3GPP TSG RAN WG1 Meeting #90bis

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
WF on PBCH Coverage Enhancement
Way forward on eIMTA signaling to support up to 32 component carriers
WF on DL LBT Scheme for DRS
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
WF on MCOT and CWS for LBT priority classes
Way forward to NB-IoT 3GPP TSG RAN WG1 #83 R1-157xxx
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
WF on dynamic blockage Qualcomm, Intel, Samsung, Ericsson R GPP TSG RAN1 #85 Nanjing, China, May , 2016 Agenda Item:
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
Way Forward on NR UE Testability Intel Corporation, CATR 3GPP TSG-RAN WG4 Meeting #80bis R Ljubljana, Slovenia, August, 2016.
Overview of open issues in
Offline discussion on remaining details on RRM measurements
WF on Bandwidth Part for DL common channel
WF on RA-RNTI design 3GPP TSG RAN WG1 Meeting NR#3 R1-171xxxx
3GPP TSG-RAN WG4 Meeting NR#3 Nagoya, Japan, 18 – 21 Sep, 2017
Summary on Beam Recovery Mechanism
Offline Discussion on remaining details about RACH Procedure
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
3GPP TSG-RAN WG4 Meeting #84bis
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
WF on new NR CG sequences for PUCCH
QCL configurations in above 6GHz and the necessary RS QCL linkeages
WF on NPUSCH scrambling for Rel-14 NB-IoT
WF on pre-DFT PT-RS pattern for DFTsOFDM
Summary of proposals on CBG-based retransmission
Proposals on remaining issues on PDCCH structure
RACH configuration ZTE, Sanechips R1-171xxxx
Summary of offline discussion for PDCCH structure
Proposals on remaining issues on search space
3GPP RAN1 #90 meeting summary on LAA Enhancements
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
WF on measurement capability and measurement gap for NR
Way forward on UE EIS Spherical Coverage and Beam Correspondence
Summary on Beam Recovery Mechanism
R : SRS Enhancements for LTE-A
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
Illustration of RMSI monitoring windows (TDM)
WF on SS Block Index Reporting through RACH Procedure
Way forward on cell identification in NR
Intel Corporation, Apple
R : Uplink Reference Signal Planning Aspects Agenda Item: 6.6.2
WF on transmit diversity for DFTsOFDM
Way forward on DL ACLR&ACS for WP5D LS
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
TSG-RAN WG1 Meeting #60bis
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on Radio Link Monitoring in NR
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Way Forward on Coexistence Evaluation Methodologies for LAA
WF on LTE-NR DC with UL coexistence
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
WF on UL Beam Management
WF on UL Beam Management
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
WF on CB-group based retransmission
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
WF on LTE-NR Coexistence
3GPP RAN1 status on NR-Unlicensed
Status of NR-U - Wi-Fi coexistence
Presentation transcript:

3GPP TSG RAN WG1 Meeting #90bis Prague, Czech Republic, 9th – 13th October 2017 Agenda item: 7.2.3.6 R1-171xxxx WF on TRS design MediaTek, [Ericsson, ZTE, Sanechips, Qualcomm, CHTTL, Intel, Spreadtrum Huawei, Hisilicon, Samsung, vivo]

Proposals TRS periodicity 20ms, 40ms and 80ms are supported TRS periodicity 10ms is additionally supported when 3 additional DL DMRS symbols is configured (HST scenario) Whether measurements across different TRS bursts can be combined or not is configured by RRC (i.e. TRS measurement restriction) For N=2+2, X=2, TRS symbols have the same symbol positions in the two consecutive slots For UL-DL switching periodicity of 1 slot, consider the following options, Option A: only one of the two slots can be transmitted in some TRS bursts, effectively reducing to N=2, X=1 in that burst Option B: Design X=1 for this particular scenario FFS on N in X= 1

Proposals DMRS and TRS are at least TDMed from UE perspective One of the following symbol positions per slot can be configured by RRC, except for the case when 3 additional DMRS is configured Option 1: symbol 4 and 8 ( symbol index starts from 0) Option 2: symbol 5 and 9 Option 3: symbol 6 and 10 Note 1: Potential down selection can be done until next meeting. It is not limited to select only one option Note 2: RRC signaling to configure TRS as above can be related to the existing RRC signaling for DMRS, CSI-RS, etc.

Proposal When C-DRX is configured to the UE, then an assisting TRS burst is present at a RRC configured slot offset kTRS≥0 prior to the start of the C-DRX on duration Note: This TRS burst is only transmitted when there is data for the UE in the C-DRX on duration Note: kTRS =0 implies the TRS is in the first slot of the C-DRX on duration Dynamic indication of rate matching around this assisting TRS is supported Note: To protect PDSCH to RE mapping for other UEs scheduled in a slot containing the assisting TRS burst Note: May use the same mechanism as dynamic rate matching around aperiodic CSI-RS

Proposals TRS sequence has the same formula as that for CSI-RS FFS on c_init Support FDM between TRS and SSB

Proposals TRS RRC parameter set TRS-burst-length TRS-symbol-position TRS-periodicity TRS-slot-offset TRS-RB-position TRS-port-index TRS-sequence TRS-QCL-source TRS-meas-restriction

Appendix The feasible TRS symbol position with St= 4 under different DMRS pattern and PDSCH region