Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in.

Slides:



Advertisements
Similar presentations
February 15, Master Plan for Facilities & Infrastructure Master Plan for Facilities and Infrastructure Whittier | Lenexa | Country Club Hills | Birmingham.
Advertisements

SAUDI ELECTRICITY COMPANY (SEC)
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
1 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
2 Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
The Key Issues in the Korean Electric System
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
0 - Press Conference - Introduction by Mr. Willy Bosmans, President of Eurogas 19 May, 2005, Hotel Hilton Vienna.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.
Energy Regulation Legislation in Sri Lanka
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Electricity Reforms in Bangladesh
Strategies for the security of electricity supply.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Industrial Engineering Roles In Industry
California’s Electricity Industry: yesterday and today James Bushnell University of California Energy Institute
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
February 2004 Korea Western Power Co., Ltd. Presentation to Standard & Poor’s.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
Process of Planning, Designing and Financing a Hospital
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
Presentation to Select Committee on Economic Development
May 2003 Korea Western Power Co., Ltd. Presentation to S&P.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
1 An Autonomous Energy Regulatory System to Enhance Economic Development Jean Constantinescu THIRD ANNUAL ENERGY REGULATORY CONFERENCE FOR CENTRAL/EASTERN.
Engr. Olufemi Dosumu FNSE August, 2016
National Information Technology Center : An Introduction 1.
Korea Electric Power Corporation Investor Presentation
Electricity & Regulatory Overview of Korea
Entrepreneurship and Business Management
Chairman of the Board and CEO,
Lecture 1. Basic definitions
Process Economics Factors that affect profitability
President, Novia University of Applied Sciences Baku, November 2016
Western Michigan University Central Power Plant
EnMS Management Review
Narragansett Electric Rate Classes
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
EE6501 POWER SYSTEM ANALYSIS
Ian Alexander Wednesday, August 13th 2003 SAFIR MYT Workshop, Delhi
Achieving the Internal Gas Market The view of gas suppliers
Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in.
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
Coal – security of coal supply considerations of EURACOAL
1/16/2019 Univ. of Chicago/Argonne Agents 2002, Oct. 12, 2002 Introduction to Electricity Regulation Randal C. Picker Leffmann Professor of Commercial.
Build operate and transfer project delivery System in Saudi Arabia
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
The Government Role in BOT
Chief Executive Officer RAO “UES of Russia”
a. Financing b. Designing c. Construction d. Operating
How We Got Here: A Brief History of Utility Competition
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
The Role of Hydro-Québec in New England Electric Markets The New England Electricity Restructuring Roundtable June 14, 2013 Stephen Molodetz, Vice.
Anna Garcia Air Innovations Conference August 2004
New Horizons for Korean Energy Industry
Photovoltaic Systems Engineering Application to PV Systems
Presentation transcript:

Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in Salon 3 & 4 Don Smith & John Matranga replace Polimeri presentation on Wednesday at 8:45 in Salon 10 Sign up for Feedback Forums at Registration

Real Time Performance Monitoring in Taean TPP Apr. 2004

Overview 1. Overview of KEPCO/KEPRI 2. Overview of WP/Taean TPP 3. Introduction of RTPM for Taean TPP 4. System Configuration 5. Previously… 6. Currently… 7. Future Samples 8. Final Objectives 9. Conclusion

Overview of KEPCO/KEPRI Brief History of KEPCO 1887 First Electricity 1898 First 3 Electric Companies - Hansung - Namsun - Chosun 1961 Merge of 3 Electric Companies - KECO  KEPCO (1982) 2001.4 Separation of Generation Sector from KEPCO - KEPCO (T/D, Marketing) - 6 Generation Co. . 1 Nuclear Power . 5 Fossil Power Now Separation of Distribution and Marketing Sector from KEPCO - KEPCO (T/D) - 6 Distribution Co. 2005 Wholesale Competition 2009 Retail

Overview of KEPCO/KEPRI(cont.) Key Objectives of the Restructuring Plan In January 1999, the Government released the Basic Plan for Restructuring of the Electricity Supply Industry The Restructuring Plan involves the unbundling of KEPCO’s power generation, transmission, distribution and retail businesses in stages, introducing competition into the electricity market. The key objectives of the Restructuring Plan Introduce competition and thereby increase efficiency in the Korean electricity market Ensure a long-term, inexpensive and stable electricity supply Promote consumer convenience through the expansion of consumer choice

Overview of KEPCO/KEPRI(cont.) Summary of the Restructuring Plan Generation Transmission Distribution KPX N G D Phase Ⅰ- Preparation Phase Ⅱ- Generation competition Phase Ⅲ- Wholesale competition Phase Ⅳ- Full Retail 1/1999 12/2000 4/2001 2002 2005 2009 Release of Restructuring Plan Passage of Restructuring Bills Gencos were separated KPX and KEC setup Cost-based pool system begins Genco sales begin Discos will be separated Price-based two- way bidding system will begin * KPX : Korea Power Exchange * KEC : Korea Electricity Commission

Overview of KEPCO/KEPRI(cont.) Phase 1 (Current Industry Structure) KOSEPCO KOMIPO KOWECO KOSPO KEWESPO KHNP Policy control and supervision KPX Consumers IPPs KEPCO Transmission and Distribution PPA Preparation stage (Jan. 1, 1999 to Apr. 2, 2001) IPPs can supply electricity to KEPCO pursuant to existing PPA April, 2001 : Generation Sector separated from KEPCO - Non-nuclear and non-hydro part  5 separate wholly-owned gencos - Hydro and Nuclear part  1 separate wholly-owned genco KEPCO has retained monopoly position for only T&D parts  IPP : Independent Power Producer  PPA : Power Purchase Agreement

Overview of KEPCO/KEPRI(cont.) Phase 2 (Generation Competition) Present phase Cost-Based Pool (CBP) system KPX (Korea Power Exchange) to deal with sale of electricity (MO & SO) KEC (Korea Electricity Commission) for regulation and fair competition Privatization plan of Gencos 1) KOSEPCO was selected as a non-nuclear genco to be sold through public offering 2) After evaluating the result of the 1st stage, next stage will be proceeded.

Overview of KEPCO/KEPRI(cont.) Phase 3 (Wholesale Competition) April, 2005 ~ 2009 Distribution sector will be separated from KEPCO Unbundling process : allocate distribution assets TWBP (Two-way bidding pool) system Vesting contract will be introduced as a safety mechanism to mitigate pool price volatility. Large consumers with demand over 50MW can purchase electricity directly from generation company.

Overview of KEPCO/KEPRI(cont.) Phase 4 (Retail Competition) Final phase of the restructuring plan Consumer can purchase electricity from distribution/retail companies Large consumers with demand below 5MW can purchase electricity directly from generation company in 2009 KEPCO will act as a sole transmission company in Korea

Overview of KEPCO/KEPRI(cont.) Roles and Responsibilities of KEPRI R&D planning and implementation R&D project proposal, selection, and conduct Evaluation, use, and transfer of R&D results Technical home doctor Engineering support and training for facility operation and construction Electric power industry technology evaluation and planning concerning fund management

Overview of KEPCO/KEPRI(cont.) History of KEPRI Now Electricity Laboratory Technology Development Research Laboratory KEPCO Research Center KEPRI (Korea Electric Power Research Institute) (Big Transition Time) Government R&D Policy Technology Research Office at KEPCO Head Office Mckinsey Consulting World Class R&D Institute Invitation of Foreign Scientists Focus on the development of O&M Technologies Significant Economic Contribution to Power Plant Restructuring of Electricity Industry Changes in the Role and Responsibility of KEPRI Research institute for KEPCO and other Gencos R&D funds from Electricity industry and Government Time Name Contents 1961. 7 1972. 3 1984. 5 1995.11 2001. 4

Overview of KEPCO/KEPRI(cont.) Organization President Quality Assurance Team General Administration Office Technology Policy & Planning Office Electric Power Industry Technology Evaluation & Planning Office Power Generation Research Lab. Non-Destructive Evaluation Center Nuclear Power Generation Research Lab. Power System Analysis Center Structural Engineering Lab. New Technology Center

Overview of KEPCO/KEPRI(cont.) Personnel Degree Number Doctor Master Bachelor Others Total 93 244 144 48 529 5% 19% 11% 20% 21% 24% Generation Nuclear T/D Structure Tech. Plan Admin. Academic Background Field Tech. Planning 125 111 101 27 58 107 As of Jan. 2004

Overview of KEPCO/KEPRI(cont.) Budget (2004) Budget 53 50 4 107 Total R&D Project Operational Expenses Investment (Facility & Equipment) Unit: million US$

Overview of WP/Taean TPP

Overview of WP/Taean TPP (cont.) Overview of WP (cont.)

Overview of WP/Taean TPP(cont.) Overview of Taean TPP

Overview of WP/Taean TPP(cont.) Overview of Taean TPP (cont.)

Overview of WP/Taean TPP(cont.) Overview of Taean TPP (cont.)

Introduction of RTPM for Taean TPP Why RTPM is needed in Taean TPP.. Improvement of Power Plant Efficiency Assurance of Reliability, Stability and Safety Decrease in Cost of Power Generation Improved Monitoring of Plant conditions Advanced Method for Long Term & Frequent Data Storage Suggestion of Optimal Operating Condition

System Configuration Previous

System Configuration Suggested POS30 Server (A) ①호기 ②호기 ③호기 ④호기 LAN(Ethernet) Data Buffer Computer PROCONTROL P Bus 87TS50 POS30 Server (A) Ethernet (BNC) HUB TCP/IP Data Server Application LAN Card ①호기 ②호기 ③호기 ④호기 Gateway(1) Gateway(2) 광 허브 Fiber Optic Cable UTP Cable

System Configuration Final

Previously…

Previously…(cont.)

Previously…(cont.)

Previously…(cont.)

Previously…(cont.) Result.xls

Currently… Periodic tasks such as daily reports, calculating efficiency of equipment and estimates of fuel expenses are automatically generated. Through internet/intranet, any authorized person can access plant information which was only accessible in MCR (Main Control Room). Managers and maintenance workers as well as operators can monitor the performance and condition of the plant. Long term data storage for the plant is now possible. Though DCS (Distributed Control System) has its own function for data storage, the logging rate and term were so limited that people had difficulty in analyzing data. We learned that the OSI PI System offers better ways to compress and retrieve data.

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Currently…(cont.)

Future Samples < Samples >

Future Samples (cont.) < Samples >

Final Objectives Data Reconciliation Operating Advisory System Improvement of Reliability and Stability Enhanced Calculation Accuracy Analysis of Combustion and Heat Transfer Distribution

Conclusion Benefits with PI Requirements for Future Improvement Practical Use of Plant Information Sharing of Plant Information Advanced Storage & Retrieve of Plant Information Requirements for Future Improvement More Convenient Method for Tag Management Enhanced Graph Features in PI ProcessBook More Solutions for Various DCS Interfaces

Schedule Changes Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation Cascade moved on Wednesday from 8:00am to 8:45am in Salon 3 & 4 Don Smith & John Matranga replace Polimeri presentation on Wednesday at 8:45 in Salon 10 Sign up for Feedback Forums at Registration