Joint IPR/DAI Workshop

Slides:



Advertisements
Similar presentations
Heppenheim Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
Advertisements

05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
November SLS RFM and RNG REPORT 18 November 2004.
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
26 October2005 Reston, VA, USA 1 MOIMS AREA: STATUS REPORT, End of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC 26 October
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
Cesg-1 CSS Area Report -- Super BOF Background From A. Hooke to CESG: (CSS AD emphasis ) Date: Fri 02 Oct 2009 To: CESG cc: CMC Subject: Proposed.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 CCSDS Information Architecture Working Group Daniel J. Crichton, Chair NASA/JPL 14 September 2005.
13-17 October 2008 Berlin, Germany eb - 1 SMWG Closing Plenary Report Fall 2008 Meeting Erik Barkley 17 October 2008.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
CCSDS MOIMS Falls Meeting 2007 – Colorado Springs - June 2006 SAFE Status Progress status & f Stéphane Mbaye
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary 16 January 2007 Colorado Springs, USA.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
MOIMS Area Report N. Peccia ESA R. ThompsonBNSC. MOIMS Reportp. 2CESG-CMC Meeting 23 / 24 Jan 2007 Attendance to the MOIMS Meetings Diversity FactorSM&C6.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary 1 October 2007 Heppenheim, Germany.
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
IPDA Registry Definitions Project Dan Crichton Pedro Osuna Alain Sarkissian.
SEA AREA MID-TERM REPORT May 2004PS 1 System Engineering (SEA) AREA REPORT (with CESG Updates) 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
CNES: CCSDS - MOIMS Area Data Archive ingestion WG Information Packaging and Registry WG CNES Report on activity May-October 2004 Toulouse meeting.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary
Wireless WG Monthly Teleconference
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE INTERNETWORKING SERVICES (SIS) AREA
Systems Architecture WG: Charter and Work Plan
Digital Repository Audit and Certification BOF
Cross Support Architecture WG: Charter and Work Plan
CCSDS Navigation Working Group
Wireless WG Monthly Teleconference
Wireless WG Monthly Teleconference
CCSDS System Engineering
SLS AREA REPORT November 2004 November 2004.
CWE File Structure.
Delta-DOR WG: Report of the Fall 2010 Meeting
GEOSS Data Sharing Principles
CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code Oct 2002 ******************************************************
Atlanta, Georgia, USA, 16 September 2005
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE LINK AREA MID-TERM REPORT
ATML ATML’s mission is to define a collection of XML-based schemas and services that allows ATE and test information to be exchanged in a common format.
TGac Status and Timeline
Strategic Coordination Group
Presentation transcript:

Joint IPR/DAI Workshop MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20 Jan 3007 09-Dec- 2005 Toulouse,FR

CONTENTS IPRWG REPORT SUMMARY TECHNICAL STATUS CROSS-AREA TECHNICAL ISSUES OTHER ISSUE AND CONCERNS PROPOSED AREA RESOLUTIONS/ACTION ITEMS 09-Dec- 2005 Toulouse,FR

SUMMARY TECHNICAL STATUS AREA REPORT Information Packaging and Registries (IPR) Working Group Goal: The purpose of this Working Group is to: 1. Collect use cases from the space operations community and develop requirements for XML data packaging: Develop a set of recommendations that specify an extensible framework for packaging data and metadata tha Oversee the development of at least two implementations of the packaging framework and associated with usability and interoperability tests in many areas of space data systems Based on testing experience and requirements from various Space Data and Operations Groups, establish extensible registry/repository architectures that leverage the more widely based registry work such as ebXML and UDDI. Develop specific Registry/Repository standards that support the data packaging registry/repository requirementsi focusing on the support of XML Schemas and associated XML objects Working Group Status: Active _X__ Idle ____ Working Group Summary Situation: SUMMARY TECHNICAL STATUS X comment: PROBLEM CAUTION OK status: 09-Dec- 2005 Toulouse,FR

SUMMARY TECHNICAL STATUS 2 AREA REPORT SUMMARY TECHNICAL STATUS 2 Information Packaging and Registries (IPR) Working Group XFDU Schedule: Draft Green Book Issue 1 for Panel Review 1-March-2007 Panel Review Comments Due 1-April-2007 RID from Agency Review Due 1-May-2007 RID Responses Review Telecon 1-June-2007 XFDU Blue Book/Green Book CESG Submissions 15-June-2007 Resolution of any Agency Blue Book Comments 1-Oct-2007 Problems and Issues: None 09-Dec- 2005 Toulouse,FR

SUMMARY TECHNICAL STATUS 2 AREA REPORT SUMMARY TECHNICAL STATUS 2 Information Packaging and Registries (IPR) Working Group XML Schema Registries Schedule: Use Cases and Requirements on CCSDS Usage of XML Schema Registries 15-March-2007 White Papers and Agency Prototypes on CCSDS Schema Registries 1-October-2007 Draft White Book(s) on CCSDS XML Schema Registry 1-Jan- 2008 XML Schema Registry White Book and Prototypes 1-July-2008 XML Schema Red Book/Green Book/Reference Implementation for CESG Review 1-Mar-2009 Problems and Issues: If significant RIDS are received on the XFDU Red Book this schedule may be impacted 09-Dec- 2005 Toulouse,FR

CROSS-AREA TECHNICAL ISSUES AREA REPORT CROSS-AREA TECHNICAL ISSUES Information Packaging and Registries (IPR) Working Group Issue 1 -IPR has received resource commitments from member agencies develop an XML Schema Registry Recommendation and implementations which are needed both for XFDU deployment and coordination of the rapidly growing XML schema volume within the agencies. The IPR WG agree that a common Registry/Repository Service Architecture is needed within CCSDS and will provide full support for a CCSDS wide effort to establish a preliminary version of this Architecture. However, due to critical needs of IPR member agencies for an XML Schema registry the IPR support of the Architecture effort is available for the period from 1-Feb -2007 to 31- May-2007 at which time those resources will be applied to the development of a CCSDS Recommendation for an XML Schema Registry/Repository that specialize the CCSDS Registry/Repository Service Architecture. The resulting interfaces and data structures can then be used to validate/modify the CCSDS Registry/Repository Service Architecture 09-Dec- 2005 Toulouse,FR

OTHER ISSUES AND CONCERNS AREA REPORT OTHER ISSUES AND CONCERNS 09-Dec- 2005 Toulouse,FR