuum activities during YETS LS2
YETS & LS2 Reminder G. Girardot 20 juin 2017.
TE-ABT Activities for LS2
EN-HE SPS works during EYETS
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Renovation of the 45-year old PS magnets
Planned activities on collimator for LS1
Cryogenic Risk Assessment in LHC
YETS PS + PS SWY + TT2 Facility Coordinator:
Results from Collimator Hardware Commissioning during EYETS 2016/2017 8th May 2017 LHC Collimation Working Group #217 I. Lamas Garcia, on behalf.
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Impedance working group update
ISRC and LEBT Vacuum System Design
LS3 Study & Readiness Meetings
SPS Planning meeting for LS2 #26 Vacuum sectors status
Presentation transcript:

EN-STI activities in LHC during EYETS 2016-2017 edms 1714656 Sven De Man + Inigo Lamas Garcia

Activities in LHC and TI Pt 7/Pt 5 Collimator + Goniometer Installation. Assets available from 15/02 Commissioning collimators end of EYETS Main dump consolidations beginning 2017 – as soon as radiation level is stable (ALARA) Replacing TIM Replacement RadMon v.5 by v.6 Installation LSS7 No actions on TDI

EYETS 2016-2017 Collimation Point 5: new “compensation wire” collimators Slot TCTPH.4R5.B2 -> TCTP to be replaced by TCTW#1 Slot TCL.4L5.B2 -> TCL to be replaced by TCTW#2 Point 7: Slot TCSM.D4R7.B2 (empty) -> install TCSPM proto Slot TCSM.A5R7.B2 (empty) -> install TCPCH (crystal goniometer) Slot TCP.C6L7.B1 -> Replaced by TCPP proto A6R7.B2 -> Slot to be created for TCPCV (crystal goniometer), system from TCSM. The services are supposed to be already prepared for the new slot Inigo Lamas Garcia

Procedure: EYETS 2016-2017 New slot: 6L7 Removal: Marking beam axis and collimator origin by Survey Collimator support and plug-in installation (EN-ACE-COS) Main water connections installation (pending inspection) Cable installation Removal: Removal of the collimator from slot with Palfinger by HE Transport to RP storage in dedicated box Installation: as from 15th of February Transport to LHC location on dedicated trolley Installation of the collimator to slot with Palfinger by Transport team Collimator alignment by Survey team Collimator bake-out by Vacuum team Collimator commissioning

Preparative @ Technical Stop 2016 Check Presence of all systems: Water connections Electric cabling Collimator base/plug-in or survey mark (new slot case) Space free - Interference risks 5th axis for TCSPM At following locations: Slot TCP.C6L7.B1 Slot TCSM.D4R7.B2 Slot TCTPH.4R5.B2 Slot TCL.4L5.B2 Slot TCSM.A5R7.B2 New slot in A5R7.B2

EYETS 2016-2017 In summary: New slot creation: Marking of the floor by Survey team Collimator support and plug-in installation Main water connections installation Electric cabling Collimators Uninstallation: Removal of the collimator from slot by HE Transport on dedicated trolley to surface Transport to RP storage on dedicated box

Installation: available from 15-02-2017 EYETS 2016-2017 Installation: available from 15-02-2017 Collimator Installation: Transport to LHC location on dedicated trolley Installation of the collimator to slot with Palfinger by Transport team Collimator alignment by Survey team Collimator connection bake-out by Vacuum team Collimator commissioning

Maintenance work EYETS 2016-2017 RadMon maintenance Replacement by approx. 100 RadMon v.5 by v.6 essentially LSS3 and LSS5 Inspection of TED recommissioning of all collimators near the end of EYETS

EYETS 2016-2017 HCTDE__001 Consolidation of dumps in caverns UD62 and UD68

EYETS 2016-2017 Main dumps Venting in order to exchange the joints and gaskets on the two dumps, as foreseen.  [VSC & STI] Reduction of the nominal Nitrogen pressure to 1.1 bar in order to avoid the opening of the relief valve during high intensity dump. [VSC]

EYETS 2016-2017 Main dumps Exchange seals and gaskets on both dumps.  [VSC & STI] Modification of the flanges. [STI] Test of the spare in the UD. [STI, VSC]

EYETS 2016-2017 Main dumps Open the dump shielding in order to access the downstream TDE window for a leak detection. (UD62 and UD68)

Replacement of the first TIM series unit EYETS 2016-2017 Replacement of the first TIM series unit Installation in CMS Bypass (TIM garage) TIM 3 will run from IP2 to IP5 TIM 2 will run from IP5 to IP8 4 hours needed + test runs

Thank you Questions?