ERGEG South Gas Regional Initiative

Slides:



Advertisements
Similar presentations
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Advertisements

1GTE – October 23rd 2003 Regulation of the gas market in France Dominique JAMME Gas Directorate
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
1 In France, new capacity is developed and allocated via open season procedures The GGPOS establish how an open season should be conducted To compete with.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
Baltic Energy Market Interconnection Plan (BEMIP)
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 July 2007 Gas Interconnection between Spain and France Comments to the TSO’s document on the analysis of the future interconnection infrastructures needed.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
2006 APEX Conference Seoul, October 31, 2006 SESSION 4: Experiences in how to deal with market stress situations. José Javier González Market Operations.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
French transport structure SG meeting Madrid – 15 July 2009.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
How TSOs can further contribute to efficient competition GIE ANNUAL CONFERENCE ATHENS 2005.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
PROGRESS REPORT ON THE DEVELOPMENT OF THE IBERIAN GAS MARKET (MIBGAS) Presentation for South Gas Regional Iniciative 17th September 2007.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
INFRASTRUCTURE USERS: WHAT DO THEY NEED Steinar Solheim, Vice President, Yara International.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
South Region Second Edition
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
GRI-S : Infrastructures The Union list of projects of common interest
Gas Regional Investment Plans
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
Background and Process
South Gas Regional Initiative
Gas Regional Initiative
Achieving the Internal Gas Market The view of gas suppliers
26th February 2015 Teleconference
Transparency Project GRI NW Region.
GIE Annual Conference Bratislava, September 2006
Baltic Energy Market Interconnection Plan (BEMIP)
Enagás, GRTgaz, REN and TIGF
26th February 2015 Teleconference
The work of European energy regulators on generation adequacy
Regulators’ views on Transparency
Meinhard Janssen GIE Board Member
Projects of Common Interest
Market integration Security of supply Competition
Presentation transcript:

ERGEG South Gas Regional Initiative José Angel Sanz Viejo Regulation Director GIE Annual Conference 23rd November 2007

Regional Initiatives Main objectives To make specific improvements in the development of a single energy market in Europe by firstly integrating national electricity and gas markets into regional markets.  This is achieved through the identification and removal of impediments to trade at a regional level.

The South Regional Initiative Countries involved: France Portugal Spain According to ERGEG, this Region “plays an important role for European gas supply”. “It is both a significant gas market in itself with a consumption of nearly 80 billion cubic meters/year (17% of the EU25)” “It contributes to the security of supply by diversification, acting as one of the main entries for natural gas coming from the north of Africa, and for the LNG coming from a variety of origins (87% of LNG supplied to EU25 enters through this region)”.

The South Regional Initiative The three markets are characterized by a small number of indigenous resources, so they have to be supplied by external sources. All of them have LNG terminals that represent a significant part of their national supplies, varying from ¼ of the national supplies in France to around 2/3 of the supplies in Spain. There are a significant number of gas import sources that enhance the security of supply by means of diversification. It can be considered that Portugal and Spain are well integrated, from a physical point of view, but that is not the case of France and Spain, where interconnection level is rather limited.

The South Regional Initiative. Identified priorities Priority I: Interconnection Capacity Priority II: Interoperability Priority III: Transparency Priority IV: Hubs The priorities order is relevant. It is necessary to have solutions in a previous priority before tackling the next one.

Interconnection capacity / demand Priority I: Interconnection Capacity 2007 Taisnières Dunkerke 59 13 Obergailbach Demand 48 Oltingue 3 Biriatou Larrau Demand (bcm) Interconnection capacity (bcm) Interconnection capacity / demand Iberian Peninsula 36 2,6 7% France 48 58,6 122% Demand 36 Units: bcm Nowadays the Iberian Peninsula has an serious lack of interconnection capacity with the rest of Europe

Progress so far: Since April 2006 to October 2007 (I) Two projects will increase slightly the interconnection capacity between France and the Iberian Peninsula. Guyenne 1 Larrau A and B 2010 FR  ES ES  FR Common Value 18,5 30 Units: GWh/d Δ 0,6 Δ 1 Guyenne 1: This investment will increase the capacity between TIGF and GRTgaz networks. It was decided by French TSOs in order to accommodate the flows of Fos LNG plant and most of this capacity (practically 90% of this capacity would be reserved for GdF and Total as main users of the LNG plant of Fos Cavou). Therefore, only 30 GWh/d will be available to the market from 2009. An OSP will be launched in December 2007. Larrau A and B: will increase the capacity between Spain and France at Larrau up to 100 GWh/d. The available capacity will be 100 GWh/d from Spain to France and 18,5 GWh/d from France to Spain. An OSP will be launched around March 2008. It should be noted that this increase of capacity corresponds to investments already decided before the S-GRI was in place. We welcome the fact that some interconnection capacity would be made available to the market. Even if it is very limited (just 30 and 18,5 GWh/d), it is a first step. But, we have one main concern that we would like to point out. The OSP of Guyenne 1 and Larrau A and B will not be launched simultaneously, which implies serious risks for the shippers. Units: bcm However the Open Subscription for Guyenne 1 and Larrau A and B should be launched simultaneously, to avoid serious risks for the shippers.

Interconnection capacity level in some EU countries Planned interconnection capacity Actual interconnection capacity 135% 30% 7 % If the interconnections projects defined in the S-GRI until 2015 were developed, the Iberian Peninsula would have an interconnection level similar to those EU countries with lowest interconnection capacity.

Progress so far: Since April 2006 to October 2007 (II) The current increase of capacity of 0,6 bcm from France to Spain and 1 bcm from Spain to France is not sufficient to satisfy market needs. Guyenne 1 and Larrau A and B were decided before the starting of the regional initiatives projects and not as result of this initiative . Guyenne 1, according to a CRE 2005 deliberation, is for the evacuation of gas from the Fos Cavaou LNG terminal, and a large part of the capacity created will mainly benefit Gaz de France and Total The necessary infrastructures to increase the interconnection have been identified; but, no new investment decision has been made. A decision on the necessary investments to increase the interconnection capacity should be made as soon as possible.

Conclusions Problems have been identified The increase of interconnection capacity between due to investments already decided will be just +0,6 bcm (FR to ES) and 1 bcm (ES to FR) in 2010 No new investment decision has been made. A decision on the necessary investments to increase the interconnection capacity should be made as soon as possible.

Muchas gracias