Under Test End Dates 1st February 2011.

Slides:



Advertisements
Similar presentations
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
Advertisements

Virtual EMS Step by Step Instructions to Submit Online Room Reservation Requests Events Management Office Rick McCluskey
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
Unit Registration Process Improvement SEMO 05/12/2012.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Impact Assessment Mod_17_12 : Report on Offered Capacity in Implicit Auctions 24 October 2012.
19 October 2017 Overview The Management Board, at its December 2015 meeting, has endorsed the timeframe for the implementation of the EU clinical trial.
Project Update and Summary of Project Priority List (PPL) Activity
Caldwell County Volunteer Tracker Login
University of Texas System 2017 UT SELECT Part D Overview
2017/2018 Emergency Solutions Grant Overview
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Exit Capacity Release Methodology Statement
UK Link Technology Refresh
Capacity Conversion – 616s
Stacking Implementation Plan
Course Development with Instructional Design and Technology (IDT)
Clinical Placement Request Instructions
Proper Billing for Services Provided
MOD_10_13 Remove the requirement on the SOs to sent certain Dispatch Instructions for Pumped Storage Units to MO.
Human resources announces: electronic employee contract/notification system contract/notification offers will be distributed via utilizing.
CCSP/SOURCE and EVV Update
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Invoice Inquiry Quick Reference Guide
Select Requisition.
Staff EPAF Notifications
Market Trials ChMC 8th August 2018.
Facilities Management Course Topics Covered Include:
Travel and Budget Request
and Amended Calendar Proposal(s)
Xoserve provide meter and access instruction
Project Nexus Workgroup AQ Correction Process Timeline
GLAS Training for Advisors
CEU Online System At The Friday Center
IGG Agenda – 30th October 2008 Minutes from last IGG meeting
<Committee Name> Status Report – Spring 2013
“Homologation Procedures & Type Approval
Leadership/ communication and commitment
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Mod CMC_03_18 Unique circumstances may arise whereby the Transmission System Operator or Distribution System Operator requires additional time to formulate.
Equitable Services Sections 1117 and 8501 of the Elementary and Secondary Education Act (ESEA), as amended by the Every Student Succeeds Act (ESSA),
Lincoln Common Redevelopment Construction Update.
Assignment Workshop 2 16th September 09, Solihull.
Contract Refusal Contract Refusal is a process associated with participant’s ex-ante trading behaviour; It relates to how the Traded Not Delivered element.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
ETS – Air Data submission Training
MRSO Update James Long MRSO.
WHAT IF YOU LATE FOR ANNUAL GENERAL MEETING
IGG Agenda 26th August 2010 Minutes from Previous IGG Meeting
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
RAPPORT Update OSP Roundtable October 16, 2018.
CERTIFIED PROFESSIONAL GROWTH
Take note or Add as Favourite
Workday 32 Alicia Maule January 14, 2019
UKL Future Release 3 XRN4534 – Amendment to RGMA validation rules for asset install date Deployment Options – 9th January 2019 Update.
Easy-Speak How easy is it?
Outage Adjusted Wind and Solar Forecast Reports
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
User Guide Employee & Manager
Studio day : February 13 First draft of : Communication Plan
PRISMA General Information
Final Project.
and Amended Calendar Proposal(s)
Request Inactive Date The Request Inactive Date signifies the last active date for an equipment request. The Request Inactive Date, which is displayed.
Payee Onboarding May 21, Payee Onboarding May 21, 2019.
Samples of Credit Cover data
Alternative Testing.
Presentation transcript:

Under Test End Dates 1st February 2011

Context Business Process for a Generator Unit Under Test Involves email communication between TSOs and SEMO Mod 33_10 provided for clear set of steps for and the timings involved in a Generator Unit being granted Under Test status Issue is with cancellation of test dates Flexibility of unit to declare available following an outage Mod 65_08 delivers the flexibility

Options TSO and SEMO have reviewed this request for increased flexibility: Reduce 2 WD notice for change to 1 WD Incorporate in Validation of TOD process Move to calendar day process for approval Deliver Mod 65_08(V2) as this allows testing to be cancelled via EDIL

Feasibility of Options Move to 1 WD Business Process SEMO and SOs can deliver as business process change. Generator must inform TSO in advance due to the tight timelines for approval to SEMO. Include in VTOD Not favoured by Participants. Involves a system change so not viable. Move to Calendar Day Process Not possible at present. Preference for delivery of Mod 65_08 v2 as it provides maximum flexibility to generators. Cancel Test Instructions via EDIL (Mod 65_08 v2) Preference by TSOs since it removes manual /email business process and allows generator to re-declare availability through EDIL and for TSO to remove test instruction