LSST Quality Assurance Mario Juric, University of Washington LSST Data Management Subsystem Scientist Joint Technical Meeting 2017 March 6-8th, 2017.

Slides:



Advertisements
Similar presentations
1 Spiral 1 Requirements Demonstrate GENI Clearinghouse & control framework in Spiral 1 projects as a central GENI concept. Demonstrate End-to-end.
Advertisements

Plans for LSE-130 through CD-2 Gregory Dubois-Felsmann SLAC National Accelerator Laboratory.
Systems Engineering Breakouts George Angeli. Tuesday 11am Current Commissioning Plans – Chuck Claver Revised commissioning timeline Development plans.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
Week 10 CSSE 375 Steve Chenoweth & Everybody. Today Get back Exam 2 This week’s schedule – this Reflection on the course Talk about final assignment Decide.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Development Processes and Product Planning
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Effective Methods for Software and Systems Integration
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Commissioning the NOAO Data Management System Howard H. Lanning, Rob Seaman, Chris Smith (National Optical Astronomy Observatory, Data Products Program)
Pan-STARRS PS1 Published Science Products Subsystem Preliminary Design Review May 9-10, 2006 IPAC.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
Status of Onboard Filter & Ground Software Integration Work done by Navid Golpayegani Steve Ritz J.J. Russell David Wren SLAC Ground Software Workshop:
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 New AM organization and improving the acceptance procedure Masao.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Software System Engineering: A tutorial
SALSA-NetAuth Joint Techs Vancouver, BC July 2005.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
DC2 Post-Mortem/DC3 Scoping February 5 - 6, 2008 DC3 Goals and Objectives Jeff Kantor DM System Manager Tim Axelrod DM System Scientist.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
{ Phases of Project & life cycle Prepared by: Syed ShahRukh Haider.
Test and Integration Robyn Allsman LSST Corp DC3 Applications Design Workshop IPAC August , 2008.
Quality Assurance Benchmark Datasets and Processing David Nidever SQuaRE Science Lead.
1 CORE DATA PROCESSING SOFTWARE PLAN REVIEW | SEATTLE, WA | SEPTEMBER 19-20, 2013 Name of Meeting Location Date - Change in Slide Master Data Release Processing.
ALMA Week, 2004 March 3-5, in Garmisch, Germany ALMA Operations Plan: Progress Report Darrel Emerson (NRAO) David Silva (ESO) JAO Operations Group
Practice Standard for Scheduling Project Manager’s Meeting Status April 28, 2004 Project Manager – Douglas Clark, CEO of Métier.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
Ocean Observatories Initiative Risk Management & Interface Management Jack Kleinert OOI Cyberinfrastructure Life Cycle Objectives Milestone Review, Release.
COMP2110 Software Design in 2003 ● a(nother) framework for Software Engineering ● the Software Engineering ideas and concepts in comp2110 ● Organisation.
1 PDS MC Requirements Process March 29, 2007 (v2).
Purpose of project: Reduction of project risks related to quality of cloud detection / masking for multiple applications over land and sea. Will provide.
PI2134 Software Engineering IT Telkom.  Layered technology  Software Process  Generic Process (by Pressman)  Fundamental activities (by Sommerville)
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Carin Bisland, EPA Principals’ Staff Committee 5/14/12.
1 SUI/T Team – Technical lead: Xiuqin Wu – Science Lead: David Ciardi – System Engineer/Architect: John Rector, Trey Roby – System Design Scientist: Gregory.
Review of the Implementation of the White Paper on Corrections in South Africa, 2005.
What is a software? Computer Software, or just Software, is the collection of computer programs and related data that provide the instructions telling.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
Dodd/Cutri Feb 20, 2008 LSST DMS Applications Organizational Structure Applications Project Manager: S. Dodd Project Scientist*: R. Cutri Deputy Project.
1 LSST DESC MEETING | SLAC NATIONAL LABORATORY | MARCH 8, 2016 Name of Meeting Location Date - Change in Slide Master LSST Data Management Brief Status.
A. D. SMITH – SEPTEMBER 28, 2011 DATA CURATION PROFILE.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Workshop Structure-Detector Agenda structure similar to last two meetings –Two subsystem parallel sessions today and tomorrow –ETD, DGWG, Simulation Parallel.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Verification Matrix Process
SuperTask / Butler working group
LSST Data Management System Science Team Meeting Mario Juric, University of Washington LSST Data Management Subsystem Scientist Joint Technical Meeting.
Pragmatics 4 Hours.
LSST Tucson, AZ - August , 2017 Desired Outcomes Clarify existing opportunities for the Community to provide input to the Project Help the.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Requirements Analysis Scenes
Introductory Remarks and Meeting Goals
LSST Commissioning: FY18 Planning
Chuck F Claver LSST System Scientist & Commissioning Lead
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Instrument PDR Summary of Objectives
Bunker Internal Review Welcome & Charge
Preliminary Project Execution Plan
Presentation transcript:

LSST Quality Assurance Mario Juric, University of Washington LSST Data Management Subsystem Scientist Joint Technical Meeting 2017 March 6-8th, 2017

CAVEAT: !!! Work in Progress !!! Current Drafts Skeleton of the “Data Management Test Plan” (LDM-503; http://ls.st/efe) Draft of the “DM Science Verification” document (http://ls.st/u2y) CAVEAT: !!! Work in Progress !!!

How we build, and how we know we did it right? Project Management Project Science Verification Results DM System Construction System components Science Verification Integrated (sub)system(s) System Integration and Test http://ls.st/u2y

DM “Science Verification” DM Science Verification Document: http://ls.st/u2y

First meeting tomorrow! LSST Project Scientist DM System Science Team DM Project Manager DM Subsystem Scientist (Mario Juric) DM Science Pipelines Scientist (Robert Lupton) DM Science Verification Scientist (Position Open) Team Scientists System Science Team Staff DM SST Analyst (Melissa Graham) Alert Production Scientist (Eric Bellm) Data Release Production Scientist (Jim Bosch) DM SST Analyst (Colin Slater) SQuaRE Scientist (Michael Wood-Vasey; interim) First meeting tomorrow! (Glendale 3, 9am) SUIT Scientist (David Ciardi) Data Processing Scientist (To Be Defined, NCSA)

Science Verification Team DM Science Verification Team DM Science Verification Scientist DM Science Pipelines Scientist (Robert Lupton) Team Scientists DM SST Staff (variable) DM Staff (detailed) External Scientists (variable) http://ls.st/u2y

TODO This is all work in progress !!! Much remains to be done Iterate to a workable model... Converge on the test plan... Get our terminology straight (verification/validation, quality assurance/control/management) Define the I&T processes (!) Define SV exercises consistent with the construction plan Understand how much work there is to be done, make everything is reflected in DM plan and milestones Establish the System Science Team (SST) Hire and/or appoint the SV Scientist We’ll be working (hard) over the next few weeks to get this finalized.