Diffuser status October 2017

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Medical Contract Manufacturer Minnesota - (763) Puerto Rico - (787)
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Compressor status AWAKE Technical Board meeting 19 May 2015.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Compressor status AWAKE Technical Board meeting 19 August 2015.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Refurbished Booster RF John Reid October 24, 2012.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
R.Leuxe20th CATIA FORUM – EDMS Page 1/16 Updates on screws, materials, pins, and UHV components.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
ANL CRAB CAVITY JEFFERSON LAB LHC-CC08 BROOKHAVEN FEBRUARY 25, 2008 LARRY TURLINGTON.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
MAE 435 Progress Report Team: Formula SAE Due Date: 2/8/2016 Advisors: Dr. Bawab; Nathan Luetke Presenter: Ryan P.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
ECR (SPS Flange Impedance Reduction) Follow up for IWG C. Vollinger 16/08/2016.
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Teleconference ACS – FREIA 31th May 2017
Complementary ISTC Projects #3888, 3889p
Teleconference ACS – FREIA 10th May 2017
LIU–PLI report LIU SPS meeting.
Status of the BI Work Package in the LIU-PSB frame
Teleconference ACS – FREIA 31st October 2017
Spectrometer Solenoid Fabrication Status and Schedule
EHN1 Neutrino Installation Plans
Far Detector Activities Late 2017 – Early 2018
MICE Coupling Coil Update
Teleconference ACS – FREIA 20th February 2018
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
LS1 status 17/03/2014.
Undulator System Components Status Dean Walters
LCLS Undulator System Status and Schedule
Crab – RFD prototype: Fabrication Status Update
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Two-beam Test-stand Design and Construction Status
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
Teleconference ACS – FREIA 19th June 2017
9th meeting of the Expert Group on Reporting (22 March 2011)
BGC Collaboration Meeting –
ThomX – Commissioning Meeting – 25/01/2018
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

Diffuser status October 2017 B. Balhan, D. Barna, J. Borburgh, A. Farricker 10/19/2017 3rd Diffuser meeting

ECR status ECR (edh doc. 1836203) document updated following 1st approval round. Outstanding in ECR: Beam impedance validation to be included. BLM implementation to be clarified, awaiting results from Fluka team. Sonia confirmed we need to provide differential drawing for BLM installation as well, before document can be send for approval. Provisional location of BLMs defined and indicated in document. 10/19/2017 3rd Diffuser meeting

Basic RF shielding Bruno proposed RF shield to preserve impedance Aaron determined effect: not ideal 10/19/2017 3rd Diffuser meeting

Differential drawings Need 2 differential drawings for ECR: Diffuser installation (done, see figure) BLM installation 10/19/2017 3rd Diffuser meeting

Diffuser production WRe wire received as well as special flanges and collars. All required material shipped to Wigner Institute. Engineering specification under preparation by Wigner colleagues. Manufacturing of components started. 10/19/2017 3rd Diffuser meeting

Status report by Wigner (D. Barna) All alu parts (support, etc) are finished, and will be assembled as soon as the bolts arrive (hopefully this week). Vacuum chamber is in the queue, so far no problem Wire holder parts are mostly done (wire edm) Machining of all parts finished by the end of the month Vacuum chamber completed by mid November (tooling discussed with the e-beam welder, laser welder). Mounting of the wires: 2 setups by mid November Leak checking of chamber by the end of November Edge welded bellows arrive in principle around mid November (on the critical path). Will be baked and welded quickly after delivery. 10/19/2017 3rd Diffuser meeting