AliRoot status and PDC’04

Slides:



Advertisements
Similar presentations
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Advertisements

Algorithms and Methods for Particle Identification with ALICE TOF Detector at Very High Particle Multiplicity TOF simulation group B.Zagreev ACAT2002,
October 20th, 2006 A. Mazzacane 1 4 th Concept Software First Results.
New CERN CAF facility: parameters, usage statistics, user support Marco MEONI Jan Fiete GROSSE-OETRINGHAUS CERN - Offline Week –
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
PPR meeting - January 23, 2003 Andrea Dainese 1 TPC tracking parameterization: a useful tool for simulation studies with large statistics Motivation Implementation.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
Framework for Raw Data Thomas Kuhr Offline Week 29/06/2004.
Matching between charged tracks and electromagnetic calorimeter (EMCAL) clusters in ALICE Alberto Pulvirenti University & INFN Catania ACAT 2007 Conference.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
Andreas Morsch, CERN EP/AIP CHEP 2003 Simulation in ALICE Andreas Morsch For the ALICE Offline Project 2003 Conference for Computing in High Energy and.
Track extrapolation to TOF with Kalman filter F. Pierella for the TOF-Offline Group INFN & Bologna University PPR Meeting, January 2003.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
CBM ECAL simulation status Prokudin Mikhail ITEP.
HLT/AliRoot integration C.Cheshkov, P.Hristov 2/06/2005 ALICE Offline Week.
1 Outline: Update on muon/dimuon AOD production (R. Arnaldi/E. Scomparin) Other ongoing activities: MUON correction framework (X. Lopez) MUON productions.
I.BelikovCHEP 2004, Interlaken, 30 Sep Bayesian Approach for Combined Particle Identification in ALICE Experiment at LHC. I.Belikov, P.Hristov, M.Ivanov,
NEC' /09P.Hristov1 Alice off-line computing Alice Collaboration, presented by P.Hristov, CERN NEC'2001 September 12-18, Varna.
Features needed in the “final” AliRoot release P.Hristov 26/10/2006.
Large scale data flow in local and GRID environment Viktor Kolosov (ITEP Moscow) Ivan Korolko (ITEP Moscow)
AliRoot survey: Analysis P.Hristov 11/06/2013. Are you involved in analysis activities?(85.1% Yes, 14.9% No) 2 Involved since 4.5±2.4 years Dedicated.
1 Offline Week, October 28 th 2009 PWG3-Muon: Analysis Status From ESD to AOD:  inclusion of MC branch in the AOD  standard AOD creation for PDC09 files.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
Javier Castillo 1 Muon Embedding Status & Open Issues PWG3 - CERN - 15/02/2011.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
October 10-12, 1 AliRoot: I/O organisation ROOT in the ALICE experiment I/O Structure Run-Time Data-Exchange.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ACOS Report ATLAS Software Workshop December 1998 Jürgen Knobloch Slides also on:
V5-01-Release & v5-02-Release Peter Hristov 20/02/2012.
STAR Simulation. Status and plans V. Perevoztchikov Brookhaven National Laboratory,USA.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
V4-20-Release P. Hristov 21/02/ Changes: v4-20-Rev-14 #78385 Please port AliTPCPreprocessor.cxx Rev to Release #78344 Request to port changes.
RP Software Collaboration Meeting 7 Mars 2007 Hubert Niewiadomski TOTEM, CERN Brunel University.
ALICE Physics Data Challenge ’05 and LCG Service Challenge 3 Latchezar Betev / ALICE Geneva, 6 April 2005 LCG Storage Management Workshop.
AliRoot survey: Calibration P.Hristov 11/06/2013.
Progress on Simulation Software Hai-Ping Peng(USTC) Xiao-Shuai Qin(IHEP) Xiao-Rong Zhou(USTC) Yu Hu(IHEP) 2014 STC Workshop (ITP) Hai-Ping Peng.
V4-19-Release P. Hristov 11/10/ Not ready (27/09/10) #73618 Problems in the minimum bias PbPb MC production at 2.76 TeV #72642 EMCAL: Modifications.
ALICE Offline Week – 22 Oct Visualization of embedding Matevz Tadel, CERN Adam Kisiel, Ohio State University.
ANALYSIS TRAIN ON THE GRID Mihaela Gheata. AOD production train ◦ AOD production will be organized in a ‘train’ of tasks ◦ To maximize efficiency of full.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
LHCb Computing 2015 Q3 Report Stefan Roiser LHCC Referees Meeting 1 December 2015.
January 2009 offline detector review - 2 nd go 1 ● Offline – Geometry – Material budget – Simulation – Raw data – OCDB parameters – Reconstruction ● Calibration.
Calibration: preparation for pa
Data Formats and Impact on Federated Access
Code&Semantic Observations
PPR Production – What Is Available
Visualization of embedding
INFN-GRID Workshop Bari, October, 26, 2004
ALICE – First paper.
ALICE Physics Data Challenge 3
v4-18-Release: really the last revision!
ALICE – Evolving towards the use of EDG/LCG - the Data Challenge 2004
ALICE Production and Analysis Software
Progress with MUON reconstruction
Jet reconstruction in ALICE using the EMCal
Simulation use cases for T2 in ALICE
Analysis framework - status
Monte Carlo Tools in ALICE
TPC status - Offline Q&A
US ATLAS Physics & Computing
Vincenzo Innocente CERN/EP/CMC
Use of Geant4 in experiment interactive frameworks AliRoot
Jet Measurements with the EMCal of ALICE
Muon Group Software Report
ATLAS DC2 & Continuous production
Measurement of b-jet Shapes at CDF
Offline framework for conditions data
Presentation transcript:

AliRoot status and PDC’04 P.Hristov Monthly video-conference February 06, 2004 CERN

Goals(http://cern.ch/fca/ALICE-DCs.doc) Determine readiness of the off-line framework for data processing Validate the distributed computing model PDC’2004:10% test of the final capacity Complete chain used for trigger studies Prototype of the analysis tools Comparison with parameterized MC Simulated RAW data PDC’04 physics: hard probes (jets, heavy flavours) & pp physics

Physics Data Challenge'2004 Simulation: 10^5 Pb-Pb + 10^7 p-p 102 TB 450 KSI2K (~ tier-1 capacity) x 3 months Distributed production, then data are shipped to CERN Reconstruction: 5x10^6 Pb-Pb+10^7 p-p 187 TB Reconstruction is shared between CERN & outside centres according to available resources Data originate from CERN Analysis: 5x10^6 Pb-Pb+10^7 p-p 13 TB See http://aliweb.cern.ch/people/phristov/PDC04.html

PDC’04 Strategy Part 1: underlying events Distributed simulation, production of summable digits, digitization, clusterization, reconstruction, PID, and generation of ESD Data transfer to CERN: kinematics, track references, summable digits (hits for some detectors) Part 2: signal events & test of CERN as data source Distributed simulation, production of summable digits, merging, digitization, clusterization, reconstruction, PID, generation of ESD Part 3: distributed analysis

AliRoot status New tagged version v4-01-03 from today Works with Root v3-10-02 and Geant3 v0-6 (Geant3 + Geom. Modeller ) Simulation (providing Config.C) AliSimulation sim; Sim.Run(# of events); Reconstruction AliReconstruction rec; Rec.Run();

Simulation Configuration: exists for all signal classes Geometry: OK for all the detectors, many overlaps and extrusions corrected (still some in ITS, TOF) Hijing: fixed problems in the quenching, more reasonable distribution => Use Hijing with quenching and without additional energy dependence Configuration: exists for all signal classes AliEn JDL files: template exists

Summable digits, Digits, Merging Ok for all detectors (if applicable) AliVertexGenFile class to set the correct vertex in Config.C for the signal events (needs read access to the galice.root of the underlying event) AliSimulation class used AliSimulation sim; sim.MergeWith(“../backgr/galice.root”,nSpB); sim.Run(nSignal);

Clusters, Reconstruction, PID, ESD Barrel detectors: OK TRD reconstruction fixed Parallel TPC tracking by default ITS dE/dx PID fixed ESD analysis template available Calorimeters: PHOS – OK, EMCAL – ESD is still empty MUON arm: OK, but has not been tested in a large production => potential problems ESD: needs more users

Observations NewIO: has to be simplified, more rigorous approach needed. Now one has too many opportunities => possibility for errors Folders & Tasks: again strict discipline is needed (object ownership, etc.) ESD: possibility to store intermediate results required (in progress) More attention to simple things (new/delete, pointer initialization, etc.)

Conclusions AliRoot is ready for PDC’04  Well tested simulation and generation of summable digits Some problems still expected in the reconstruction (not all the code is stressed enough) Possibility to incorporate additional features before the second part (signal generation) Possibility to repeat the reconstruction of the underlying events

ToDo Estimation of CPU and storage needs for the signal classes AliEn JDL files Start set of tests with AliEn Start the processing of the underlying events Continue PDC04…