M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
Advertisements

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Advanced Accelerator Association (AAA) Promoting Science and Technology - Activities with Technology Group : A. Yamamoto AAA Activities, Japan.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
June Recent Development of DRFS (Fukuda) SCRF-Meeting 1 1 Recent Development of DRFS (Based on Japanese CFS Tunnel Plan) S. Fukuda KEK.
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Access Hall Study for Cryogenics High Energy Accelerator Research Organization KEK- LC Project Office Masanobu Miyahara 2 Nov
Advanced Accelerator Association (AAA) Promoting Science and Technology - Activities with Technology Group - 1 AAA : A. Yamamoto 第一期技術部会活動 Michitaka.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC Utility Design Study for Kitakami-site
Civil Design for Tunnel Case Studies
Experimental Hall in Mountain Regions
Conventional Facilities and Siting Global Group (ARCFS)
Introduction and Meeting Objectives
Americas KlyCluster Cost Analysis Overview
CLIC / ILC Collaboration for CFS works
Detector hall in mountain regions
Status of Cryogenics Facilities Design
ILC DRAFT CONSTRUCTION SCHEDULE Flat topography & Mountainous sites
CLIC Civil Engineering Update
ILC Cryogenic Systems Draft EDR Plan
ILC CFS AD&I Daresbury Lab Summary
RDR Baseline Layouts for Interaction Region
Presentation transcript:

Summary Some Issues of Future Consideration Detailed Studies of Power Supply Issues for the Distributed RF System Cavern Design for the Detector Hall and Cryogenic Facility in the Deep Undergrounds Disaster Prevention such as the Evacuation Simulation in the Large-Depth Underground Cost Study about the New Design Scheme by the Comparison with RDR Scheme

Milestone of Single-tunnel Configuration in Asian Region KEK-CFS 2010 2011 2012 TDPⅡWORK      Total Design Work Civil Engineering Concept - Design Cavern - Design Detector.Hall and Surface Building Cost - Study New Configuration Engineering Study ML 2D. 3D-Drawing Hall. Cavern 2D. 3D-Drawing Rebase. MT.ST-Planning Central R. -Planning Safety-Issue Drainage issue Environment Cryogenic-Facility Low-volt. Substation Exp.hall Facility Surface building etc Civil -costing Civil -costing Cost Study Plant -costing Infra. -costing CFS-Review ,Tsukuba, 1-2 June.2010

Milestone of Single-tunnel Configuration in Asian Region KEK-CFS 2010 2011 2012 TDPⅡWORK      Main.Sub. Tunnel Detector Hall Central Region Damping Ring Surface Building Cost - Planning New Configuration Engineering Study ML. Cavern -Planning ML. AT. Cavern -Design Rebase. Basic-Planning Detail Design Basic-Planning Detail Design Basic-Planning Detail Design EP. WP Exp.hall Facility Civil -costing Civil -costing Total Cost Study Plant -costing Infra. -costing 3 CFS-Review ,Tsukuba, 1-2 June.2010 3

Support by the Japan Society of Civil Engineers (JSCE) 2010 2011 2012 ■ ILC Committee      Plan & Research Sub  Cavern Rock Bolt Subcommittee TBM Method Subcommittee Disaster Prevention Subcommittee Project Management Subcommittee Drawing : the Standard of Design &Construction Under Consideration Support by AAA (Advanced Accelerator Association Promoting S. & T.) 2010 2011 2012 Facility Working G. CFS-Review ,Tsukuba, 1-2 June.2010