Status of Cavities at DESY

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Material choice Ofelia Capatina OC, Material choices Discuss material choices for – Helium tank – Flanges, joints, bellow OC,
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Cavity Technical Specification IWLC2010 WG3 industrialization session H. Hayano Geneva,Oct.2010.
ESS cavities interfaces
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
Industrialization of Electropolishing (EP) D.Proch, DESY EP is the preferred cleaning method for superconducting Nb resonators (besides Buffered Chemical.
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
9-cell cavity coordination CM Ginsburg 8 Mar
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Advances in Large Grain Resonators Activities of DESY, W.C. Heraeus and RI material and fabrication aspects preparation and RF test results W. Singer,
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Status of SRF Modules, LLRF, RF Amplifiers & Network
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
JRA1 – SRF report CARE Steering Committee meeting,
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
ELBE SRF Gun Testing Status PeterKneisel (JLAB) For the Rossendorf Team A.Arnold,P.Murcek,J.Teichert,P.Michel,P.Lu, H.Vennekate,R.Xiang T.Kamps (HZB Berlin)
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
LASA status for medium-beta cavity Paolo Michelato.
9-cell cavity coordination CM Ginsburg 15 Mar
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
Status of SCRF Accelerator Activities at CEA-Saclay
Strategy and Status of Reference Cavities for European XFEL
Stress and cool-down analysis of the cryomodule
Status and plans for the 3.9 GHz section of XFEL
Status of developments at CEA-Saclay
ILC-SCRF Test Facilities considerations
DESY Experiences on Use of Gas overlay during Assemblies
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Surface Analysis of the Quench Area Sample of Cavity Z111
S1-G cryomodule assembly status
Effort Torwards Improving Large Scale Production for SC Cavities
Cavity + He Vessel interface
RF-Dipole Cavity Update
World Wide Fundamental Power Coupler meeting #3
Quality control study with single-cell cavities
Highlights from EU Global Design Effort
Degradation and possible sources Statistic of resonators
Performance of Large Grain TESLA cavities
High gradients in TESLA nine-cell cavities
Nick Walker (DESY) EU GDE Meeting Oxford
Cornell Results 20 V 60 V Changing the Growth of Oxide (By Anodizing) Has Small Effects 20 V.
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Development of Large Grain Cavities at DESY
Retreatment of Superconducting Cavities for the European XFEL
Technical Issues Related to Superconducting Accelerator Modules
CEPC-650MHz Cavity Cryomodule
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
QCM and C50-12 Status Update
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Status of Cavities at DESY 06.06.2004 A.Matheisen Overview on cavities Status of available cavities Planed actions in 2005 A.Matheisen MKS3 Module meeting 06.12.04

Resonators installed in modules Name module Tanks typ D1 1star 2 / He line on top D2 A17 A18 S28 3 star S29 S30 S31 S32 S34 4 3/ He line on 45o D36 1 star D37 2 star D40 3star D41 D42 C44 C46 C47 C48 Z50 Name module Tanks typ z51 2 star 2 / He line on top z52 4 3/ He line on 45o Z53 Z54 Ac 55 C 56 AC 57 C 58 3 star Ac 59 Ac 60 5 Ac 61 Ac 62 Ac 63 Ac64 Ac 65 Ac 66 Ac 69 Ac 72 Ac 77 Ac 79 A.Matheisen MKS3 Module meeting 06.12.04

Cavities out of service D3 Tuner test equipment Nb Lips D4 Tuner test Nb lips S7 Exhibit for accelerator technology S8 S9 Test equipment for tuner development S10 Test cavity for welding experiments Nb Ti flanges S11 Exhibit on cryomodule model NbLips S12 D38 Cold leak in cell Nb Ti C 43 Repair at Cerca Leak in weld Ac 67 Cold leak not found no tank A.Matheisen MKS3 Module meeting 06.12.04

Cavity for high gradient module no 6 CAVIYT Number Location Situation Next AC 70 RR/ Chechia ready for module 6 AC 71 qualified for module 6 Tank welding after retest with new antenna AC 73 AC 74 prep  not qualified New EP AC 75 Prep AC 76 AC 78 RR not qualified AC 80 Hall 3 Needs decision AC 81 A.Matheisen MKS3 Module meeting 06.12.04

Cavities for module 7 Cavity Status Next following Last Eacc vertical A15 New flange New BCP Test 20,8 C21 Flanges removed Flange welding New BCP + Test 28,8 C22 19,4 C23 Under work Flange removal 24,0 C24 19,7 C25 27,5 C26 18,2 C27 26,7 Experience with 1st series of cavities for module 1star showed that 2 cavities lost gradient during this operation Spare for module 7 A16 * On hold spare for module 7 Wait for new treatment New BCP+Test 12,7 (31,3 before) D39 21 A.Matheisen MKS3 Module meeting 06.12.04

Spare for module with tank type 3 needed RR/ Cechia Tank type 3 Nb Ti Under retest Ac 68 HOM damping to be tested (deformation on end cell) Nb TI Wait for test C45 Cavity ok test at Saclay Cryholab Tank type3 under test A.Matheisen MKS3 Module meeting 06.12.04

Overview on cavities that can serve as test vehicle Name equipment situation Comments Gradient on vertical test P-1 Nb ti flange Test cavity since 10 Years Only 1.5 mm wall left !! 16,4 P-2 Nb Lip flange stored Need new flanges 15,5 A14 Test cavity for Ep parameter finding Low gradient weld problem Nb TI / Nb Lips 6,3 S35 Leak on reference ring No tank Needs repair Nb Ti 23 ( 28,6 before) Z49 Wait for treatment Nb TI Saclay HOM 17,6 Z 82 Limited by bad weld 1400 C post purification 27,8 Z83 25,0 Z84 23 A.Matheisen MKS3 Module meeting 06.12.04