Cherrill Spencer, SLAC Member of ATF2 Magnet Team

Slides:



Advertisements
Similar presentations
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
Advertisements

FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Brett Parker Brookhaven National Laboratory Superconducting Magnet Division 20 October 2010 ILC QD0 R&D Update IWLC2010 International Workshop on Linear.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
Supports and Movers for ATF2 Magnets R. Sugahara KEK France and Japan Collaboration Meeting Feb , 2006.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
Global Design Effort BDS updates SLAC 1:30 Monday meeting Andrei Seryi November 5, 2007 Previous update – August 20, 2007.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Suggestion Directive from Magnet Systems Group for how to name ILC magnet types Cherrill Spencer, ILC 2 nd May 2006.
BPM support and beam pipe length FD support status A.Jeremie.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
ATF2 Magnets Results of the Field Measurements of three ATF2 DEA Dipoles by Single Stretched Wire and Hall Probe at IHEP over past 2 months: updated report.
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
The Basic Shapes. Comparing the size and placement of objects to one another in a composition in order to proportionally draw them as they actually appear.
How high frequency we care if we need the stabilization of 1nm level?
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
IHEP 打ち合わせ (7/5-7/6) 報告 7/18 ATF2-mag-all への菅原メールより適当に抜粋 7/20 増澤(菅原代理) [IHEP]Jiang Wang, Jiuqing Wang, Cai-tu Shi, Zhaosheng Yin, Xuwei Dai, Yucheng Liu.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.
ATF2 Meeting December Andrea JEREMIE1 France/ATF2 kick-off meeting in Annecy October participants from 3 regions! LAPP/Annecy in.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Alignment and stability session
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Summary FD Support System
Machine Detector Interface Design Updates
Idea for the low field dipoles near to IP in 2mrad crossing
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
ATF2: final doublet support
Arc magnet designs Attilio Milanese 13 Oct. 2016
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
ATF2 Mover Software 15 December 2008
Y. Iwashita, T. Mihara, S.Nakamura,
Status of ATF/ATF2 and machine schedule in this fall
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy
Updates on IR and FF for super-B factory
Brief Status Report on Fabrication of ATF2 Quads
FD supports A.Jeremie.
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
IP configuration session
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Presentation transcript:

Cherrill Spencer, SLAC Member of ATF2 Magnet Team Production Status of ATF2 Magnets and Possible Movements of Magnets and Movers Cherrill Spencer, SLAC Member of ATF2 Magnet Team LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

New Magnets Being Made for the ATF2 part 1/4 24 new FF and extraction line quads (“QEA”) been made by IHEP, Beijing and measured at KEK. 4 more being made at the moment. 3 dipoles B1,B2,B5 been designed and detailed drawing package completed and reviewed. Will be sent out for bid by magnet vendors in San Francisco Bay Area in next 2 weeks. Goal: have 3 dipoles made, measured and delivered to KEK by 31st March 2007. LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

New Magnets Being Made for the ATF2 part 2/4 Two final doublet quads: QD0, QF1,being fabricated by enlarging bore of 2 existing quads of the FFTB “QC-3” style. Remaining question I’d like agreement on today: size of enlarged bore. As explained in my Monday 9th October talk I’d like to make new bore 49mm in diameter. Will work on disassembly, EDM’ing poletips, re-assembly and magnetic measurements between now and March 2007. LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

New Magnets Being Made for the ATF2 part 3/4 Five new sextupoles are needed: 3 in the FF: SD4, SF5 and SF6 and 2 in the “final doublet” (interleaved with final 2 quads): SF1 and SD0. Considerations of available Z space and height of ATF2 beam lead us to make new and different designs for the FF and FD sextupoles. SF1 & SD0: will have (large) S-band BPMs attached to their core their bore should match the QD0/QF1 bore (= 49mm) Cores can be somewhat longer than 90mm their cores may need to fit in with a wider FFTB mover than the “QMAG” style & must put bore at 1.2m from floor LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

New Magnets Being Made for the ATF2 part 4/4 FF sextupoles: another new design needs to be made with these features: Bore to be same as adjacent QEA quads: 32 mm diameter Coil end shape to be compatible with a C-band BPM Core to be ~90mm long (OK with a 32 mm bore) Bottom of core to be flat, to sit directly on a “QMAG” mover T plate. Distance between core bottom and bore center to be 295mm Vertical distance between bottom of T plate (under a mover) and magnet bore center to be 541 mm. Will be over 7 months from now (at earliest) before 5 sextupoles are designed, made and measured. LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

Two important questions about the FD magnets for ATF2 we considered Question #1. Will the 4 FD magnets and their S band BPMs fit on the CLIC table?- overall length is the issue . Answer #1. Yes (Okugi analysis of layout). Question #2. Can they have FFTB magnet movers under them and have centers of their apertures match the 1.2m beam height off ATF2 floor? Answer #2. A new very short support has been designed that fits under the FD quads’ movers’ T plate and puts bore center at 1.2 m (see Nicolas Geffroy presentation this workshop 11 Oct 06) LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

What SLAC equipment LAPP needs to thoroughly test the CLIC table A QC3 quad: Spencer is negotiating with SABER project group at SLAC who suddenly think they might need the 3rd QC3 quad (we know where it is stored at SLAC). Could lend it to LAPP until Feb 2007, maybe longer. The QC3-style FFTB mover (=wider T plate) to go under the borrowed QC3 quad. Three other FFTB movers Electronics and cables to run the 4 movers 2 Streckeisen “STS2” sensors:Spencer to enquire at SLAC LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

Cherrill Spencer, SLAC Status ATF2 Magnet Production Electronics & cables to control FFTB movers. Need 2 crates to control 16 movers Interface between controller and stepper motors Back and front of stepper motor resistor chassis LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

Use of spacer to adjust magnet height / inclination New design for wide mover support by N. Geffroy, LAPP. With two possibilities for height adjustment 27.05 cm 5.59 cm 32.64 cm (40.64 - 8) 3.05 cm Use of spacer to adjust magnet height / inclination Very accurate base plate thickness for desired magnet height. LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production 5

Cherrill Spencer, SLAC Status ATF2 Magnet Production T-1 plate for QC-3, sits under FFTB mover. We have only one QC-3 T plate: for QF1 609.6 mm WIDE Need to make at least one more wide T plate for QD0. If FD sextupoles width demands it will need 2 additional wide T plates for them. 482.6mm LONG LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

Cherrill Spencer, SLAC Status ATF2 Magnet Production Drawings of smaller T-plate that we will be using under QEAs and FF sextupoles If need wider movers: would make new T plates and use shafts, stepper motors, LVDTs etc from QMAG movers to finish the wider mover. Width 457.2mm Length 482.6mm LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production

Proposed Movement of old FFTB movers Send 24 less wide movers & their electronics and cables to KEK very soon Send one wide mover and 3 less wide movers & their electronics and cables to LAPP very soon (send 3rd QC3 at same time) Keep one less wide mover at SLAC Would like a decision today on this proposal LAPP, Annecy, 11th Oct 2006 Cherrill Spencer, SLAC Status ATF2 Magnet Production