Deliverability Maps for 2017 Peaking Capacity RFP

Slides:



Advertisements
Similar presentations
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
WECC TEPPC Meeting SWAT Update
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Arizona Corporation Commission Workshop
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
1 Impact of the 2004 Hurricanes Hurricane Charley Landfall on August 13 th Customers affected Poles replaced Transformers replaced Miles of wire replaced.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
 2005 Pinnacle West Capital Corporation Special Open Meeting of the Arizona Corporation Commission 2005 Summer Assessment March 18, 2005 Arizona Public.
1 Update on the 2006 Transmission Study LPSC B&E Meeting Baton Rouge, LA November 29, 2006.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Rocky Mountain Power Five Year Study Kick Off Meeting.
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
Arizona Corporation Commission Energy Workshop February 16, 2001.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
Tells what the map is about Shows the location of cities, states, and countries.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
Discussion on Draft Restoration (Black Start)procedures.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
Mental Health Service Area – South West. Mental Health Service Area – Mid West.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
APS Ten-Year Plans th BTA Presentation
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 SRP Attachment K APS Attachment E SRP Facility – Scottsdale, AZ December 15 th, 2015.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
SLIDE 1 SRAS REVIEW TASMANIA REGION July 2013 PRESENTED BY PETER BIDDLE.
1 EMI’s “Bright Future” Solar Project CENTRAL in Jackson – Entergy Property Tracking with tilted axis – Estimated annual yield of 917,400 kWh.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
APS/SRP 2 nd Quarter Stakeholder FERC Order 890 APS Attachment E SRP Attachment K APS Deer Valley Facility Phoenix, Arizona June 21, AM -12 PM.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Navajo Transmission System
APS Deer Valley Facility Phoenix, Arizona June 22, AM -12 PM
Black Start Study Report
CSC DETERMINATION PROCESS
APS Resource Management February 10, 2017
2016 RTP Update November, 2016 RPG Meeting.
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
SPP-Entergy Market Power Analysis
I-5 Corridor Reinforcement Project
Needs Identification.
Title Orientation Author Date Legend Scale
INDOOR BASEBALL / SOFTBALL FACILITY
World Geography use your graphic organizer.
Map Elements TALL DOGS.
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Iowa State University Extension Economist
Do Now Notebooks out.
Excelsior Energy’s Mesaba Energy Project
TOPIC: - GRID REFERENCE
Presentation transcript:

Deliverability Maps for 2017 Peaking Capacity RFP Resource Planning

2017 Peaking Capacity RFP: High Voltage Deliverability Map Navajo Four Corners 500 kV Moenkopi 345 kV Mead 500 kV Cholla 500 kV 345 kV Phoenix Metro Load Pocket (69 kV-230 kV)* Morgan Westwing Low Deliverability Medium Deliverability High Deliverability LEGEND Pinnacle peak 500 kV Westwing, Sun Valley, Morgan, Rudd, Kyrene Kyrene Liberty 500 kV 230 kV * See Figure 2 for Phoenix Metro Load Pocket details Saguaro PV Hub 230 kV Gila Bend 2021 Indicative guidelines for Deliverability of Product to APS Phoenix Metro Load Pocket for purposes of 2017 Peaking Capacity RFP: Information represented here has been prepared by Resource Planning as an indicative guideline for 2021 Deliverability of Product to APS Phoenix Metro Load Pocket as currently estimated for purposes of the 2017 Peaking Capacity RFP. Deliverability rating is representative of current estimations of Deliverability in 2021. Information does not represent official Available Transmission Capacity. Official Available Transmission Capacity can be found on OASIS. Information in these figures is NOT intended to provide definitive guidance to any potential bidder regarding the specifics of the transmission system that may be applicable to bidder’s proposed facility. All bidders are responsible for performing their own independent evaluation of the transmission system as it may affect their proposed facilities. 2

Phoenix Metro Load Pocket 2017 Peaking Capacity RFP: Phoenix Metro Load Pocket Deliverability Map Phoenix Metro Load Pocket (69 kV-230 kV) NORTH-CENTRAL VALLEY SUB-REGION Δ Morgan* NORTH-WEST VALLEY SUB-REGION NORTH SCOTTSDALE SUB-REGION Δ Westwing* Δ Pinnacle Peak* WEST VALLEY SUB-REGION EAST VALLEY SUB-REGION Δ Cactus* SOUTH-WEST VALLEY SUB-REGION Δ Rudd* Δ Ocotillo* LEGEND 2021 Indicative guidelines for Deliverability of Product inside APS Phoenix Metro Load Pocket for purposes of 2017 Peaking Capacity RFP are the same as provided on the previous map. * Substations identified for rough geographic orientation only. Substation identification does not imply APS ownership. 230 kV 69 kV Deliverability Limited by 69 kV system Medium Deliverability: 25 MW in one location. Total of 50 MW in each sub-region. Highest Deliverability: 50-100 MW in one location. Highest Deliverability: 25 MW in one location. Total of 80 MW in each sub-region.