Contact Persons Yutaka Ushiroda proposed to set up a matrix of responsible persons (contacts) for the various subdetector tasks. He plans to have meetings.

Slides:



Advertisements
Similar presentations
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
Advertisements

André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
ACAT 2002, Moscow June 24-28thJ. Hernández. DESY-Zeuthen1 Offline Mass Data Processing using Online Computing Resources at HERA-B José Hernández DESY-Zeuthen.
EMC review for Belle II (Grounding & shielding plans) Sub-systems ( XXXXX)
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
Shuei MEG review meeting, 2 July MEG Software Status MEG Software Group Framework Large Prototype software updates Database ROME Monte Carlo.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
STAR Operations Workshop 2007 H. Matis1 SSD Operations August 20, 2007 H. Matis for the SSD group.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Program Development Cycle
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Preparation for CERN TB - Erika Garutti1 Preparation for CERN test beam H6 test beam area in Prevessin.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
PXD EVO Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks.
 Project Team: Suzana Vaserman David Fleish Moran Zafir Tzvika Stein  Academic adviser: Dr. Mayer Goldberg  Technical adviser: Mr. Guy Wiener.
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Barcelona Summary Thanks to our hosts for UB for a great meeting!
Brian Drendel October 31, This talk  Beams-doc private/DocDB/ShowDocument?docid=4474https://beamdocs.fnal.gov/AD-
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
CMS ROC Report Patricia McBride May 26, 2005.
L.Vitale INFN and Univ. Trieste
Rainer Stamen, Norman Gee
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
TC activities.
R. Denz, A. Gomez Alonso, AT-MEL-PM
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
B2GM Sessions PXD I: Wednesday, June 6, 16:50-20:20
KEK news ( ) S.Tanaka.
Calibrating ALICE.
CLAS12 Calibration and Commissioning (CALCOM)
Planning for the TDR KEK schedule: Technical Design Report (TDR)
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Overview of CLAS12 Calibration
Status and Plans of the Belle-II Tracking Software Martin Heck
The Fermi National Accelerator Laboratory is a U. S
SVD group organization, schedule, milestones
Presentation transcript:

Contact Persons Yutaka Ushiroda proposed to set up a matrix of responsible persons (contacts) for the various subdetector tasks. He plans to have meetings of subsets of this matrix during B2GM meetings A first draft of PXD contacts has been made and should be agreed upon (not all positions are confirmed yet)

Part I Group PXD Leader Christian Kiesling / Hans-Guenther Moser   PXD Leader Christian Kiesling / Hans-Guenther Moser Liaison Shuji Tanaka Mechanical Design Who knows about mechanical design. By communicating with each other, he/she must be able to solve conflicts in between designs. Karlheinz Ackermann (ack@mppmu.mpg.de) Slow Control Who is responsible to slow control of detector such as control of power supply, monitoring of detector/exp. hall environment. Logging must be done in consultation with Database group. Stefan Rummel (Stefan.Rummel@ph.tum.de) Run Control Who is responsible to data acquisition. In cooperation with central DAQ team, he/she establishes stable DAQ system. Soeren Lange (Soeren.Lange@exp2.physik.uni-giessen.de) Cooling Who is responsible to remove heat from detector. This includes stable/safe operation of chiller system. Alarms to be sent to Slow Control group. Christian Kiesling (cmk@mpp.mpg.de) Susanne Koblitz (koblitz@mpp.mpg.de) Data Quality Monitor Who is responsible to establish monitor system of acquired data quality. Daily monitor may be done by experimental shift crews, while DQM experts must give the best insight into monitor data. Ariane Frey (tbc) Numbering Scheme Specify clear and well-defined numbering rule, book-keep it so that labels on hardware, database, software and human readable document are all consistent. Andreas Moll (molland@mpp.mpg.de) Installation/Commissioning Who is responsible to make detector be (un-)installed and well commissioned. Hans-Günther Moser (moser@mpp.mpg.de), Shuji Tanaka (shuji.tanaka@kek.jp) Space allocation/Logistics Who negotiates limited space in experimental hall. Shuji Tanaka (shuji.tanaka@kek.jp) Radiation / Beam Loss monitor Who commits to the beam loss monitor and radiation monitor around Belle II that issues alert or abort signal in order to protect our detector. Radiation monitor should also measure accumulated dose; this is to know remaining lifetime of detector. Carlos Marinas (cmarinas@uni-bonn.de)

Part II BEAST Who commits to the beam commissioning and background reduction business during early stage machine commissioning. Shuji Tanaka (shuji.tanaka@kek.jp) Carlos Marinas (cmarinas@uni-bonn.de) Material budget monitoring Who monitors material of detector and keep within budget Zdenek Dolezal (dolezal@ipnp.troja.mff.cuni.cz) Grounding Who is responsible to grounding of detector. He/she must understand the best about grounding, shielding and noise in order not to emit/receive noise. Fernado Arteche (farteche@ita.es) Database [taskforce] Implement Online/offline database Sergei Furletov (furletov@physik.uni-bonn.de)   librarian sub-detector software group contact person, who can coordinate every software activities in each sub-detector Peter Kvasnicka (kvasnicka@ipnp.troja.mff.cuni.cz) geometry responsible person who can update the geometry information of the sub-detector, which is used in simulation/reconstruction Martin Ritter (ritter@mpp.mpg.de) simulation responsible person who can update the simulation code including hits creation, digitization beam background overlay responsible person who can handle the beam background overlay Andreas Moll (molland@mpp.mpg.de) beam BG responsible person for the beam background study Christian Kiesling(cmk@mpp.mpg.de) Susanne Koblitz (koblitz@mpp.mpg) reconstruction responsible person who can manage the reconstruction tools Oksana Brovchenko (tbc) alignment responsible person who establishes the automatic alignment constant making and alignment quality check (a part of DQM) Jochen Schieck (Jochen.Schieck@lmu.de) calibration responsible person who establishes the automatic calibration constant making and quality check (a part of DQM) Ivan Peric (ivan.peric@ziti.uni-heidelberg.de)